• QTZ63 (5013)  tower crane System 1
  • QTZ63 (5013)  tower crane System 2
  • QTZ63 (5013)  tower crane System 3
  • QTZ63 (5013)  tower crane System 4
QTZ63 (5013)  tower crane

QTZ63 (5013) tower crane

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
1 set
Supply Capability:
12 set/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

QTZ63(5013) tower crane tower crane is novel hoisting and conveying machinery which is designed by fully utilizing the group technology, the combinational design technology and the finite element analysis technology and taking the tower crane microcomputer design platform as a tool.
The crane is a horizontal-arm-rest trolley-amplitude upper-revolution hydraulic lifting type crane which has the maximum working amplitude of 56m, the independent lifting height of 40m, the adhesion lifting height of 150m, the rated lifting moment of 710kN•m and the maximum lifting moment of 853.2kN•m. All the performance parameters and technical indexes of the crane meet or surpass national standards.
The crane features advanced parameters, excellent and reliable properties, attractive appearance, high quality, simple and practical structures, advanced safety devices, convenient maintenance, safe usage and reasonable prices, and is ideal construction machinery for many construction enterprises.

The lifting boom and balance boom adopt cantilever boom structure, which reduces the hoisting modular and makes it more safe, convenient and flexible to install and uninstall, and reduces the requirements for hoisting equipment and the site.
2. Multiple special mounting brackets are available, which saves the installation time and ensures safe and quality installation.
3. The lifting boom adopts cantilever boom structure and variable cross-section materials, featuring more reasonable structural stress and long service life; and it is easier to make different combination of boom length.

 

Amplitude(m)

3-13.6

14

15

16

17

18

19

20

21

22

23

Lifting capacity(kg)

4000

3890

3618

3380

3170

2860

2810

2660

2530

2400

2290

Amplitude(m)

24

25

26

27

28

29

30

31

32

33

34

Lifting capacity(kg)

2190

2090

2000

1920

1850

1770

1710

1650

1590

1540

1490

Amplitude(m)

35

36

37

38

39

40

41

42

43

44

45

Lifting capacity(kg)

1440

1390

1350

1310

1270

1230

1200

1170

1130

1100

1070

Amplitude(m)

46

47

48

Lifting capacity(kg)

1050

1020

1000

 

(2)2-magnification Lifting Performance Table


Amplitude(m)

3-26

27

28

29

30

31

32

33

34

35

Lifting capacity(kg)

2000

1920

1850

1770

1710

1650

1590

1540

1490

1440

Amplitude(m)

36

37

38

39

40

41

42

43

44

45

Lifting capacity(kg)

1390

1350

1310

1270

1230

1200

1170

1130

1100

1070

Amplitude(m)

46

47

48

Lifting capacity(kg)

1050

1020

1000

 

Technical Performance Parameter Table


Item

Unit

Magnification

α=2

α=4

Rated lifting moment

kN.m

500

Maximum lifting capacity

t

2

4

Working amplitude

m

3 ~48

Maximum amplitude lifting capacity

t

1.0

Lifting height

Independent

m

30

Attached

m

120

Time of moving outrigger end to rotation center

m

48.74

Time of moving balance arm tail to rotation center

m

12.816

Counter weight

t

7

Total motor power

kW

24.9

Allowable working temperature

0C

-20~+40

 

Q:what can lead tower crane to blank out?
(1) tower crane has crack; (2)Brake block friction lining wear up to 50% ofRaw material thickness ; (3)Brake wheel surface wear reaches 5mm ~ 2mm (4)Spring has plastic deformation; (5)Lever system, air travelis more than about 10% of its rated trip
Q:Just curious... I'm not in construction and always wondered...
The top sections of the mast beneath the crane are removed one at a time and lowered to the ground. The top section of the crane has hydraulic rams that lower it down one mast section at a time. It is hard to describe without a diagram or photos. See photos at attached link. In some design, the jacking portion is at ground level. The crane jacks itself up so a 20' section of the mast can be unbolted and slide out. Then the jack is lowered so the process can be repeated. See second link for photos and a more detailed explanation.
Q:Is it through the rails? if so, then how? or is it by another method?
Hot rails running along side the beams Hot shoes on the crane make contact with the hot rails and slide along the hot rails. Hot rails mounted to the beams by insulating bells. The hot rails can be anywhere in size from trolley wires to rails the size of railroad track rails. AC cranes are usually 3 phase so they will have 3 hot rails. DC cranes will usually have just 2 hot rails. Main disconnect/lock out feeds hot rails. It is usually fused but can also be just a disconnect switch. The same arrangement also is used on the crane's trolley. But in the case of the trolley one set of hot rails feeds the trolley motor. One set of hot rails feeds the main hook {big hook} motor: One set of hot rails feeds the auxiliary hook motor {little hook} motor. If the crane is also used as a Mag crane {Electro magnetic can be used} it will also have a set of hot rails going to the trolley for the magnetic
Q:Hello! My question was a when will type of question, and the results yielded a bird that looked like a crane, egret, or heron standing on one leg and one leg bent. I ve looked at online tea leaf reading symbol dictionaries for heron, egret, and crane but only found two meanings, and I m not sure if they are reputable sources or not, and how they would relate to time.This is a picture that resembled it closely, except the bird I saw is facing the exact opposite direction.Thanks for your help!
Cranes are an extremely ancient symbol, there are folkdances based on their courtship display in many parts of the world, and evidence of this in prehistory too. Excavations at the ancient city of Catal Hayuk in Turkey uncovered the wings of a crane which seemed to have been part of a dancer's costume (google crane dance). Herons and cranes stand around waiting patiently for fish to come along and then move swiftly
Q:So I have this teacher for almost 4 years and I didn't very much liked her style of teaching. During my sophomore year I was getting fed up with having her in my favorite class. Unfortunately she got ovarian cancer. Now that I think for what she has done and not acknowledging her, I feel really bad. To make things up I wanted to give her I guess the 1000 cranes before I leave for college.Is it okay to give it to her? If so, what do you do once you have all 1000 of them folded?
You string them in combination in order that they nest in combination in a protracted garland, after which fold the garland smartly in a field. It might definitely be ok to ship them--in particular for the period of a excursion for decorations-- despite the fact that the special location you might ship it might differ from location to location. I might additionally advise drawing near the media, your loved ones, peers and colleagues and asking them to sponsor cranes, in order that you're sending cash at the side of your thousand cranes. I'm folding cranes for charity. You can sponsor one for 5 greenbacks. Would do the trick, and it might upload to a symbolic gesture.
Q:What is the most likely reason that Crane never tells us the lieutenant's name in episode of war?
The Stephen Crane Society Stephen Crane did not have a middle name. Stephen Crane is buried in ... Would a person be more likely to receive a wound when bravely charging the enemy .... I would be most grateful if you could tell me where I could find this please? .... An Episode of War. How does the facts that the lieutenant is rationing ..
Q:Like those huge cranes on the top of buildings that are being constructed - how do they get them up there???
Piece by piece. Kind of like stacking cups.
Q:Two cranes are lifting identical steel beams at the time.One crane is putting out twice as much power as the other assuming friction is neglible, what can you conclude is happening to explain this difference?
Mechanical advantage. One boom may be at a lower angle than that of the other causing more force to be required to lift.
Q:how to draw a crane hook on auto cad?
Measure a crane hook then draw it. Even better, visit a manufacturer's web site and see if you can download one of their drawings for a hook.
Q:The mobile crane has a weight of 116kip and center of gravity at G1; the boom has a weight of 29kip and center of gravity at G2. Determine the smallest angle of tilt θ of the boom, without causing the crane to overturn if the suspended load is W = 38kip . Neglect the thickness of the tracks at A and B. Determine the smallest angle of tilt θ of the boom, without causing the crane to overturn.
Smallest Crane

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords