QTZ63 (5013) tower crane
- Ref Price:
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 set
- Supply Capability:
- 12 set/month
- OKorder Service Pledge
- Quality Product
- Order Online Tracking
- Timely Delivery
- OKorder Financial Service
- Credit Rating
- Credit Services
- Credit Purchasing
QTZ63(5013) tower crane tower crane is novel hoisting and conveying machinery which is designed by fully utilizing the group technology, the combinational design technology and the finite element analysis technology and taking the tower crane microcomputer design platform as a tool.
The crane is a horizontal-arm-rest trolley-amplitude upper-revolution hydraulic lifting type crane which has the maximum working amplitude of 56m, the independent lifting height of 40m, the adhesion lifting height of 150m, the rated lifting moment of 710kN•m and the maximum lifting moment of 853.2kN•m. All the performance parameters and technical indexes of the crane meet or surpass national standards.
The crane features advanced parameters, excellent and reliable properties, attractive appearance, high quality, simple and practical structures, advanced safety devices, convenient maintenance, safe usage and reasonable prices, and is ideal construction machinery for many construction enterprises.
The lifting boom and balance boom adopt cantilever boom structure, which reduces the hoisting modular and makes it more safe, convenient and flexible to install and uninstall, and reduces the requirements for hoisting equipment and the site.
2. Multiple special mounting brackets are available, which saves the installation time and ensures safe and quality installation.
3. The lifting boom adopts cantilever boom structure and variable cross-section materials, featuring more reasonable structural stress and long service life; and it is easier to make different combination of boom length.
Amplitude(m) | 3-13.6 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | 21 | 22 | 23 |
Lifting capacity(kg) | 4000 | 3890 | 3618 | 3380 | 3170 | 2860 | 2810 | 2660 | 2530 | 2400 | 2290 |
Amplitude(m) | 24 | 25 | 26 | 27 | 28 | 29 | 30 | 31 | 32 | 33 | 34 |
Lifting capacity(kg) | 2190 | 2090 | 2000 | 1920 | 1850 | 1770 | 1710 | 1650 | 1590 | 1540 | 1490 |
Amplitude(m) | 35 | 36 | 37 | 38 | 39 | 40 | 41 | 42 | 43 | 44 | 45 |
Lifting capacity(kg) | 1440 | 1390 | 1350 | 1310 | 1270 | 1230 | 1200 | 1170 | 1130 | 1100 | 1070 |
Amplitude(m) | 46 | 47 | 48 | ||||||||
Lifting capacity(kg) | 1050 | 1020 | 1000 |
(2)2-magnification Lifting Performance Table
Amplitude(m) | 3-26 | 27 | 28 | 29 | 30 | 31 | 32 | 33 | 34 | 35 |
Lifting capacity(kg) | 2000 | 1920 | 1850 | 1770 | 1710 | 1650 | 1590 | 1540 | 1490 | 1440 |
Amplitude(m) | 36 | 37 | 38 | 39 | 40 | 41 | 42 | 43 | 44 | 45 |
Lifting capacity(kg) | 1390 | 1350 | 1310 | 1270 | 1230 | 1200 | 1170 | 1130 | 1100 | 1070 |
Amplitude(m) | 46 | 47 | 48 | |||||||
Lifting capacity(kg) | 1050 | 1020 | 1000 |
Technical Performance Parameter Table
Item | Unit | Magnification | ||
α=2 | α=4 | |||
Rated lifting moment | kN.m | 500 | ||
Maximum lifting capacity | t | 2 | 4 | |
Working amplitude | m | 3 ~48 | ||
Maximum amplitude lifting capacity | t | 1.0 | ||
Lifting height | Independent | m | 30 | |
Attached | m | 120 | ||
Time of moving outrigger end to rotation center | m | 48.74 | ||
Time of moving balance arm tail to rotation center | m | 12.816 | ||
Counter weight | t | 7 | ||
Total motor power | kW | 24.9 | ||
Allowable working temperature | 0C | -20~+40 |
- Q:I am reading catching fire and I'm at the part where Katniss just made a little dummy in the training session and she wrote the name seneca crane on it and the gamemakers were like shocked. Who is seneca crane? and whats up with her?
- Seneca Crane was the previous Head Gamemaker. He was the one who didn't think past Katniss and Peeta eating the berries. President Snow makes it evident that he was executed for his mistake with the games. I still don't understand why she did it, or why they were so shocked. It probably just offened them, or maybe it was something of a threat, that she'd meant to get him killed. Who knows?
- Q:how do they erect those large tower cranes you see on big building projects?
- with another crane. assemble the tower first in sections, assemble the jib on the ground then lift it into place
- Q:when high rise buildings are built a crane is erected to lift iron and cement up. How do they erect these cranes?
- They are erected onto themselves..
- Q:I've only read Hunger Games and watched the movie and noticed a large presence of Seneca Crane in the movie.However, I don't recall him being mentioned in the Hunger Games? Is he even mentioned in the Hunger Games? If so, please provide pages.I know he is definitely mentioned in Catching Fire but I haven't read that yet.
- No they just wanted to show who he was and what he did. How he died and why
- Q:How to calculate life span of steel structure? for example, crane?
- With bridges that you would be able to calculate an anticipated lifespan. It is going to now not be very particular. You measure the deflection as a given load goes over it. You also measure deflection with average site visitors.You are taking measurements of what normal visitors is. With this knowledge that you would be able to undertaking lifespan and prefer exchanging bridges earlier than they crumple. Once I was once a engineering student I had a summer time job serving to to experiment bridges.Most bridges and gigantic constructions are designed to are living 50 years I believe. For constructions I have no idea of any measurements you would take. I think it is most often a matter of periodic inspections. The things to seem for are basis problems, cracking of concrete, exposed re-bar, concrete flaking off etc.
- Q:as the crane cabin temprature is very high which is not good for equipment pls advise which air condition is good for colling
- Any crane worth it's salt can take the temperature but for the operator you can do a Coleman RV Air Conditioner.
- Q:Does a crane have a pulley?AND....Is an axe a wedge?THANX CUZ I DONT KNOW WHAT IM DOING, AND OMG IM SO GOING TO FAIL MY TEST BECAUSE IM SO DUMB.
- Yes, a crane has a pulley in order to reduce the workload. Each time there is a loop of the pulley made the workload is reduced.
- Q:There are a range of cranes to be selected for a particular type of job. Please provide any suitable method so that we narrow down our selection criteria .
- What is the load weight? How high is the lift? Obstruction, possibly needing a jib? If you are placing a load onto a roof, how far from the edge of the roof is the load going to be placed? How far from the crane pivot is the load on the ground and how far are you going to to move the load away from the crane to place it in position? How close can you get the crane to the load and to the load placement site. The usual scenario is to call a crane outfit and they will ask you these questions over the phone or come to the site and discuss the lift with you. A crane is rated for maximum lift as close, usually 10 feet,to the cab pivot center. As the distance increases, the maximum load that can be lifted, decreases. Our 15 ton crane can pick 15 tons/ 30,000 pounds at 10 feet from pivot center. With the boom fully extended; the boom is 100 feet, at a 30 degree angle, it can pick up only 5,000 pounds. Inside of every crane cab should be a chart that shows the lift capacity at various boom angles and boom lengths. Also is included is a chart for the Jib, if the crane has one. Wingman
- Q:where did the story originated from? how and why did it happened?
- i thought it was off dumbo, a cartton of an elephant with big ears and it could fly lol ==]
- Q:What is the easiest way to transport vertically? What is applicable?What is the difference between tower crane and tower crane?
- Tower crane is tower crane. It depends on where you are and what you transport. These are the keys.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Similar products
New products
Hot products
Related keywords
You Might Also Like