Product Description:

QTZ50(5010) tower crane is hoisting and conveying machinery which is designed by fully utilizing the group technology, the combinational design technology and the finite element analysis technology and taking the tower crane microcomputer design platform as a tool and has excellent performance.

The crane is a horizontal-arm-rest trolley-amplitude upper-revolution hydraulic lifting type crane which has the effective amplitude of 50m and the maximum lifting moment of 500kN•m. The tower crane has the lifting height of 30m and the adhesion lifting height of 120m (2 magnification) during independent use.
All the speed indexes of the crane meet or surpass national standards.
The crane has the total installed capacity of 25.5kW, features advanced parameters, excellent and reliable properties, attractive appearance, high quality, simple and practical structures, advanced safety devices, convenient maintenance, safe usage and reasonable prices, and is ideal construction machinery for many medium-small construction enterprises.

The lifting boom and balance boom adopt cantilever boom structure, which reduces the hoisting modular and makes it more safe, convenient and flexible to install and uninstall, and reduces the requirements for hoisting equipment and the site.
2. Multiple special mounting brackets are available, which saves the installation time and ensures safe and quality installation.
3. The lifting boom adopts cantilever boom structure and variable cross-section materials, featuring more reasonable structural stress and long service life; and it is easier to make different combination of boom length.

Technical Performance Parameter Table


Item

Unit

Magnification

α=2

α=4

Rated lifting moment

kN.m

500

Maximum lifting capacity

t

2

4

Working amplitude

m

3 ~50

Maximum amplitude lifting capacity

t

0.8

Lifting height

Independent

m

30

Attached

m

120

Time of moving outrigger end to rotation center

m

50.74

Time of moving balance arm tail to rotation center

m

12.816

Counter weight

t

8.54

Total motor power

kW

25.5

Allowable working temperature

0C

-20~+40

2.1 Hoisting and Lifting characteristic curve characteristics table

(1)4-magnification Lifting Performance Table


Amplitude(m)

3-12.5

13

14

15

16

17

18

19

20

21

22

Lifting capacity
(t)

4

3.832

3.534

3.276

3.050

2.850

2.673

2.514

2.371

2.242

2.124

Amplitude(m)

23

24

25

26

27

28

29

30

31

32

33

Lifting capacity
(t)

2.017

1.918

1.828

1.744

1.667

1.595

1.528

1.466

1.407

1.353

1.301

Amplitude(m)

34

35

36

37

38

39

40

41

42

43

44

Lifting capacity
(t)

1.253

1.207

1.164

1.124

1.085

1.048

1.013

0.98

0.949

0.918

0.89

Amplitude(m)

45

46

47

48

49

50

Lifting capacity
(t)

0.862

0.836

0.811

0.787

0.764

0.742

(2)2-magnification Lifting Performance Table


Amplitude(m)

3-23.9

24

25

26

27

28

29

30

31

32

Lifting capacity
(t)

2

1.99

1.90

1.81

1.74

1.66

1.60

1.53

1.47

1.42

Amplitude(m)

33

34

35

36

37

38

39

40

41

42

Lifting capacity
(t)

1.37

1.32

1.27

1.23

1.19

1.15

1.11

1.07

1.04

1.01

Amplitude(m)

43

44

45

46

47

48

49

50

Lifting capacity
(t)

0.98

0.95

0.92

0.90

0.87

0.85

0.82

0.80

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Detailed parameters of QTZ80 tower crane 50
You made the tower crane. All manufacturers are not necessarily the same
Q:What is the allowable range of vertical deviation for tower cranes?
The specified installation, construction, demolition of tower crane safety technical regulations in JGJ196--2010: the allowable deviation of verticality Tower: in the wind under no-load, the tower axis line should be less than 4 per thousand of the bearing surfaces of the lateral vertical deviation; after the attachment, the highest attachment point following the vertical deviation should be less than 2 per thousand. According to the installation state of tower crane, the deviation range of verticality is divided into 4/1000 or 2/1000. Tower crane maximum independent installation height (maximum installation height, does not need to be attached to the wall of the instructions specified in the free end) and height (the highest point of a tower crane attached to the wall above the height, body the following provisions in the specification of tower crane slewing) the vertical deviation range was 4/1000; tower crane attachment verticality deviation below the allowable range is 2/1000.
Q:What are the characteristics of a tower crane?
Four, according to the different installation methods of cranes, can be divided into folding transport, self erection of the rapid erection of tower cranes and the need to use the auxiliary machine assembly and disassembly of tower cranes.Can set up their own fast loading crane are small and medium slewing tower crane, mainly used for short duration, low buildings move frequently, the main advantage is to improve work efficiency, save installation cost, save time and labor and material, disadvantage is the complicated structure, large amount of maintenance.A tower crane that needs to be disassembled and assembled by an auxiliary machine is mainly used in middle and high rise buildings, with large working range and large lifting capacity. It is the main type of construction site at present.Five, according to whether the spire structure, can be divided into flat head tower crane and tower tower crane.Tower crane is a new type of tower crane is developed in recent years, its characteristic is the tower cap and the rod part before and after the cancellation in the structure of the original tower crane on the enhanced structural strength of the arm and balance arm, arm and balance arm is directly connected, the utility model has the advantages of:1 、 the whole machine is small in size, easy to install and safe, reduce transportation and storage costs;2, the boom of tolerance and good performance, uniform stress, small damage on the structure and connection part;3, component design can be standardized, modular and interchangeable, reduce equipment idle, improve investment efficiency.It is in the same type of tower crane tower crane head Zhongping slightly higher prices.
Q:Notice of tower crane
Installation condition of 3.2 tower crane3.2.1 tower crane has special equipment manufacturing license, product certification, manufacturing supervision and inspection certificate, the tower crane manufactured abroad should have product certification, and has been in the construction administrative departments for registration.3.2.2 tower cranes shall be of complete structure and conform to the provisions of GB5144 "safety regulations for tower cranes".3.2.3 under the following circumstances, tower cranes are not allowed to use:If the state has been eliminated from the designated period of time, exceeding the prescribed service life assessment, the safety devices and safety facilities can not meet the safety and technical standards of the state or industry; there is no complete safety technical file.3.2.4 tower cranes must be maintained and fully checked before they are installed. Structural parts with visible cracks, severe corrosion, overall or partial deformation, connecting shafts (pins), Kong You, severe wear and tear should be repaired or replaced, in accordance with the provisions of the installation.3.2.5 tower crane foundation should meet the requirements of the use manual, the carrying capacity of the foundation must meet the requirements of tower crane design, installation should be carried out before the hidden project acceptance, qualified before installation. Slope and drainage facilities should be built around the foundation.The track foundation and track laying of 3.2.6 walking tower crane shall be carried out according to the instruction manual and shall comply with the provisions of GB5144.
Q:How to distinguish self lifting tower crane with counterweight and lifting tower crane without counterweight
2 the tower crane without counterweight is mainly the city fast loading tower crane. It is characterized by the absence of balance arm, and it is impossible to have counterweightThe layman can not tell the can see the appearance, there are long steel structure before and after the weight of the tower body, and no weight of the tower body with only one steel structure (i.e. jib crane, structure)
Q:How to install the jack up tower crane 30How to install the jack up tower crane?
Looking for technical personnel to install, you fuck what heart?.
Q:Lifting tower crane tower more than 45 meters, the demolition cost and how to adjust the field Sinotrans transportation fees?
Self lifting tower crane tower 45 meters high to prevail, such as height of over 45 meters, each increased to 10 meters (less than 5 meters, excluding) demolition costs increase 20%, off-site transportation costs increased by 10%.
Q:What is the standard weight of a tower crane for 1.6*1.6*3 and 1.6*1.6*5m? Kg?
The standard weight of tower cranes for 1.6*1.6*3 and 1.6*1.6*5m is 500KG
Q:Operation points of tower crane (tower crane)?
Slewing bearing: tower crane is one of the most critical components, mainly to bear overturning moment and vertical load. After the failure, the demolition and replacement is extremely difficult, loss of large, so you have to check carefully to do maintenance, each 200H must be a senior grease lubrication from the rotary bearing surface, until now exudation. Slewing bearing adopts high strength bolt connection, if the pretension is not enough, or long-term operation, do not check, not fastening, will cause loose. If the individual bolts loose, will cause the remaining bolts overload, the consequences will be disastrous. The luffing mechanism only moves horizontally, the load is light and the line speed is not high, so it should be easy to master and operate. However, the amplitude involves the change of the lifting torque, and if there is no stopping in time, there will be the possibility of over torque. Therefore, the main requirement of variable amplitude operation is stationary parking and accurate positioning. The tower crane is of great height and the hanger is hung longer, so it is easy to swing the hanger when it is running. This is an objective phenomenon. What is called stabilization hook operation is how to make the swinging hook stop quickly, or how to make the hook move with the movement of the crane as soon as possible, and minimize the operation of the swing. The operation of stabilization hook is the skill that the driver should master.
Q:In order to ensure the stability of tower cranes, generally along the height of the tower and building a number of meters attached
Self lifting tower crane tower 45 meters high to prevail, such as height of over 45 meters, each increased to 10 meters (less than 5 meters, excluding) demolition costs increase 20%, off-site transportation costs increased by 10%.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range