• QTZ125S tower crane System 1
  • QTZ125S tower crane System 2
  • QTZ125S tower crane System 3
  • QTZ125S tower crane System 4
QTZ125S tower crane

QTZ125S tower crane

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
1 set
Supply Capability:
12 set/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

QTZ125S tower crane is hoisting and conveying machinery which is designed by Shandong Fuyou Co., Ltd. by fully utilizing the group technology, the combinational design technology and the finite element analysis technology and taking the tower crane microcomputer design platform as a tool and has excellent performance.

The crane is a horizontal-arm-rest trolley-amplitude upper-revolution hydraulic lifting type crane which has the effective amplitude of 50m and the maximum lifting moment of 438kN•m. The tower crane has the lifting height of 29m and the adhesion lifting height of 120m (2 magnification) during independent use.

All the speed indexes of the crane meet or surpass national standards.
The crane has the total installed capacity of 24.9kW, features advanced parameters, excellent and reliable properties, attractive appearance, high quality, simple and practical structures, advanced safety devices, convenient maintenance, safe usage and reasonable prices, and is ideal construction machinery for many medium-small construction enterprises

The lifting boom and balance boom adopt cantilever boom structure, which reduces the hoisting modular and makes it more safe, convenient and flexible to install and uninstall, and reduces the requirements for hoisting equipment and the site.
2. Multiple special mounting brackets are available, which saves the installation time and ensures safe and quality installation.
3. The lifting boom adopts cantilever boom structure and variable cross-section materials, featuring more reasonable structural stress and long service life; and it is easier to make different combination of boom length.

Technical Performance Parameter Table


Item

Unit

Magnification

α=2

α=4

Rated lifting moment

kN.m

400

Maximum lifting capacity

t

2

4

Working amplitude

m

3 ~50

Maximum amplitude lifting capacity

t

0.8

Lifting height

Independent

m

29

Attached

m

120

Time of moving outrigger end to rotation center

m

50.74

Time of moving balance arm tail to rotation center

m

12.816

Counter weight

t

8.54

Total motor power

kW

24.9

Allowable working temperature

0C

-20~+40

(1)4-magnification Lifting Performance Table


Amplitude(m)

3-10.966

11

12

13

14

15

16

17

18

19

20

Lifting capacity(t)

4

3.98

3.64

3.36

3.10

2.89

2.70

2.54

2.39

2.26

2.14

Amplitude(m)

21

22

23

24

25

26

27

28

29

30

31

Lifting capacity(t)

2.04

1.94

1.85

1.77

1.69

1.62

1.56

1.50

1.45

1.39

1.35

Amplitude(m)

32

33

34

35

36

37

38

39

40

41

42

Lifting capacity(t)

1.30

1.26

1.22

1.18

1.14

1.11

1.08

1.05

1.02

0.99

0.97

Amplitude(m)

43

44

45

46

47

48

49

50

Lifting capacity(t)

0.94

0.92

0.89

0.87

0.85

0.83

0.81

0.80

(2)2-magnification Lifting Performance Table


Amplitude(m)

3-21.4

22

23

24

25

26

27

28

29

30

Lifting capacity(t)

2

1.94

1.85

1.77

1.69

1.62

1.56

1.50

1.45

1.39

Amplitude(m)

31

32

33

34

35

36

37

38

39

40

Lifting capacity(t)

1.35

1.30

1.26

1.22

1.18

1.14

1.11

1.08

1.05

1.02

Amplitude(m)

41

42

43

44

45

46

47

48

49

50

Lifting capacity(t)

0.99

0.97

0.94

0.92

0.89

0.87

0.85

0.83

0.81

0.80

 

Q:What do the words neck-craning and neck-straining mean in the sentence below?Sports cars are often designed to make a statement, and many of the newest models do that with neck-craning styling and neck-straining performance.
the ''neck craning'' styleing referrs to the fact that the car is so beautifull that people can't help but look at it. the ''neck straining'' in the context of this sentence referrs to the fact that the car is so powerfull it can hurt your neck muscles with the torque and the G forces.
Q:I read the book and thought of a theory... I think that the headless horseman is just and alter ego Brom Bones alter ego and he wanted to kill Brom Bones for his beloved Katrina Van Tassel... I want to hear your opinions and theories possibly involving what you think Katrina said to Ichabod during the party. That would be nice thank you.
What Happened To Ichabod Crane
Q:don't its wheel provide the same amount of friction?
the capacity of a travelling crane relates to its resistance to tipping, and is dependent upon wheelbase, which can be extended by use of the outriggers, and counterweight (the big boxy thing at the back of the crane). Every lift requires a firm and stable platform which is what the outriggers provide. For every lift (weight) and reach (how far from the slew point), there is a limiting capacity factor. This is required to be posted within the operator's cab. The actual load lifted may be monitored by a load cell on a running rope (or other location), and through a computer control, limit the actual capacity of the crane.
Q:How do you win something from those crane machines in stores?????
Spongebob says to Squidward, Be the crane. Holding the button until it releases to the door, don't letting go of the button helps me win something, don't let the time run out, look for a place where the claw can hook up to something like an attachment or box . Sometimes it is pure luck. I won about 600 different things from jewrly, watches, stuffed animals, precious moments porcelain boxes, rings, landyards, and collectibles. Sometimes double or triple at one time. Good luck!!!!
Q:What is the inspection certificate for tower cranes?
Inspection certificate of tower crane must have two certificates:1, the manufacturer issued its own "product quality certificate"2. The product quality supervision and inspection certificate issued by the Technical Supervision Bureau
Q:Before the Advent of the Railroad Steam Recovery Crane Car (pictures below), how were Locomotive Steam Engines recovered after a derailment from the 1830's to the 1890's?
Old Man Dirt is right. Block and tackle. Remember too those early engines weren't that heavy. The most common type from 1850 to the 1890s was the 4-4-0. They, and the other types were usually between 25 and 60 tons. I don't necessarily collect old rail photos, but I've seen many hundreds in other people's collections. And early locomotive salvage was usually block and tackle, with another engine brought in to furnish the muscle required. Since this could be a lengthy process if the wreck was extensive, a temporary track, or sometimes called a shoo-fly would be built to move trains past the derailment, or to enable getting another engine and hoisting equipment positioned.
Q:A crane operator must ensure that the load is within load chart ratings for _________ and the __________ of the crane.A. Boom length; CenterpointB. Boom length; Load RadiusC. Center Point, Load RadiusD. Center of Gravity; Load Radius
B. The load radius is the horizontal distance from the center of rotation of the crane to the center of gravity of the load being lifted. The load radius is a critical consideration when determining what size crane is required for most lifts. There is generally a chart that tells what that machine will lift at any boom length,
Q:who invented them and why do people make them?
in Japanese folklore if you fold a 1000 origami cranes you get are granted a wish, usually concerning health/long life. The peace part comes from the story of Sadako Sasaki a victim of the Hiroshima atomic
Q:Old used 200 t crawler crane is available for purchase. What are the guidelines/ thumb rules for assessing its cost ?
Supply vs demand Extreme examples: If the crane is no longer needed anywhere, the cost will be 0; no demand. If the crane still has a unique useable function and there is only one available, it's immediate cost will be very high; no supply. So, assuming that the cranes supply/demand is somewhere in the middle, the methodology for assessing it's cost would be to evaluate the following: * Where is it located with respect to where it is needed? (place value) * How quickly do I need it, and how quickly can I get the crane? (time value) * What alternative solutions are available? * How much do other similar cranes cost? * etc Hope this helps!
Q:the question is :Two cranes can unload a ship together in 15 hours. The faster crane takes 16 hours less than the slower crane, if each were to unload the same ship alone. How long doesi t take for each crane to unload this ship? I done most of the math but i am stuck with this last part .15+- radical 1185/2
No. of hours for the slower to unload alone—x: 1/x + 1/(x - 16) = 1/15 (x - 16 + x)/(x? - 16x) = 1/15 15(2x - 16) = x? - 16x 30x - 240 = x? - 16x x? - 46x = - 240 x? - 23x = - 240 + (- 23)? x? - 23x = - 240 + 529 (x - 23)? = 289 x - 23 = 17 x = 40 No. of hours for the faster to unload alone: = 40 - 16 = 24 Answer: slower crane, 40 hrs; faster crane, 24 hrs Check: = 15(1/40 + 1/24) = 15([3 + 5]/120) = 15(8/120) = 15(1/15) = 15/15 or 1

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords