Q6015 10 tons Topkit Tower Crane TC6015 high quality

Ref Price:
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 pc
Supply Capability:
2 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

 

Quick Details

  • Feature: Tower Crane

  • Condition: New

  • Application: All construction projects

  • Max. Lifting Load: 10 tons

  • Span: 60m

  • Place of Origin: China (Mainland)

  • Brand Name: CNBM

  • Model Number: Q6015

  • Certification: ISO9001 & CE & GHOST

  • Warranty: 12 Months

  • After-sales Service Provided: Engineers available to service machinery overseas

  • Color: Any

 

Main Features

 

1) TC6015 tower crane is one of the key product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.

 

2) This kind of crane adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected; The max. attached height can reach 180m.

 

3) It has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.

The range-change structure drives the dolly to change range on the horizontal arm, with good positioning performance. Planet gear decelerator is applied in the circumgyrating structure, together with moment-limiting hydraulic coupler, which can relize high load capacity, steady starting and reliable operation.

 

4) The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter, weight limiter, circumgyrating limiter, etc.

 

5)The machine has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operator.

 

Q6015 10 tons Topkit Tower Crane TC6015 high quality

Q6015 10 tons Topkit Tower Crane TC6015 high quality

Q6015 10 tons Topkit Tower Crane TC6015 high quality

Q6015 10 tons Topkit Tower Crane TC6015 high quality

Q6015 10 tons Topkit Tower Crane TC6015 high quality

 

 

Specification Parameter

 

 

 

 

 

Packaging & Shipping

 

All our packing ways are standard packing. In wood case or carton, as you like. After the production, we will do our best to do the shipping as soon as possible. Best Service is our sart of business.

 

Our Services

1.We can make special sample according to the customer’s requirement.

2. We have more than 60 professional technical team, provide best after-sales service

3. Fast delivery time

4. We have CE, ISO9001 and GS certification.

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What are the special operators of tower cranes?
The tower has special operations personnel of heavy machinery refers to the construction site in the tower crane division signal cable, installation and disassembly, the driver, and the demolition work of gondola installation, may cause serious harm to themselves, others and the surrounding facilities operations personnel.
Q:How do tower cranes rise?
Tower crane, or tower crane, commonly known as tower crane, originated in Europe in the early twentieth Century. It has been used for more than one hundred years, and plays an important role in transportation, logistics, construction and other fields. Since tower cranes look like a tower far away, the way they lift up has become a topic of interest. In fact, according to the functions of the crane can be divided into: foundation, tower, lifting, rotating, lifting, balancing arm, lifting arm, lifting trolley, tower, cab, variable part in building tower crane should first install base part. That is to determine the tower crane erection position, determine the principle to maximize the tower crane construction capacity, convenient tower crane entrance and exit and installation, disassembly. Then choose the right foundation type.
Q:Construction tower crane operator certificate expires, how to verify?
Six, related requirementsEach enterprise shall, according to the notification requirements, arrange the personnel engaged in the work of this unit, and invite every unit to earnestly examine and clean up, and those who have not obtained the certificate will sign up for the training. The certificate into the industry qualification management, obtain the job qualification certificate, can engage in the corresponding work, and as an important basis for certification.Seven, registration requirements and locationsStarting from now on, please bring your ID card copy and one inch registration photo for you when you sign up for two. Fill in "Chongqing construction crane operator qualification table", the applicant's employer to the District Construction Committee, post training center application.Contact: He Zongfang, Hu Baofeng, zip code: 401120Tel: 67376688 Fax: 67800098E-mail:ybjsgp@163.comHttp://www.cqybjs.com (Yubei construction information network)Hereby notifyChongqing Yubei District construction post training centerFebruary 20, 2008
Q:Four for crane, two for insurance, two for insurance. What does that mean?
Four limit: torque, ultra high, variable amplitude, walking limit device. Two insurance: hook insurance and reel safety device.
Q:What is the scrap standard of tower crane hook?
The American Standard can provide for your reference:1, hook hanging points in the effective area of cross sectional wear more than 10%, should be disabled and scrapped.2 any visible permanent deformation and cracks shall be disabled and scrapped.3, if the wear is in the same area in two directions, it should be controlled within 5%.4, any hook opening deformation is not greater than 5%, or in accordance with the manufacturer's guidelines to determine.5, hook bow hook (i.e. intermediate position hook C shape) wear amount should be less than 5%.
Q:The earthing resistance of tower crane shall not be greater than that of the tower crane
The lightning resistance of tower crane (tower crane) on the construction site shall be no more than 4 ohms.I. tower crane GB/T 5031--20085.5.5.9 lightning protectionIn order to avoid lightning stroke, the main structure of the tower crane, the motor frame and all the electrical equipment metal shell, wire metal protection tube should be reliable grounding, and its grounding resistance should be no more than 4 ohms. When multiple repetitive earthing is adopted, the grounding resistance shall be no more than 10 ohms.Two. Safety regulations for tower cranes GB 5144 - 20068.1.3 tower crane metal structure, track, all electrical equipment metal shell, metal line pipe, safety lighting transformer, low voltage side should be reliable grounding, grounding resistance is not more than 4 ohms. Repeated earthing resistance is not greater than l0. The selection and installation of the earthing device shall comply with the relevant requirements of the electrical safety.The insulation resistance of the 8.1.7 main circuit and control circuit shall not be less than 0.5M ohm.
Q:What measures should be taken to make tower cranes stable?
Phosphating coating of steel wire rope, give priority to the use of manganese or zinc manganese phosphating, and smooth steel wire rope production process comparison, just add the last bonderizing process, steel wire, wear resistance and corrosion resistance is greatly improved, the use of the wire without direct phosphating cold twisted steel wire rope.
Q:What are the safety devices for tower cranes?
(6) the rail clamp is used to clamp the rail, prevent the crane from walking by wind in the strong wind, and cause the tower crane to derail and overturn the accident.(7) the wind meter automatically records the wind speed, and automatically alarms when more than six wind speed is over.(8) the anti stripping device of the steel wire rope is mainly used to prevent the steel wire rope from disengaging from the pulley groove during the transmission process(9) the hook insurance prevents the lifting of the steel wire rope because of the excessive angle or the wrong hook, and causes the lifting wire rope to be broken off and the suspension falling accident.
Q:What are the components of a tower crane? What are its main technical parameters? What is lifting torque?
Part: foundation, tower, wall unit, excessive section, lifting mechanism, rotating mechanism, lifting mechanism, the lifting arm, a balance arm, electrical control, safety protection device etc..Main technical parameters: maximum lifting weight, amplitude and maximum amplitudeLifting torque = magnitude X maximum amplitude lifting
Q:How much is a team of 40 tower crane
Tower crane rental generally do not rent pricing, can not count number, not today is installed, removed tomorrow!Usually on a monthly basis, with or without use!

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range