1.Quick Details
Model Number: LF1700*1219
Material: Q235 steel
Color: Orange,red,blue
Surface treatment: Painting
Technique: CO2 arc welding
Main tube diameter: 42mm
Main tube thickness: 2.0/2.2mm
Quality Test: SGS
Type: Double Row Scaffolding
Application: For Inside And Outside Constructions
Life Span: About 5 years
2.Packaging & Delivery
Packaging Details:
Delivery Detail:
Double Row Scaffolding is in steel pallet,suitable loaded in container. |
after deposit 10 days |
3.Feature
Double Row Scaffolding
1.Easy to erect.
2.Light duty scaffolding.
3.Easy to transport.
4.Specifications of Double Row Scaffolding
NO. | Specification | Weight | Thickness |
H Frame A | 1930*1219mm | 13.5kg | 2.2mm |
H Frame B | 1930*1219mm | 12.5kg | 2.0mm |
H Frame C | 1700*1219mm | 12kg | 2.2mm |
H Frame D | 1700*1219mm | 11.5kg | 2.0mm |
H Frame E | 1524 *1219mm | 10.6kg | 2.0mm |
5.What is considerations of Scaffolding installation?
There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,
(1) scaffold frontage hurtful to prevent falling objects protection is required.
(2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator
- Q:2009 and 2010 construction of secondary construction division of the exam questions and answers, Jiqiu ~!
- 2009 and 2010 construction of secondary construction division of the exam questions and answers, Jiqiu ~
- Q:Please advise the construction industry experts: residential full scaffolding inside the frame how to calculate the number of steel pipe needs, pay attention, I asked how many meters! Or tell me how many meters per square meter of steel pipe? And then attached to the high requirements, thank you For example: now a layer of 1000 square meters area, a total of 10 standard layer of residential buildings, 3 meters high! How to calculate the amount of steel required to do a layer? The amount of steel pipe in meters, or tonnage units.
- Steel pipe commonly used specifications for 1m-6m first determine your height and length, width
- Q:Sprinkling water on the construction helps to help reduce haze days
- Sprinkling the construction site is an effective means to reduce the construction of dust, you can indirectly less haze days
- Q:What is the bamboo board for the scaffolding of the building?
- Scaffolding, also known as scaffolding, in the scaffolding, the operating frame laying, to facilitate workers walking in the top, transport materials and construction operations of a temporary turnover of the use of building materials
- Q:what do you call a place of great significance? such as the scaffold in the Scarlet Letter?
- Historical a place with alot of history attached to it Landmarks
- Q:I have a concrete transport arm pump, would like to ask which building materials companies need to use, can be resident
- That is, the upper and lower with a pump on the 90-degree bend, the two of them with the root 1 m straight tube connected to each other, and the other round steel to do two large diameter 18 meters, and then some straight round 2 large circle made of a hoop, and then the two straight with elbow straight fixed Below the elbow tow pump up the pump tube, the top elbow root 2 m straight tube It can be in the range of 4 meters to rotate the fabric, such as to move the car can be used in place
- Q:my scaffold piercing has been bleeding since yesterday and ive had it done for 3 month what do i do?help?!?
- Probably infected. I recommend you see an internist medical specialist for your condition and have them perform a diagnostic test. That way, you can find out the nature extent of the problem and a treatment plan can be formed. Good luck.
- Q:What is the most important safety hazard at the construction site?
- Civilized construction Site fencing Some works in the urban area of ??the main section of the site is not set above the 25m fence some site fence material is not strong, unstable, not clean, do not meet the local aesthetic requirements
- Q:Two window washers, Bob and Joe, are on a 3.00 m long, 380 N scaffold supported by two cables attached to its?
- Oh, Ashley, you can't fit more than an intro in the what would you like to ask. More room in details.
- Q:What would you like to ask?At what height do scaffolds have to be engineered?
- At all heights...they are engineered as a system.
1. Manufacturer Overview |
Location |
|
Year Established |
|
Annual Output Value |
|
Main Markets |
|
Company Certifications |
|
2. Manufacturer Certificates |
a) Certification Name |
|
Range |
|
Reference |
|
Validity Period |
|
3. Manufacturer Capability |
a)Trade Capacity |
|
Nearest Port |
|
Export Percentage |
|
No.of Employees in Trade Department |
|
Language Spoken: |
|
b)Factory Information |
|
Factory Size: |
|
No. of Production Lines |
|
Contract Manufacturing |
|
Product Price Range |
|