Q235 Steel Frame Typ Construction Material CNBM

Ref Price:
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
20 m.t
Supply Capability:
3000 m.t/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1.Quick Details

  • Model Number: RS-S

  • Material: Q235

  • Diameter: 48.3mm

  • Thickness: 3.25mm

  • Surface: Hot Dipped Galvanized

  • Minimum Order Quantity: 20 tons

  • Packaging Details: Steel Pallets

  • Certificate: CE

Q235 Steel Frame Typ Construction Material CNBM

2.Packaging & Delivery

Packaging Details:steel pallet

Delivery Detail:

3.Product Description

Model No: RS-S

Product Name: Ringlock scaffolding system-Standard

4.Features:

1. Standard:  Made of 48mm O.D. x 3.2mm thickness high grade steel tube, 1 discal leg 0.5meter, Length: 3000, 2500, 2000, 1500, 1000, 500mm etc. Available, and can be to ordered by you,

2. Ledger: Made of 48mm O.D. x 3.2mm thickness high grade steel tube, length800mm/ 1500mm, length can be ordered.

3. Ring: Made from cast-steel or pressed steel

4. Ledger connection-peg: made from cast-steel,

5. Base screw jack: length 600mmx3.5mm thickness strength tube, length to be order, solid tube available.

6. U head screw jack: length600mmx3.5mmthickness strength tube with U head plate, length can to be order, solid tube available.

7.  Surface: painted/electro (hot dipped) galvanized or to be order

8.  Also can manufacture it as your requirement.

5.

Ring   Lock System Scaffold Bay Brace / Diagonal Brace

Model

Description

Weight(kg)

Weight(lbs)

AR.DB.3050x2000

Ring Lock Bay Brace 3050x2000mm (10')

10.87

23.96

AR.DB.2745x2000

Ring Lock Bay Brace 3050x2000mm (10')

10.24

23.96

AR.DB.2440x2000

Ring Lock Bay Brace 2440x2000mm (8')

9.62

21.20

AR.DB.2130x2000

Ring Lock Bay Brace 2130x2000mm (7')

9.03

19.91

AR.DB.1830x2000

Ring Lock Bay Brace 1830x2000mm (6')

8.51

18.76

AR.DB.1520x2000

Ring Lock Bay Brace 1520x2000mm (5')

7.91

17.45

AR.DB.1220x2000

Ring Lock Bay Brace 1220x2000mm (4')

7.62

16.80

AR.DB.1150x2000

Ring Lock Bay Brace 1150x2000mm (3'10")

7.53

16.61

AR.DB.1065x2000

Ring Lock Bay Brace 1065x2000mm (3'6")

7.44

16.41

AR.DB.910x2000

Ring Lock Bay Brace 910x2000mm (3')

7.29

16.07

AR.DB.650x2000

Ring Lock Bay Brace 650x2000mm (2'2")

7.08

15.62

AR.DB.610x2000

Ring Lock Bay Brace 610x2000mm (2')

6.90

15.21





AR.DB.3072x2000

Ring Lock Bay Brace 3072x2000mm

10.95

24.14

AR.DB.2572x2000

Ring Lock Bay Brace 2572x2000mm

9.89

21.81

AR.DB.2072x2000

Ring Lock Bay Brace 2072x2000mm

8.93

19.69

AR.DB.1572x2000

Ring Lock Bay Brace 1572x2000mm

8.10

17.86

AR.DB.1400x2000

Ring Lock Bay Brace 1400x2000mm

7.86

17.33

AR.DB.1286x2000

Ring Lock Bay Brace 1286x2000mm

7.71

17.00

AR.DB.1088x2000

Ring Lock Bay Brace 1088x2000mm

7.47

16.47

AR.DB.1036x2000

Ring Lock Bay Brace 1036x2000mm

7.41

16.34

AR.DB.1020x2000

Ring Lock Bay Brace 1020x2000mm

7.40

16.32

AR.DB.880x2000

Ring Lock Bay Brace 880x2000mm

7.26

16.01

AR.DB.732x2000

Ring Lock Bay Brace 732x2000mm

7.14

15.74





AR.DB.3000x2000

Ring Lock Bay Brace 3000x2000mm

10.77

23.75

AR.DB.2500x2000

Ring Lock Bay Brace 2500x2000mm

9.74

21.48

AR.DB.2000x2000

Ring Lock Bay Brace 2000x2000mm

8.80

19.40

AR.DB.1500x2000

Ring Lock Bay Brace 1500x2000mm

8.00

17.64

AR.DB.1000x2000

Ring Lock Bay Brace 1000x2000mm

7.38

16.27





AR.DB.2400x2000

Ring Lock Bay Brace 2400x2000mm

9.55

21.06

AR.DB.1800x2000

Ring Lock Bay Brace 1800x2000mm

8.47

18.68

AR.DB.1200x2000

Ring Lock Bay Brace 1200x2000mm

7.60

16.76

AR.DB.900x2000

Ring Lock Bay Brace 900x2000mm

7.28

16.05

6.What is considerations of Scaffolding installation?

There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,

(1) scaffold frontage hurtful to prevent falling objects protection is required.

(2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How do I get permission to go on to scaffolding?
You can rent one of your own. Getting all the contractors, owners and subcontractors to let you sign a waver will not get you far ... in the end if you fall off, your survivors will still sue.
Q:Scaffolding and scaffolding, what is the difference
Different materials: scaffolding is mainly used in Q235 carbon steel tube, plate type scaffold is Q345 high strength low alloy structural steel.
Q:What kind of piercing would you recommend a scaffold piercing in the ears cartlidge or a belly button piercing?
I have both my cartilage and my belly button pierced. I love them both! Cartilage piercing was initially less painful until you had to turn it once a day during cleaning - that hurt a lot. Also, whichever side you get it pierced on - it will hurt SO bad if you sleep on that side. It takes around 8 months to a year to completely heal. Cost was $40. Belly button - It felt like a pinch when I got mine done. Clean this one 2x a day with sea salt soaks. Don't swim until it is completely healed. It takes 6-8 months to completely heal. Cost was $20 on half price piercing day - so it's usually $40.
Q:Why do so many buildings in Manhattan have scaffolding on the street level?
A few years ago pieces of building facades were falling onto the sidewalks. The city then insisted that all building facades be inspected and repaired. You are seeing the results of the inspections.
Q:Does it matter what size your ear is when you get an industrial/scaffolding piercing?
Some people's anatomy is not proper for industrial piercings. The size of your ear might probably won't matter but other factors can.
Q:What is the meaning of WDJ in the WDJ bowl buckle scaffold
The general term of the construction industry, refers to the construction site used in the external walls, interior decoration or high level can not be directly construction.
Q:Why do a mobile tower scaffolds have wheels fitted with brakes?
So it can be partially assembled, moved into position, then the brakes are put on so it doesn't move while it's in use.
Q:scaffold piercing help?
It is probably hypotrophic scarring. Cartilage piercings, especially all types of industrials, are prone to this type of scar. Hypotrophic scarring is a bump surrounding the exit hole, the same color as your skin. It may feel hard, but often are not painful. They are usually caused by jewelry putting pressure on the piercing, and the body responds by scarring. Hypotrophic scarring is often due to pressure on a piercing. Changing your jewelry is usually the best move. If the scar is around a ring or other curved jewelry, switch to something straight, like a barbell. If it's on an industrial, put individual jewelry in each piercing. Consult your piercer for jewelry changes in unhealed piercings. Time and oil massages often improve scarring. If hypotrophic scars don't improve after some time, steroid injections and certain topical creams may help. Consult a doctor to see if this is an option.
Q:How to help a scaffold piercing heal?
your body wont reject it cuz its cartilage and it wont reject. its just sore becuase you just go a while ago so it will hurt of a couple of weeks
Q:Physics question! A man stands on a scaffold...?
Required conditions for equilibrium (Other wise the scaffold is moving) Sum of forces = 0 Sum of Torques = 0 Sum of Forces Painter: 800 N DOWN Scaffold: 100 N Down Sum of tensions in chains = 800 + 100 = 900 N UP Sum of Torques (Pick one end, it does not matter which. I choose the Left end) Torque = Force * Lever arm Painter is 3.0 meters from Left end Tp = 800 N * 3.00 m = 2,400 N-m CW (Clockwise) Center of gravity is at the center of the scaffold or 4/2 = 2 meters from the Left enf Ts = 100 * 2 = 200 N-m CW This means that the chain on the Right end must supply 2400 + 200 = 2600 N-m CCW Tc = Fc * 4.00 m 2600 = Fc * 4 Fc= 650 N UP Total need up is 900 N====> 900 - 650 = 250 N in Left chain QED

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range