Q235 ID 15 Scaffolding for Formwork System
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1000 kg/m²
- Supply Capability:
- 10000 kg/m²/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
1.Structure of ID 15 Scaffolding Description:
ID 15 Scaffolding is designed for supporting the formwork system in construction, Can be used to be tower, it is popular in UAE.
2.ID 15 Scaffolding advantages:
ID 15 Scaffolding adapts flexible to any wall geometry
Fast due to pre-assembled panels with built-in plywood
Strong with 80 kN fresh concrete pressure per m2 allowed
Economical due to longer service life and fewer parts
Hire option given in selected regions
Hot selling ID 15 Scaffolding with low price
our scaffolding ID15 which is consists of base head,frame 133,frame 100,end frame,diagonal).
and it's compatible with ID 15 perfectly.
It's easy to erect and fit in your work compared with conventional method, saving you 20% working time .
ID 15 Scaffolding Quick Details
Place of Origin: China (Mainland)
Brand Name: ID 15 Scaffolding
SCAFFOLDING: tower
Packaging & Delivery
Packaging Details: | iron packed |
Delivery Detail: | upon receipt of 30% of deposite after confirmed the order |
3.ID 15 Scaffolding Products pictures:
4.ID 15 Scaffolding Specification:
5.FAQ
We have organized several common questions for our clients, may help you sincerely:
1)How many Scaffolding your company have?
Here comes our 5 types of Scaffolding systems:
- Cup lock Scaffolding(C-Lock Scaffolding)
- Ring lock Scaffolding
-Kwistage Scaffolding
-H-frame Scaffolding
-ID15 Scaffolding Tower, this type Scaffolding is the most widely used in construction, such like bridge.
2)How long can we receive the product after purchase?
Lead time is about 30days after getting the signed PI and deposit.
- Q:opinions on scaffolding piercing and how to hide it from school :)?
- While they're healing, they need to stay in so there's no way of hiding it. Wait until the beginning of the summer and get it done then
- Q:21M high full scaffold erection scheme
- 2 should be based on the results of the inspection to improve the construction organization design of the demolition of the order and measures, approved by the competent authorities before the implementation;3 removal of debris and ground barriers on the scaffold.4.2 removal of scaffolding, should meet the following requirements:
- Q:What is the rental price of the mobile scaffolding and accessories now? How to rent a law?
- Mobile scaffolding in general are on the basis of rent by the day
- Q:What is the difference between Scaffolding and Zone of Proximal Development?
- Taken from okorder: Vygotsky believed that when a student is at the zone of proximal development for a particular task, providing the appropriate assistance (scaffolding) will give the student enough of a boost to achieve the task. Once the student, with the benefit of scaffolding, masters the task, the scaffolding can then be removed and the student will then be able to complete the task again on his own.
- Q:Scaffolding installation process, construction preparation
- Construction preparation(1): steel pipe should be consistent with current national standard "carbon structural steel" (GB/T700) regulations Q235- grade steel; new steel pipe should be the product quality certificate; steel surface should be flat and smooth, no cracks, scarring, delamination, dislocation, bend, burr, indentation and scratch depth, pipe diameter deviation not more than -0.5mm, the wall thickness deviation not greater than -0.5mm, cutting slope deviation not greater than 1.7mm, the steel surface should be brushed with antirust paint; old steel corrosion depth not greater than 0.5mm, more than the prescribed steel shall not be used.(2): buckle made of malleable iron fasteners, the material should be consistent with current national standard "steel pipe scaffolding fasteners" (GB15831) regulations; old buckle inspect before use, shall not have cracks, deformation, bolt appear smooth silk must be replaced; new and old fastener must brush good antirust paint.(3) foot board: the use of 4m long wooden foot board; foot width of not less than 200mm, the thickness is not less than 50mm, both ends should be set with a diameter of 4mm galvanized steel hoop two; rotten feet can not be used.(4) safety net, paint.(5) after the inspection and acceptance of the above parts have been classified and piled up in a neat and orderly manner, no water can be accumulated.2, scaffolding erection and removal(1) scaffold erection
- Q:i have now got lumps on my scaffolding and i have searched and it seems to be normal.. i just want to know how to get rid? any ideas? :)
- It recommends tea tree oil, or vitamin E oil applied directly to the area.
- Q:there is also shrubs and trees planted on the base of the wall and 14 feet from it
- Scaffolding and Cherry picker is your best option.
- Q:Erection of steel scaffolding tools and safety supplies
- Anti falling device, professional tool bag, work boots (soft bottom shoes), safety lighting, transportation tools, pulley, skateboard rope, dustproof mask, special conjoined clothes, ear plugs
- Q:Was thinking of getting one. How much do they cost?
- your okorder /... and they usually cost about 40$
- Q:It's when u get two ear piercing and there connected by a tongue ring. So question is where can I get it and how old? I'll be gettin it in Rhode island . Please anwser
- Daddy didn't hug you a lot I take it. Are you going to get a tramp stamp too? Remember if you want to be a proper non-conformist you have to wear the uniform.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Q235 ID 15 Scaffolding for Formwork System
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1000 kg/m²
- Supply Capability:
- 10000 kg/m²/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Related keywords