pvc windows and doors

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

  • PVC sliding doors /Glass sliding windows

Product description:

1 Lowes glass folding door have large open sapce which can achieve the greatest extent, making the smooth flow of indoor and outdoor and  a wide field of vision

2 the load-bearing capacity of the bottom of the sliding system can be up to 180KG ,so that the entire fans push-pull smoothly, lightly and have no noise.

3 model cavity adopts diene propylene ethylene monomer (DPEM) sealing strip crash.,not easy to be aging, durable, to achieve a more complete sealing effect.

4 can be configured 5 +6 A +5 and 5 +9 A +5 double-insulating hollow glass, to achieve the best sound effects: anti-theft, high-performance of security; prevent heat transfering effectively, to achieve the best insulating properties

5 the under-track design dual waterproof tape and drainage systems to solve the past problems about  strips aging and leakage

6 European advanced technology, and the tightness can be up to 0.02/m.h, watertightness can be up to 450pa.

Large Folded under the pulley:

It can be done more fans on both sides or the side of the folded piece. With good tightness, and using the bottom wheel load-bearing of sliding door, can be overload wihtout being blocked. with double-sided D-handle, and ease to switch door and could be adapted to different needs in space. This series is the best choice for balcony, living room, meetings, office partitions

Hot products Aluminium folding door Aluminium windows and doors

Products characters:

♦Folding flexible,can resistance typhoon if adopt high slide rail

♦Extra special waterproof and airtightness treatment

♦Economical,nice price performance

♦Double hollow glass,nice heat and sound insulation

♦Decorative bar design available,anti-theft

♦Nice EPDM sealing performance

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:There are doors and windows installed with main and auxiliary boxes
The use of foam caulking agent is also called styrofoam, plus cleaning agent.
Q:The construction method of wall tiles
Q:Building interior decoration (construction) construction time node, for example, the wall putty putty, spray latex paint and doors and windows frame installation, paving tile order The
Only for the living room and bedroom (kitchen and toilet can be synchronized) grass-roots treatment --- Chong Qiang --- wall head putty --- floor tiles - installation door frame, bag mouth --- grinding to find --- 2 times putty , Baseboard installation --- last latex paint. Note that as long as do not let the tiles polluted the walls of the final finish on it. Want to save points to scratch the end of the sub-package door. Intermediate processes are generally not so rigorous.
Q:Aluminum doors and windows production, installation need to pay attention to what? What are the technical requirements?
In the production process is the most important attention to the size of the problem, if the size is not right, then that is the most troublesome! Installation is to adjust the bits are good, others too tight or too loose doors and windows!
Q:The installation method of color steel activity room
① Before installation, the construction unit shall check the product certificate, design document and pre-assembly record of the component, and check the size of the recording component. Deformation of the steel structure, defects beyond the allowable deviation should be processed. Before installation, should be prepared in detail the measurement and correction process, thick steel plate welding should be installed before the simulation of the product structure of the process test, the preparation of the corresponding construction process. On the assembled roof truss should be a certain degree of arrogance. ② steel structure hoisting in place, the component positioning axis, elevation and other design requirements of the control point to do a good job marking, the quality of the lifting connector for welding before the inspection. Installed temporary support and steel cable to make steel roof truss in the construction process safe and stable. ③ steel installation, the construction unit should be submitted to each component after lifting the elevation size, welding, painting, etc. were submitted to the supervision and acceptance.
Q:Four-wheel positioning adjustment screw how to install
Four-wheel positioning requires tilting and pulling rods. Adjustment screw, extensive application of oil refining. Chemical. Car. Ship. Medical. Food. Packaging. Light industry and other mechanical equipment in the control system. Door frame adjustment screw, which is an easy-to-process, combined door and window frame adjustment screw consisting of a screw sleeve with a screw, which is provided with a longitudinal slit for said The first staples of the rear end of the screw are passed through the first-order hole of the screw sleeve, and the first-order hole is elastically deformed to expand its aperture so that the catching flange passes The front end of the first step hole is located at the front edge of the first stage hole and the rear end flange of the rear end of the screw is limited to the rear hole of the first stage hole, whereby the structure Easy, quick assembly of progressive benefits.
Q:Glass curtain wall and doors and windows to do what information? Do you want to do some information when you install the doors and windows frame? The
Sub-box, lightning protection, waterproof, the main frame and the sub-frame connected to the screws, these are hidden, to cover the acceptance records, the rest do not need to attach the form, the main frame is installed, with inspection batch form, glass ibid.
Q:What is the window frame section
Section is cross-section, take a 6M aluminum alloy material, the two incision is a cross-section
Q:I would like to ask the doors and windows to install the master, the frame installed after the glue is good, or wait until the next glass together with plastic?
Box installed after filling the expansion agent, there is no gap can not fight, with the latter loaded a glass of money relationship is not. Glass is made of glass
Q:Do doors and windows and curtain wall construction is carried out at the same time or cross-operation? Trouble experts to mention something
To see how your project is like, it should not be affected, if there is a cross before the doors and windows in the curtain wall, pay attention to the edge of the problem, leakage problems.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range