Pure Acrylic Polymer Emulsion,Acrylic Waterproof Coating

Ref Price:
Loading Port:
China main port
Payment Terms:
Min Order Qty:
5000 kg
Supply Capability:
20000 kg/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1.Structure of Acrylic Waterproof Coating Description:

Acrylic waterproof coating is a kind of  new building waterproof coating with perfect waterproof performance, high technical content.Hypo-coating is used pure acrylic emulsion and multivariate polyacrylic emulsion as basic material, adding a variety of additives and inorganic filler  After coating,it can be formed strong tenacity, stick relay elastic waterproof membrane, combined with basic to form a firm and  soft waterproof system, to adapt to the deformation of structure,achieving the effect of long-term waterproof impermeability.

2.Main Features of Acrylic Waterproof Coating :

Can be worked on  damp or dryvariety of material  status.

Coating tenacity, high strength, water resistance, high and low temperature resistance, aging resistance. Uv radiation resistance is better than general waterproof products.

Service life is  for more than 15 years.

Strong cohesive force, good extensibility and opitional colors.

One-component, easy for construction, short time  for a project.

On-toxic, tasteless, and is now often used for solvent substitute for waterproof coating,such as polyurethane coating, coating of SBS,etc.

3.Acrylic Waterproof Coating Specification:               

Solid content % ≥65
The tensile strength ≥1.0 Mpa
Elongation at break300%
Low temperature flexible    φ10mm  at -10℃at -10℃ no crack      
impervious    (0.3  Mpa,30MIn)               No

4.Acrylic Waterproof Coating Images:

Pure Acrylic Polymer Emulsion,Acrylic Waterproof Coating

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How do you make waterproofing in the kitchen and bathroom?
Kitchen and toilet to do waterproof, it is recommended to use kitchen and toilet waterproof paste, it is specifically for the kitchen and toilet water and easy to seepage yin and yang angle, pipe, sanitary ware, floor drain and other parts of the development, special materials, so waterproof Ordinary waterproof material is better, and waterproof coating construction is more convenient, only need to brush 2-3 times, the thickness of 1.2-1.5MM on it. Specific construction methods are as follows: 1, will penetrate the root, floor drain and other cracks, need to repair the site cut into "V" shape, and clean, sprinkler moist; 2, the [infiltration of crystalline repair mortar] add water (water and ash weight ratio of 1: 2 ~ 3) mixed evenly, in the early condensate before (5 minutes) to repair the construction, the root of the pipe, the floor drain, yin and yang, Should be made r angle; 3, repair mortar after the final setting, the [durable waterproof paste] powder and liquid material mixing evenly, put it aside for 3 minutes, and then stir evenly after brushing on the base surface, should be cross brush twice, and so on The first time after the dry, can be carried out the second time construction; 4, after the completion of anti-stamped, 48 hours after the closed water test.
Q:How does the finished ventilator manufacturer waterproof?
In the latest country set JJCJ33 clearly stipulates that the structure to be waterproof, refers to the internal ventilation of all nodes and ventilators and roof all the nodes,
Q:Roof leakage, what materials do the best waterproof
hird, for some of the city building cover the construction of red tiles leakage, as long as the removal of tiles on the grass, moss or dust after the replacement of tiles, leak-proof effect is the same. For flat roofs, the roof of the obvious cracks, with the tool will be cracked into a "V" or "U" shape, filling the caulking ointment, filled with cracks and above the use of waterproof wrap around the package. To strengthen the leak-proof effect, you can also shop a layer of waterproofing membrane. Note: Before the waterproofing and draining construction, the roof must be dry, because the roof of the water does not evaporate, the new waterproof layer will rise, the waterproof effect immediately invalid.
Q:Roof sunscreen waterproof layer leakage, brush milk white plastic can solve it?
How to deal with the roof leakage, the roof leaks to find the first leak, looking for the main leak from the roof to the lower to find leakage. The first is to see if there is no cracks in the roof, the original waterproof layer is not aging, the roof of the original SBS waterproofing membrane has no bubbles, there are bubbles to prove that the water has entered the bottom of the waterproof layer, and thus leaking. There is a block on the roof of the gutter is not blocked in the countryside, there are still a large number of tile-roofed house, when the tiles due to damage caused by the roof leakage, as long as the replacement of tiles can be, this step is also known as "
Q:How to ensure the waterproof quality of the underground shear wall (retaining wall)?
3, according to the hydrogeological conditions and outdoor environment type to take the appropriate level of waterproof concrete.
Q:Eastern rainbow waterproof how to do
especially small places to pay attention, such as: sewer such as. And then dry about 10 hours or more, (see the environment may be, like a dry) so repeated 3 side painting is appropriate.
Q:Nanning building waterproof material market where
Nanning this building waterproof coating does not seem to have a special market, waterproof materials like fast ring building materials market, Wan Tai Long have to sell, as well as Mingxiu Road and Mingxiu Road on both sides of the road have a heavy focus on waterproof materials and companies
Q:Roof for the insulation, Master roof, using two waterproof construction program
Fourth, the finished product protection 1, has been laid the membrane waterproof layer, should be taken to protect the facilities, is strictly prohibited in the waterproof layer on the construction operations and transportation, and should be timely to do the protective layer of the waterproof layer. 2, through the roof, wall waterproof layer at the pipeline, construction and after the completion of damage shall not damage. 3, deformation joints, water, etc., before the construction of waterproof layer, should be temporary closure, waterproof layer is completed, should be cleared to ensure that the tube, sewn smooth, to meet the use of function. 4, roof construction shall not pollute the walls, cornices and other finished products.
Q:I would like to ask how to do in the warm water above,
Rough housing or liquid with a good, airtight than the coil is good, all-pervasive, if there is a trachoma in the case of white do not see the white. If the building from the building if the first waterproof, finished product protection is a problem.
Q:Oriental rain rain waterproof how to
Oriental rain rain waterproof paint is not good to say it, but real to do it, rely on the quality of their own business for the relentless pursuit and practice. Oriental rain rain waterproof coating from the selection to the production to the final product testing are as much as possible meticulous.

1. Manufacturer Overview

Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range