Professional ID 15 Tower Scaffolding from China

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1000 pc
Supply Capability:
1000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1.Structure of ID 15 Scaffolding Description:

ID 15 Scaffolding is designed for supporting the formwork system in construction, Can be used to be tower, it is popular in UAE.

 

2.ID 15 Scaffolding advantages:

ID 15 Scaffolding adapts flexible to any wall geometry

Fast due to pre-assembled panels with built-in plywood

Strong with 80 kN fresh concrete pressure per m2 allowed

Economical due to longer service life and fewer parts

Hire option given in selected regions

Hot selling ID 15 Scaffolding with low price

our scaffolding ID15 which is consists of base head,frame 133,frame 100,end frame,diagonal).

and it's compatible with  ID 15 perfectly.

 It's easy to erect and fit in your work compared with conventional method, saving you 20% working time .

ID 15 Scaffolding Quick Details

Place of Origin:  China (Mainland)

Brand Name: ID 15 Scaffolding

SCAFFOLDING: tower

 

Packaging & Delivery

Packaging Details:

iron packed

Delivery Detail:

upon receipt of 30% of deposite after confirmed the order

 

3.ID 15 Scaffolding Products pictures:

Professional ID 15 Tower Scaffolding from China

 

1.Structure of ID 15 Scaffolding Description:

ID 15 Scaffolding is designed for supporting the formwork system in construction, Can be used to be tower, it is popular in UAE.

 

2.ID 15 Scaffolding advantages:

ID 15 Scaffolding adapts flexible to any wall geometry

Fast due to pre-assembled panels with built-in plywood

Strong with 80 kN fresh concrete pressure per m2 allowed

Economical due to longer service life and fewer parts

Hire option given in selected regions

Hot selling ID 15 Scaffolding with low price

 our scaffolding ID15 which is consists of base head,frame 133,frame 100,end frame,diagonal).

and it's compatible with  ID 15 perfectly.

 It's easy to erect and fit in your work compared with conventional method, saving you 20% working time .

ID 15 Scaffolding Quick Details

Place of Origin:  China (Mainland)

Brand Name: ID 15 Scaffolding

SCAFFOLDING: tower

 

Packaging & Delivery

Packaging Details:

iron packed

Delivery Detail:

upon receipt of 30% of deposite after confirmed the order

 

3.ID 15 Scaffolding Products pictures:

 

Professional ID 15 Tower Scaffolding from China

 

5.FAQ

We have organized several common questions for our clients, may help you sincerely:

1How many Scaffolding your company have?

Here comes our 5 types of Scaffolding systems:

- Cup lock Scaffolding(C-Lock Scaffolding)

- Ring lock Scaffolding

-Kwistage Scaffolding

-H-frame Scaffolding

-ID15 Scaffolding Tower, this type Scaffolding is the most widely used in construction, such like bridge.

2How long can we receive the product after purchase?

Lead time is about 30days after getting the signed PI and deposit.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Whats a scaffold in ac brotherhood?
Wrong category. Post under Video and Online Games.
Q:How badly does getting an industrial/scaffolding piercing hurt?
my experience was easy and fast. it was the next day waking up that kills you! keep in mind that its thick cartilage, but it is really worth it. you'll get used to it by like day 3 or 4 but and tug or pull will remind you of the pain. i recommend it!
Q:Want to rent the scaffolding in the county, you need to cast how much money
In addition, there are disc scaffolding and other accessories, so you can estimate how much you need to invest
Q:what happened when author dimmesdale went to the scaffolding in town square?
Which time? The first time he went there at night, admits his sin, mets up with Hester Prynne and Pearl, and an A appears in the sky. The second time, Arthur Dimmesdale reveals this secret to the public. He then has a heart attack on the scaffold and dies.
Q:in the scarlet letter, what events happen at the scaffold during the night??
On the Scaffold Dimmesdale is really starting to go crazy. the guilt in his heart about loving hester is eating him up. he goes onto the scaffold thinking no one will see him. he is punishing himself. he yells out and thinks that it will be the end of his secrect but no one hears him. they just think he is the cry in the night. then reverend wilson comes along. but he doesnt see dimmesdale. then hester and pearl walk by they notice them. they come up on the scaffold. Pearl asked dimmesdale if he would stand with hester and her at noon the next day but of he says no that he will only stand with them on Judgement Day. then they see the scarlet letter in the sky and the town people thought that it was just an a for angel because the gov passed away. they next day wilson finds dimmesdale's glove on the scarrold but he thought that the devil put it there. i cant remember what chapter it is in but it is toward the middle good luck with the book i loved it
Q:Where to use scaffolding in construction
Construction height of 2m above to use scaffolding. Most of the site is the exterior, internal walls and paint.Scaffolding (scaffold) refers to the construction site for the workers to operate and solve the vertical and horizontal transport and erection of various stents. The general term of the construction industry, refers to the construction site used in the external walls, interior decoration or high level can not be directly construction. Mainly in order to work on or off the construction of the external security network and the installation of high altitude and other components, it is put on the shelf, scaffolding materials are usually made of bamboo, wood, steel or synthetic materials, etc.. Some projects also use scaffolding as a template, in addition to advertising, municipal, transportation, Luqiao, mining and other sectors are widely used.
Q:Mobile scaffolding accessories prices
! Mobile scaffolding is the main frame, cross frame, cross diagonal brace, foot board, adjustable base and other components
Q:How to calculate the vertical force of scaffolding
The calculation of steel tubular scaffold with reference to "construction safety code for steel tubular scaffold with couplers" (JGJ130-2001). Need to calculate the following eight aspects:
Q:The outer hanging scaffold board 12 embedded parts embedded in the crack?
Cantilevered scaffold generally has two kinds: one kind is each layer of a pick, the vertical rod at the bottom of the top in the construction site, floor beam or wall, outward tilt after fixed on the upper part of the erection of scaffolding construction, rail laying layer, construction of a story, to be transferred to the upper layer, and then re ride scaffold provides a layer of construction; the other is the multilayer cantilever scaffold, the full height is divided into several sections, each section of the erection of a height of not more than 20m, the use of cantilever beam or cantilever frame for scaffold based subsection overhanging scaffolding section, this method can use scaffolding over 50m the overhanging scaffolding facade to be set up scissors.
Q:Have you heard of meat on a scaffold?
Sounds weird. When eaten I wonder how this experiment would affect the human body. It just might turn normal people into Liberals. If that's the case then I don't want anything to do with it.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range