Professional ID 15 Scaffolding Accessories

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1000 pc
Supply Capability:
1000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1.Structure of ID 15 Scaffolding Description:

ID 15 Scaffolding is designed for supporting the formwork system in construction, Can be used to be tower, it is popular in UAE.

 

2.ID 15 Scaffolding advantages:

ID 15 Scaffolding adapts flexible to any wall geometry

Fast due to pre-assembled panels with built-in plywood

Strong with 80 kN fresh concrete pressure per m2 allowed

Economical due to longer service life and fewer parts

Hire option given in selected regions

Hot selling ID 15 Scaffolding with low price

 our scaffolding ID15 which is consists of base head,frame 133,frame 100,end frame,diagonal).

and it's compatible with  ID 15 perfectly.

 It's easy to erect and fit in your work compared with conventional method, saving you 20% working time .

ID 15 Scaffolding Quick Details

Place of Origin:  China (Mainland)

Brand Name: ID 15 Scaffolding

SCAFFOLDING: tower

 

Packaging & Delivery

Packaging Details:

iron packed

Delivery Detail:

upon receipt of 30% of deposite after confirmed the order

 

3.ID 15 Scaffolding Products pictures:

 Professional ID 15 Scaffolding Accessories

4.ID 15 Scaffolding  Specification:

 

Professional ID 15 Scaffolding Accessories

5.FAQ

  We have organized several common questions for our clients, may help you sincerely:

1How many Scaffolding your company have?

Here comes our 5 types of Scaffolding systems:

- Cup lock Scaffolding(C-Lock Scaffolding)

- Ring lock Scaffolding

-Kwistage Scaffolding

-H-frame Scaffolding

-ID15 Scaffolding Tower, this type Scaffolding is the most widely used in construction, such like bridge.

2How long can we receive the product after purchase?

Lead time is about 30days after getting the signed PI and deposit.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What are the components of a mobile scaffolding
The utility model relates to a standard steel pipe scaffold which is connected with the main structure of the wall and is connected with the main structure of the building.
Q:Have you heard of meat on a scaffold?
Depends on how much it costs to stimulate the growth.
Q:Division.. Scaffold method?!?
use a calculator you punk, nobody writes out division anymore, grab your ti-84 and type it out... there's your scaffold method jerk.
Q:What are the advantages and disadvantages of the fastener type steel pipe scaffold and bowl buckle steel tube scaffold
(5) safe and reliable: the joint design, taking into account the upper bowl buckle spiral friction and self gravity, so that the connector has a reliable self-locking capacity. The load acting on the cross bar is transferred to the vertical rod through the lower bowl buckle, and the lower bowl buckle has a strong shearing force (the maximum is 199KN). Even if the upper bowl buckle is not pressed, the joint of the cross bar is not caused by an accident. At the same time equipped with a safety net support, inter bar, foot board, block board, ladder. Pick up the beam, wall support and other rod accessories, the use of safe and reliable.
Q:Could someone please tell me a very simple scaffold on writing commentary?
A vegan alcoholic! A chuckle emerges, a laugh perhaps for a few more bobs. Absent the mind, nicely put.
Q:Should you twist and Industrial/Scaffold Piercing?
My piercer told me to move the bar up and down, not to twist it around. And now, it's a year and a few months later and I've never had any problems with mine. It healed perfectly.
Q:I would like to ask how much scaffolding steel prices
Scaffolding steel pipe1, set up a high-level scaffolding, the various materials used must meet the quality requirements.2, the foundation must be firm, before the erection of the calculation, to meet the load requirements, and according to the construction code set up, do drainage measures.3, scaffolding erection technical requirements shall comply with the relevant provisions of the code.4, we must attach great importance to a variety of structural measures: scissors, pull nodes, etc. should be set according to requirements.5, the level should be closed: the first step, every step or two, covered with planks or hand foot fence, scaffolding to laying along the long, joints should be overlapped in the small bar, do not appear short board. And in between in the pole and the wall every four steps long laying safety bottom fence.6, vertical closure: from the second step to the fifth step, each step required in the outer row of pole side door set like baluster 1.00m high and block feet or to set up protective net, rod (net) and the vertical rod fastened; more than fifth steps in a protective railing, should all the safety fence or security legislation net; in the street or densely populated areas, should be from the second step, the safety fence or outside of all network security legislation.
Q:what is common cause of formwork and scaffolding failure during construction?
Well, it seems you came close to answering your question. But are falls a scaffolding failure? For me failure means that the scaffolding sagged or fell - which may result in injuries with or without falling as when the failing scaffolding falls on a worker on the ground. I would think that major causes of failure as I defined it would be inadequate or failed attachments to the building and failure of ground support for the structure. Question needs to be improved to define what you need in answer and avoid conflict between question and detail.
Q:Targus or scaffold piercing?
If you want to be different AND have something that looks really cute, get a micro dermal. Either on your collar bone, or lower back dimples if you have cute ones! Good luck hun!
Q:Cantilever scaffold technical disclosure Find satisfaction free speed!!!
Fastener:(1) new fasteners shall have production licenses, product quality certificates and inspection reports. Old fasteners should be used before the quality inspection, there are cracks, deformation is strictly prohibited, the use of bolts must be replaced sliding silk. New and old fasteners should be anti rust treatment. Corrosion of fasteners and damaged fasteners timely repair replacement bolts. Bolt oil support easy to use.(2) the fastener and the joint surface of the steel pipe should be in good contact with the steel pipe, and the minimum distance of the opening should be less than 5mm. The fastener in the bolt was 65N.m, shall not be damaged.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range