Prestressed Concrete Purline Compression Molding Machine

Ref Price:
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
1 pc
Supply Capability:
5 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Prestressed Concrete Purline Compression Molding Machine


1.   Structure of Prestressed Concrete Purline Compression Molding Machine:


Prestressed Concrete Purline Compression Molding Machine is our special developed products as results of our engineers research, with which 60%steel material will be saved compared with traditional revolving die method .Efficiency can be improved 3 to 5 times compared with conical die method, these machine are easy for operation and convenient for maintenance, products from these machines are in good quality, smooth appearance and accurate in size.

 

 2.   Main Features of Prestressed Concrete Purline Compression Molding Machine: 


• One machine can make one slab lower cost, high Wear-resistant, long service life.

• In case of quality problem the company provide free replacement.

• Provide technical support for free.

• Provide consumers with regular visits

• Simple structure, easy operate, less wear parts

 

3.  Prestressed Concrete Purline Compression Molding Machine Images:

Prestressed Concrete Purline Compression Molding Machine

Prestressed Concrete Purline Compression Molding Machine

Prestressed Concrete Purline Compression Molding Machine

 

4.  Prestressed Concrete Purline Compression Molding Machine Specification:

 

Product name

Type

Productivity

Hole number

Concrete purline  machine

60*120*140*

1.3-1.5m/min

4

Concrete purline  machine

60*130*150*4

1.3-1.5m/min

4

Concrete purline  machine

60*140*160*4

1.3-1.5m/min

4

Concrete purline  machine

70*150*170*2

1.3-1.5m/min

2

Concrete purline  machine

80*160*180*2

1.3-1.5m/min

2

Concrete purline  machine

60*110*130*4

1.3-1.5m/min

4

 


Production Line Layout


Prestressed Concrete Purline Compression Molding Machine

 

Certificates


Prestressed Concrete Purline Compression Molding Machine


5. Packing & Delivery


•  Wire cables are used for fastening the machine on the trailer or inside the container.

•  Machine covered with plastic film.

•  Machines can be packed in tarpaulin or wooden case according to customer’s needs.


Prestressed Concrete Purline Compression Molding Machine


6. Customers from All Over The World

Prestressed Concrete Purline Compression Molding Machine


7. FAQ: 


We have organized several common questions for our clients, may help you sincerely:

•  What information we need to confirm with you before send a formal offer?

What kind of slab you want to make, wall panel, roof panel, lintel or something else?

Do you have exact slab size (slab thickness and width)? If not, please tell us the slab span, we will give you suggestion.

•  Have you use this kind of machine before? 

Our machine is totally different from European machine. Please don’t follow their instructions.

•  How long can we receive the product after purchase?

In the purchase of product, within 20 working days we will arrange the factory delivery as soon as possible. The specific time of receiving is related to the state and position of customers. Commonly 35 working days can be served.

 

8. Why choose us:


•  30 years manufacturing experience.

•  Constitutor of the.

•  More than 10 patents.

•  Passed ISO9001:2000 quality system certificate.

• More than 10 types of machine and over 100 models for choose.

Supply complete set of technology and equipment solution.

• We can design and manufacture all kinds of concrete forming equipment according to customers' demands. Meanwhile we can even more provide our customers a complete set of technology and solution for all producing flow.


9. Our Service:


•  We supply the technical supporting all the time.

•  We supply one year warranty for whole machine.

•  We supply free quick wear parts. 

•  We supply low charge continue maintenance when warranty is expired.

•  We supply free training to end-users

 

 


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:help me. i am lookin for condom machinery from china?
through the service you just like engage a agent in China to help you to find what you need in China.
Q:Foam production raw materials, machinery & catalogue?
Here's okorder.com/
Q:How to do succesfull heavy machinery sales?
try craigs list
Q:Payback: Quebec, Inc., is purchasing machinery at a cost of $3,768,966. The company expects, as a result, cash?
Plugging okorder.com/
Q:what rate of depreciation on new machineries purchase?
The maximum section 179 deduction you can elect for property you placed in service in 2006 is increased to $108,000 for quali­fied section 179 property. This limit is reduced by the amount by which the cost of section 179 property placed in service during the tax year exceeds $430,000. Assuming you bought this equipment and it was placed into service in 2006, you dont have to capitalize it and depreciate it. You can elect to expense the equipment up to $108,000. This limitation gets reduced dollar for dollar for the amount of equipment placed into service in 2006 that exceeds $430,000.
Q:What are some examples in modern machinery where something rotates to a limited and controlled degree?
The steering on your car.
Q:I dropped a robot part in my macoroni and cheese. Does this make it MAChinery?
hahahahahahaahhahahahahahhahahhahaah! ROFL! LMAO! LOL! Wait.. Where did you get the robot? o.O
Q:why on ship machinery's are installed forward-aft & not port starboard?
Depends on the designer... Machinery can be placed athwart-ship , fore and aft or a combination of the two if more than two pieces of the same type of equipment are installed. For athwart-ship placement at a given frame location, the numbering starts at the centerline and working outward even numbers go on the port and odd numbers on the starboard. For/Aft placement the numbering increases from bow to stern. Machinery is alway labeled starting at 1 even if it is located on the port side as would be the case of a single unit or the first forward most unit with additional units aft. Some factors that determine how and where machinery is placed include: size, weight, access for operation and repair, how critical the equipment is in relation to safe operation of the ship (number of backups or units to be run in parallel)
Q:Songs about machinery or has something to do with it?
Kyrie- Mr. Mister Bq: No. Bq2: And in its sky was such a sun as no opium eater could have imagined in his wildest dreams. Too hot to be white, it was a searing ghost at the frontiers of the ultraviolet. (Childhood's End-Arthur C. Clarke-Chapter 16-The Last Generation)
Q:Mechanical material forming cold forming and thermoforming What is the difference, the main processing of what materials
the role of environmental gravity without stretching without deformation.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range