Pressed Single Coupler Putlog Coupler for Scaffolding Q235 BS1139 Standard CNBM

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
5000 pc
Supply Capability:
30000000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

  • Quick Details of  Pressed Single Coupler Putlog Coupler  for Scaffolding

  • Material :SPHC

  • Production Standard :BS1139 EN74

  • Applications :Construction

  • Package :In bag and pallet

  • Pressed Single Coupler  Putlog Coupler for Scaffolding Q235 BS1139 Standard CNBM

  • Pressed Single Coupler  Putlog Coupler for Scaffolding Q235 BS1139 Standard CNBM

Futures of  Pressed Single Coupler Putlog  Coupler for Scaffolding

1.Material:Q235 carbon steel

2.Diameter:48.3mm x 48.3mm

3.Finish:Hot dip galvanized,Electro plated.Powder coated,Painted

4.Weight:1.00kg

5.Standard:EN74,BS1139

6.Supply ability:25 containers / month

7.Minimum order:One container

8.Payment:L/C,T/T,30% in advance

9.Shipment:FOB,CIF,C&F

10.Port:Nanjing/Shanghai port

11.Advantages: High quanlity,Competitive price,Fast delivery,Safe package ,Best service and OEM service



  • FAQ

  • 1. What is considerations of Scaffolding installation?

  • There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,

  • (1) scaffold frontage hurtful to prevent falling objects protection is required.

  • (2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator

  • 2.What are the certifications of your products?

  • Certified by SGS, BS1139, EN74, Local Test Report.

  • 3. How long is the warranty period for your product?

  • Our products warranty is 2 years.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What are the functions and requirements of the masonry wall
6, vertical closure: from the second step to the fifth step, each step required in the outer row of pole side door set like baluster 1.00m high and block feet or to set up protective net, rod (net) and the vertical rod fastened; more than fifth steps in a protective railing, should all the safety fence or security legislation net; in the street or densely populated areas, should be from the second step, the safety fence or outside of all network security legislation.7, scaffolding erection should be higher than the top of the building or the operating surface of 1.5m or more, and add enclosure.
Q:Cantilever scaffold technical disclosure
First, the foot of the structure of the quality standards:1, steel pipe:(1) the steel pipe shall have the product quality certificate and inspection report with the outer diameter of 48mm and the thickness of 3.5mm of the steel pipe welded to the steel pipe of 3. Rust must be replaced, not to be used to build the frame.
Q:How to do an industrial(Scaffold) piercing without a bend in the ear?
person above me obviously didnt read LOL. anyways as to your problem you might have to bend your ear a bit while you are piercing it but this mite cause the jewlry to pull forward, you could also go higher up, change the angles or you could do a vertical industrial which would look gud with ur other pericings
Q:Can you do the outer scaffolding?
The safety net is fixed on the side of the outer vertical rod of the scaffold. (2) the 16# wire safety net, strict and smooth. (3) the outer side of the scaffold shall be provided with a 1.2m high protective railing and a 30cm high skirting bar, and the top row protective railing shall be not less than 2, with a height of 0.6m and 1.2m.
Q:Scaffolding/industrial piercing?
I got my lobes pierced 5 years before my industrial so I can't compare the pain but everyone says industrial. Idk if they can freeze or not. The pain is completely tolerable.
Q:Painters on a scaffold physics help!!?
Total weight = 222 + 158 + 84 = 464 lb So, each support must carry 232 lbs Working in inches: Take moment about Right hand end Board is assumed to be uniform - CG is at the center (232 x 32) + (232 x 133) = (158 x 106) + ( 84 x 82.5 ) +(222 x d)7424 + 30856 = 16748 + 6930 + 222d 222d = 14602 d = 65.77 inches Distance of 222 lb painter should be 5ft 5.77inches from Right end
Q:is my scaffolding piercing infected/?
I've also had my scaffolding and I had the same issue. It was totally normal, I went back to the peircing place and asked if this was regular for the piercing. They said it was and to proceed with the cleaning process etc. they said it just has scabs because its healing :)
Q:29 meters outside the walls of the house of the two rows of steel pipe scaffolding installation, demolition
With regard to the design and construction of floor type (double pole type) single and double row steel pipe scaffold for industrial and civil construction, and the design and construction of formwork support in the construction of horizontal concrete structure. National compulsory technical norms, because of its complexity, and you proposed "one square meter standard steel scaffolding the number of meters" is a vague and unclear description of the problem, considering the matter of security,
Q:Specification and type of scaffold erection
2 fasteners should be qualified factory, where brittle crack, deformation, sliding wire shall not be used. 3 steel scaffolding should be 2 ~ 3mm thick No. 3 steel plate, with the length of 1.4 ~ 3.6m, 23 ~ 25cm, width of rib height should be 5cm, available on both ends of connecting device, surface with anti slip hole, where the crack distortion may not be used.
Q:How to maintain the scaffold after use
Tool type scaffolding (such as door frame, bridge frame, hanging basket, receiving table) in the removal of the need to stop the maintenance and timely maintenance, and supporting storage.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range