Pressed Right Angle Coupler British Type for Sale

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1000 kg
Supply Capability:
100000 kg/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Pressed Right Angle Coupler British Type for Sale


Description


1.The scaffolding coupler is always used to connect the steel pipe as scaffolding system.

2.The often used coupler is swivel coupler and righ angle coupler .

3.We can provide types of scaffolding coupler according to your requirement.

4.Couoler can fix the 48.3mm scaffolding steel pipe tightly and make the whole scaffolding system more steadily.

5.Material:Q235 steel

6.Overall Size:48.3mm*48.3mm

7.Surface Finish: Galvanized/ Painted

8.Standard:BS1139,EN74

9.Package:25pcs/bag

10.Manufactuering as per customer requirements

Pressed Right Angle Coupler British Type for Sale


Feature


(1)Excellent Anti-Breaking—Cold Pressed Steel

(2)Outstanding Resistance Deformation

(3)Strong Anti-Dropping Ability

(4)Longtime USe

(5)Qualtity Guaranteed

(6)OEM Service



Photo


Pressed Right Angle Coupler British Type for Sale

Pressed Right Angle Coupler British Type for Sale

Pressed Right Angle Coupler British Type for Sale

Parameter



MaterialQ235,345steel
Size48.3mm*48.3mm
Surface finishGalvanized
Weight1.1kg around
StandardBS1139,EN74
Package25pcs/bag,steel pallet
Manufacture
As per customer requirement
MarketAfrica, South America, the Middle East and Asia



FAQ


Q: Are you a factory or trading company?    

We are a state-owned corporation in China,dealing with various kinds of building materials.We have our holding subsidiaries.

Q: Where is your factory located? How can I visit there?    

Our factory is located all around China.

Q: Can I get some samples?    

Sample is free, customer only pay freight for the first time. 

Q: Delivery?

10-30days. (5-15 containers)



Any question,feel free to contact us.


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:(GJG130-2001), safety technical regulations for cantilevered scaffolding (DG / TJ08-016-2004) for the construction of fasteners,
Look at the thickness of the metal is about the commonly used on the 04 under the thickness of the price of 45 yuan per meter
Q:I plan to get scaffolding/industrial, but I need some advice?
You really shouldn't get the studs. The holes won't be properly aligned, and that will cause a lot of stress/trauma when you put in the bar. I would suggest just wearing your hair down from now on. Industrials are infamously finicky. I would wait a *least* a year and a half before taking it out for longer than a minute or two.
Q:Seeking the current building construction specifications Daquan electronic version of the hair 304978660@qq.com
Pay attention to check, remember to adopt a ,,,,,
Q:How can I find Scaffold Building jobs that are hiring for overseas jobs?
Your question is not clear. Can you provide more details?
Q:Scaffold Piercing .. help?
yep piercers can get those things on there crazy tight. thats what happened with my labret on my lip. i finally just got mini pliers and unscrewed it. but now i realized after my friend had the same problem, surgical latex gloves give a good grip. so those might work. or else go back to the piercing place. =]
Q:On the high-profile model erection of fastener-type steel pipe and door scaffolding mix, combined with work and professional knowledge, not less than 2000 words of the paper
"Construction of fastener type steel pipe scaffolding safety technical specifications" pole construction measures are: "construction of fastener steel scaffold safety technical specifications" JGJ130-. 3 pole 6.3.1 The base or pad should be set at the bottom of each pole. 6.3.2 Scaffolding must be set vertical and horizontal sweeping pole. Longitudinal sweeping pole should be fixed with fast nuts at the base of the base is not greater than 200mm on the pole. The horizontal sweep bar should be fastened to the pole on the underside of the longitudinal sweep bar. 6.3.3 scaffolding pole base is not at the same height, the height of the longitudinal sweep must be extended to the lower two spans and pole fixed, height difference should not be greater than 1m. The distance from the pole shaft above the slope to the slope should not be less than 500 mm (Figure 6.3.3). 6.3.4 single and double scaffolding bottom step should not be greater than 2m. 6.3.5 single row, double row and full house scaffolding pole in addition to the top of the top step, the rest of the layers of the joints must be used to connect the fastener connection. 6.3.6 Scaffolding pole docking, lap should meet the following requirements: 1 When the pole with docking long, the pole of the buttocks should be staggered layout, two adjacent rod joints should not be set in synchronization The distance between the joints of the joints to the main node should not be greater than the distance of 1/3; 2 when the pole with a lap to take a long time, the distance between the two joints should be less than 500mm; , Lap length should not be less than 1m, and should be used not less than 2 rotation and fasteners fixed. The distance from the edge to the end of the end fastener cover shall not be less than 100 mm. 6.3.7 scaffolding pole top railings should be higher than the top of the wall 1m, should be higher than the top of the cornice 1.5m.
Q:Now the domestic construction of scaffolding used more than what type ah? begging
Construction and quality acceptance of the provisions of the provisions of the construction unit inspection records open to move the importation of the state tax Bao Jing main control project 1 backfill material to meet the design requirements Section 4
Q:Is there any secondary construction division exams over the years? (Municipal) can pass a thank you
Fastener steel scaffolding 1) bearing capacity. When the scaffolding geometry and construction in line with the relevant requirements of the specification, under normal circumstances, scaffolding single tube column bearing capacity of up to 15kN ~ 35kN (1.5tf ~ 3.5tf, design). 2) easy assembly and disassembly, erection flexible. As the length of the pipe is easy to adjust, fastener connection is simple, and thus can be adapted to a variety of flat, facade buildings and structures with scaffolding. 3) more economical. Processing is simple, a low investment costs; if carefully designed scaffold geometry, pay attention to improve the use of steel pipe turnover, the amount of material can also achieve better economic results. Fastener steel pipe frame equivalent to about 15 kg per square meter of building steel.
Q:a 617 N window washer is standing on a scaffold supported by a vertical?
Set up a net moment equation. To find the tension in the rope on the right use the spot where the left rope connects to the scaffold as rotation point. Then it's just force times distance for the rope and the man and the net moment will be zero. For the the left end use the right side as your rotation point. Tr (x1) + Wm(x2) = 0 Tr = Tension in right rope x1 = length of board Wm = Weight of man x2 = man's distance from left rope.
Q:Industrial or scaffold piercing/eyebrow piercing/nose piercing/anti eyebrow?
industrial nose

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range