• PREFAB HOUSE LOW COST AND NICE DESIGN  007 System 1
  • PREFAB HOUSE LOW COST AND NICE DESIGN  007 System 2
  • PREFAB HOUSE LOW COST AND NICE DESIGN  007 System 3
  • PREFAB HOUSE LOW COST AND NICE DESIGN  007 System 4
  • PREFAB HOUSE LOW COST AND NICE DESIGN  007 System 5
PREFAB HOUSE LOW COST AND NICE DESIGN  007

PREFAB HOUSE LOW COST AND NICE DESIGN 007

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1000 m²
Supply Capability:
1000000 m²/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 

 1.     DESIGN DRAWINGS

 

The design drawing is the first step we should consider. If you have your own design, we will recheck it and start production based on it.

 

If you don’t have design plan, we can achieve it   for you. CNBM is one group, we can provide you not only production and material, but design and drawings. The designing charges will be confirmed according to your project details.

 

2.     What we need to do the design?

1.     Project Information, usage, construction area, height, how many storeys

2.      Weather report and geological for the location district

3.     Production process:

1.     Confirm design plan.

2.      Building the mould to confirm the design is correct.

3.     Mass production, packing and transportation.

4.     Installation

5.      After sale service.

 

4. Packing choice:

 

1. We can choose the steel structure to pack the products, its cost is a little higher, but the result is perfect, easy to transfer and load. This packing is designed for accurate production

 2.Bulk packing. This packing is designed for  heavy steel structure, such as beam, pillar, its advantage is cost less and easy to operate.

5. Shipment choice

1.     Container transportation. We can load the steel structure in the container directly. This choice is available for small project, the total weight of steel  is less than 3000 tons.

 

2. Bulk cargo ship

If the total weight of steel structure is more than 3000 tons, we can choose  bulk cargo shipment. This choice is cost less and save time.

6.     Installation choice:

 

 1.     We send our engineer to guide the  overseas installation . This is available for the small project. We will send 3 to 4 engineer to guide the local workers to achieve the installation. Its advantage is saving installation charges for customer.

2.     We send our engineers and construction workers together to operate installation. This is better choice for big project. Cost is a little higher, especially for the air tickets, accommodation. However, it will save the time for customers.

 

 

 

 

 

Q:What is the third-party warehouse function and responsibility?
Effective use of resources. The use of third-party warehouses is more effective than self-built warehouses to deal with the seasonal production of ubiquitous products in the light, season storage problems
Q:How to do warehouse management?
In order to make the work of the unit in an orderly manner, the warehouse work is very important
Q:How can I manage the warehouse better?
to keep the inventory of goods, so that the number of accurate, good quality, to ensure safety
Q:Recruitment of warehouse staff and warehouse manager of the quality requirements?
have a good professionalism, motivated, flexible response, work seriously responsible
Q:What do the warehouse keeper have to do and what should I pay attention to?
First, according to the provisions of materials and equipment out of the library acceptance, accounting and payment work, so that accounts match.
Q:What is the 5S in warehouse management?
5S management is finishing (SEIRI), rectification (SEITON), cleaning (SEISO), cleaning (SETKETSU), literacy (SHITSUKE) five projects
Q:How to do a good job Warehouse Invoicing?
Improve the warehouse management system to do a good job of warehouse management is very important to implement the warehouse management regulations for the basis of warehouse management work is very important.
Q:How to reduce warehouse costs?
Warehouse as a corporate material storage and turnover of the place, but also the equivalent of corporate funds precipitation area and the transfer area.
Q:What are the processes required for the company's warehouse management?
Inventory management, all the items in the warehouse should be classified storage, and to organize at any time to ensure that the physical inventory and the report match.
Q:What is the meaning of goods warehousing?
The traditional definition of warehousing is given from the perspective of material reserves

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches