Precision brass sand casting parts for building

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
10000 pc
Supply Capability:
10000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Quick Details

Surface treatment:

Hot galvanized, polishing, Zinc-plated, nickel-plated, chrome-plated

Usage:

Agricultural Machinery

Packing:

Wooden case

Technic:

Sand casting





Trade terms:

FOB, CIF, CFR, etc.





OEM service:

Yes

Sample service:

Yes

Delivery time:

Within 20 days

Packaging & Delivery

Packaging Detail:Precision brass building casting parts packing: wooden case or as per customers' requirement
Delivery Detail:7-20days or according to the quantity

Specifications

Brass sand casting parts for building 
1.Fully automatic production 
2.OEM/ODM service 
3.Fast delivery 
4.Good servic

Five fundamental principles

1.Provide customers with a quality product at competitive prices.

2.Support customer requirements on time - every time.

3.Grow the organization's capacity and capabilities to meet demand.

4.Expand operations wisely - in moderate, manageable increments.

5.Establish and maintain sound business practices and fiscal responsibility.

 

Range of products

 

 

1. Stamping/punching Parts & Pressing parts

2. Casting parts & Forging Parts.

3. Machining parts/CNC Machining.

4. Pipe fittings.

5. Furniture hardware. Door & window hardware & Construction hardware.

6. Fasteners and Springs.

7. Bearing

8. Metal products to buyer's requirement for any hardware or industrial use etc


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Can I get an industrial/scaffold piercing pierced with 2 separate bars?
Yep, some piercers prefer to do it that way. Just make sure you let them know that that's what you want when you go into the shop and they can accommodate you. No cartilage piercing is healed enough to remove in 6 weeks. Cartilage piercings can take anywhere from 6-12 MONTHS to fully heal.
Q:Want to rent the scaffolding in the county, you need to cast how much money
In addition, there are disc scaffolding and other accessories, so you can estimate how much you need to invest
Q:Sweeping rod, large cross bar, small cross bar, scissors brace, vertical pole, right angle fastener, rotating fastener, butt joint fastener, even wall piece! If there is a cantilever frame, the main beam, steel wire rope, such as pull down support
Steel tubular scaffold. As to the steel pipe, and combined with other type of steel pieces composed of scaffolding, such as the channel has a base in the backwater or scaffolding, connecting steel scaffolding and so on.
Q:Is it easier to build a disc scaffolding system than a bowl buckle scaffold?
It is widely used in bridge engineering, tunnel engineering, workshop, elevated water tower, power plant, oil refinery... Support design and special plant, is also applicable to overpass span scaffolding, storage shelves, chimney, water tower and indoor and outdoor decoration, large concert stage, the background frame, stands, balcony frame, stairs, other party system, stage setting, sports watch station project.
Q:Method for inspection of foot hand frame fittings
Or "low pressure fluid delivery welded steel pipe" GBT 3092
Q:Latch type disc scaffolding accessories is a national patent product
Disk lock scaffolding called socket type Pankou scaffold.
Q:Specific specification for erection of civil scaffold
Calculation basisScaffolding input: for the template support part of the steel pipe material in accordance with the 1.5 layer of the amount of consideration: the amount of external scaffolding steel pipe in accordance with the full closed scaffolding consideration; safety net in accordance with the external scaffolding full consideration.
Q:What are the requirements for the construction of the scaffolding structure?
The invention also provides an anchoring device for anchoring a scaffold structure to a building. Arm with longitudinal axis. The anchoring device further comprises an anchoring device which is fixed to the building by the anchoring device and the scaffold structure.
Q:Construction scaffolding fastener weight?
Weight: 48kg above 3, single piece weight in 20Kg or so, easy to carry and construction operation. 4, the installation and removal of only bare handed, greatly improved the efficiency of the door scaffolding installed than the fastener steel tube fast 1/2 time, faster than bamboo scaffolding 2/3 time. 2 the maximum weight of a single piece is not more than 20 kg, so lifting, assembling and disassembling and transportation are convenient
Q:What are the common rules for calculating the amount of scaffolding works
The independent brick (stone column) less than 3.60M in height, scaffold to construct the core column multiplied by the circumference of high calculation, the implementation of masonry scaffolding in the shelf; column 3.60M with column wise, the structure of the circumference of the core column height calculated by multiplying plus 3.60M, the implementation of masonry scaffolding outside the shelf (single row). Where masonry height exceeds 1.5m of the masonry are required to calculate the scaffolding.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range