Precast Concrete T Beam Production Line
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 pc
- Supply Capability:
- 5 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Precast Concrete T Beam Production Line
1. Structure of Precast Concrete T Beam Production Line:
Precast Concrete T Beam Production Line is our special developed products as results of our engineers research, with which 60%steel material will be saved compared with traditional revolving die method .Efficiency can be improved 3 to 5 times compared with conical die method, these machine are easy for operation and convenient for maintenance, products from these machines are in good quality, smooth appearance and accurate in size.
2. Main Features of Precast Concrete T Beam Production Line:
• One machine can make one slab lower cost, high Wear-resistant, long service life.
• In case of quality problem the company provide free replacement.
• Provide technical support for free.
• Simple structure, easy operate, less wear parts
3. Precast Concrete T Beam Production Line Images:
4. Precast Concrete T Beam Production Line Specification:
Model | Thickness of slab (mm) | Width Of slab(mm) | No of Holes | No of Wires | Diameter of wires (mm) | Eclectic Motor Power (kw) | Vibrator Motor Power (kw) | Max span(m) | Forming type |
ZB 100*130*4 | 100 | 130 | Solid | 5 | 5 | 7.5 | 1.5 | 4.5 | Flat pushing |
Type | Slab thickness | Slab width | Total power | Mould speed |
ZB100-130-4 | 100mm | 130mm | 9kw | 1.1-1.3m/min |
ZB110-130-4 | 110mm | 130mm | 9kw | 1.1-1.3m/min |
ZB140-155-4 | 140mm | 155mm | 9kw | 1.1-1.3m/min |
ZB150-140-4 | 150mm | 140mm | 9kw | 1.1-1.3m/min |
ZB150-160-4 | 150mm | 160mm | 9kw | 1.1-1.3m/min |
Production Process
Rebar tensioning
Raw materials preparing
Molding
5. Packing & Delivery
• Wire cables are used for fastening the machine on the trailer or inside the container.
• Machine covered with plastic film.
• Machines can be packed in tarpaulin or wooden case according to customer’s needs.
6. FAQ:
We have organized several common questions for our clients, may help you sincerely:
• What information we need to confirm with you before send a formal offer?
What kind of slab you want to make, wall panel, roof panel, lintel or something else?
Do you have exact slab size (slab thickness and width)? If not, please tell us the slab span, we will give you suggestion.
• Have you use this kind of machine before?
Our machine is totally different from European machine. Please don’t follow their instructions.
• How long can we receive the product after purchase?
In the purchase of product, within 20 working days we will arrange the factory delivery as soon as possible. The specific time of receiving is related to the state and position of customers. Commonly 35 working days can be served.
7. Our Service:
• We supply the technical supporting all the time.
• We supply one year warranty for whole machine.
• We supply free quick wear parts.
• We supply low charge continue maintenance when warranty is expired.
• We supply free training to end-users
- Q:Drink suppliers, machinery/drills, clothes, kitchen appliances, on websites. and places does any1 know any thanks.
- okorder has a lot of mostly mens clothing usually marked down pretty good. What kind of drink are you talking about?
- Q:Payback: Quebec, Inc., is purchasing machinery at a cost of $3,768,966. The company expects, as a result, cash flows of $979,225, $1,158,886, and $1,881,497 over the next three years. What is the payback period?
- Plugging okorder /
- Q:How come Chinese people make farming machinery whereas black African people do not and thus have famines?
- Farming machinery does exist in Africa, so that's a false statement that Africans do not build such machinery. However, if you’re wondering why China might have more farming machinery than Africa, one must take into consideration the states of China and much of Africa. China is less politically corrupt than much of Africa and tends to care more for its people, not to mention the higher education is great quality where they can learn all about machinery, and they have more than enough money to fund such material. Thus, the Chinese have better chances of learning to build such machines, which would likely see them producing more machines. Much of Africa, on the other hand, is plagued by government corruption, so many Africans cannot attend schools to build such complex machinery, nor do the average Africans have enough money to fund and build such projects. In addition, Africans barely attend school due to infrastructure problems and, if they do attend school, their education might have less quality than that in China. Thus, many of the poor parts of Africa would likely have less machinery build by Africans themselves. Nevertheless, higher income parts of Africa, with less corruption always undergoes development.
- Q:Libraries in Chicago withcollections of trade catalogs. Chicago Machinery Exchange 1900-30?
- The Newberry Library (it's in the Gold coast) has many old items. They are very knowledgeable about this type of thing, they might know where to find it if they don't have it.
- Q:when is world machinery day celebrated?
- what is world machinery day?
- Q:I bought an Oasis Machinery Dust Collector. Any free replacement bags?
- es okorder
- Q:what are the auxiliary machinery found in ships?
- Ships auxiliary machinery is EVERYTHING which is vital to the operation of the vessel apart from the main engines and in the case of steamers, the boilers. In addition to the boilers and propulsion machinery, the engine room also contains most of auxiliary machinery to run the rest of the ship's systems. Steam or diesel driven generators provide electricity for the ship's lights and motors. There are centrifugal separators for turbine gear oil on steam turbine propelled ship and for fuel oil on diesel ships. An electrical distribution panel to allow control of the ship's electrical systems. On diesel powered ships, there are air compressors and receivers for starting air for the main and auxiliary engines. Refrigerated ships have refrigerant compressors to maintain the temperature of the holds. There are also steam or electrically powered pumps for clearing the bilges, transferring ballast, pumping feed water, circulating cooling water, pumping cargo, etc. etc. etc. Outwith the engineroom there are winches and cranes for cargo handling, windlasses, mooring capstans and most importantly the steering gear.
- Q:Bq: have you read elfen liedBq2: favorite quote from a book
- Welcome okorder /
- Q:Hey, so I'm currently working on business coursework. We need to create a made up a business and i have chosen one of those businesses that print peoples picture on to items such a t-shirts, coasters mugs etc.. On one section i need to talk about the equipment and machinery i will need and to be honest i have no idea! could anybody give me a list of them?
- Well, it is possible you have chosen one of the most difficult businesses to theorize. Printing on t shirts can be done digitally, or using silk screens, or myriad other ways all of which have their benefits and drawbacks. Doing digital printing requires a machine that looks pretty much like a giant inkjet printer where the design is printed much like printing on paper with a few other details. I could go on and on but the homework is yours...
- Q:What are the effects of heat treatment on the mechanical properties of metallic materials
- Tempering: Reduce and eliminate the internal stress of steel after quenching. Stable organization and size.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Precast Concrete T Beam Production Line
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 pc
- Supply Capability:
- 5 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Hot Searches
Related keywords