Precast Concrete Accessories Lifting Anchor Capacity Loaded 0.5-12.5MT

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
100 pc
Supply Capability:
10000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1. Specification:
1) Material: St52.3 or stainless steel
2) Diameter: 12mm, 17mm, 20mm, 22mm
3) Length: 40-200mm
4) Capacity: 0.5-12.5MT
5) Surface: plain, zinc plating, HDG

2. Products available:
Swift lift lifting eyes are used with the swift lift anchors to lift, handle and place precast concrete elements

3. Primary competitive advantages:
1. More than 10 years 4 years focus on building material manufacturing
Prompt delivery lead time within 25 days after confirming order
2. Eathu's products are enhanced by the factory QA and quality control checks during the production, if necessary each order can be send out with a certificate referring back to test
3. OEM/ODM capability: more then 10 years experience


4.Packaging and delivery:
Packaging details: goods packed in cartons and then on the pallet
Delivery detail: within 25 days after getting payment


·         Experienced Staff

·         Form A

·         Guarantee/Warranty

·         Packaging

·         Price

·         Product Features

·         Product Performance

·         Prompt Delivery

·         Quality Approvals

·         Reputation

·         Service

·         Small Orders Accepted

·         More than 10 Years Experience

·         Testing before shipping

Market:

Asia

Australasia

Central/South America

Mid East/Africa

North America

Western Europe


FAQ:
 
Q1: How long about delivery time  Concrete Lifting  anchors  ?
A1: The delivery time will be very short, normally we keep the raw materials for old customers and sometime we 
also keep stock products to 

make sure delivery time in any emergency cases.

Q2: How do we guarantee the quality of our  Concrete lifting  anchors?
A2: We have established an advanced quality management system which conducts strict quality tests at every step, from raw materials to the final product. At the same time, we provide extensive follow-up service assurances as required.
Q3: How soon can we receive the product after purchase?
A3: Within three days of placing an order, we will book the vessel for goods. The specific shipping date is dependent upon international and government factors, but is typically 7 to 30 workdays.
 


Precast Concrete Accessories Lifting Anchor Capacity Loaded 0.5-12.5MT

Precast Concrete Accessories Lifting Anchor Capacity Loaded 0.5-12.5MT


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How can the concrete pump be installed and used?
Operation should be carried out before the examination, to confirm the normal electrical equipment and instrumentation, each part of the switch button, the handle in the correct position, the mechanical part of the fastening point is firm and reliable, and the chain belt tightness to meet the requirements, the normal operation of the transmission parts
Q:Is the main pump of the concrete pump electric control or hydraulic control?
Closed main oil pump behind the charge pump to provide a constant pressure to the displacement of the electromagnet by the current control output pressure to achieve the main pump pressure and pumping the commutation.
Q:How can the concrete pump pipe be cleaned?
The pipeline shall be provided with a stop valve, and the stop plate shall be inserted to prevent the vertical or upward tilting of the concrete in the pipe
Q:What are the layout requirements of concrete pump for building engineering?
When more than one concrete pump or pump truck is pouring at the same time, the selected location should be the closest to each other. It is better to pour the concrete at the same time, so as to avoid retaining the construction joint.
Q:How is the piping of the concrete pipe designed?
Concrete transmission pipe, according to the project and construction site characteristics, concrete pouring plan piping. Should shorten the length of the pipeline, less elbow and hose. The laying of the transmission pipe shall ensure safe construction, easy cleaning of the pipeline, troubleshooting and installation and maintenance
Q:In general, how much concrete will be transported per hour for the concrete pump and the pump?
Day pump, usually with concrete tank car, a jar of 9 cubic meters, unloading 7-10 minutes to completeDay pump, usually with concrete tank car, a jar of 9 cubic meters, unloading 7-10 minutes to complete
Q:When concrete is poured, how high can the concrete pump be put?
The car pump arm is long, traffic roads, the required pump stop position is bigger, so there are a lot of the site can not be use pump more than 60 meters (60 meters of general automobile pump, stop the pump and the leg position width of about 14 meters)
Q:What is the farthest pumping distance of concrete pump truck?
Now the domestic pump to achieve the highest pump height, the largest is ZOOMLION made 80 m carbon fiber boom pump, but also to achieve the pump Guinness world record
Q:If the concrete pump valve jam how to judge and deal with?
The method of hammering with a wooden hammer can be combined with a positive and reverse pump to make it clear; when the above method is invalid, the obstruction is serious
Q:What are the types of concrete pumps?
According to the structure and use of divided into drag type concrete pump, car pump and pump car

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range