PPR Pipe Plastic Pipe Fittings for Civil Construction Landscape Irrigation Drainage System PE Pipes

Ref Price:
$0.28 - 16.00 / pc
Loading Port:
Ningbo
Payment Terms:
TT or LC
Min Order Qty:
3000 pc
Supply Capability:
100000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

PPR Pipe Plastic Pipe Fittings

Mainly used to connect civil construction, industrial, agricultural and landscape irrigation drainage system PE pipes

 

Main Features of PPR Pipe Plastic Pipe Fittings

Mainly used to connect civil construction, industrial, agricultural and landscape irrigation drainage system PE pipes
1, Health, non-toxic: the various parts of the pipeline system consists of PP-R pipes and fittings constituted can be completely non-toxic, health indicators in line with GB / T17219 standards.
2, Does not rust: PH value can withstand a wide temperature range, in the range of 1 to 14, a high concentration of acid and alkali corrosion.
3, Wear-resistant, non-fouling: PP-R pipe and tube inner wall smooth, uniform flow resistance is small and does not scale.
4, Reducing vibration and noise: PP-R pipe has excellent insulation properties, can significantly reduce the vibration and noise caused by the flow of liquid.
5, Anti-cracking: PP-R materials excellent elasticity makes pipes and fittings sectionally With frost expansion of the liquid together without bursting.
6, Anti-condensation, heat loss is small: PP-R material is a poor thermal conductor, reduces condensation and reduce heat loss less.
7, Anti-electric corrosion: PP-R material is a poor conductor of electricity can avoid corrosion. Complete specifications: 10-30 optional    

 

Pictures of PPR Pipe Plastic Pipe Fittings

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What is the difference between a grooved pipe and a lining pipe?
A grooved pipe is a piece of pipe that is connected by a clamp, and refers to the way of connection.The lining pipe means that the pipe is lined with a layer of plastic.The groove pipe fittings can be lined with plastic pipe fittings, otherwise, the lining plastic pipe fittings can also be groove fittings.
Q:When calculating the installation of water supply and drainage pipelines, are elbow and pipe fittings calculated separately?
This is not necessarily, to see whether the water quota of pipe fittings, such as Fujian Province, the eighth volume of drainage pipe, plastic pipe and cast iron pipe fixed drainage pipe containing the pipe installation fee and material fee, and the rain cast iron pipe fittings with only the installation fee, material fee does not include fittings. So, when you calculate the amount of work, whether to count, according to your local quota of specific provisions, these in the quota description inside have description.
Q:How to set the quota for plastic pipe fittings?
Installation of plastic pipe installation, the plastic flange installation included in the quota items in the valve flange.
Q:How can the leakage between the solar heating pipe and the water tank joint be avoided?
If the pipe and pipe leakage between, then as long as the demolition, the thread of the side with the raw material tape around, about 20 laps or more can be, and then take back, screwed
Q:How can the PPR pipe be connected with the metal tubes?
The transition piece is a combination of plastic and metal, and the two materials are processed by injection molding process, and the anti leakage sealing is realized through the internal structure without adding other adhesive materials.
Q:ABS, rubber, resin, pipe made of three kinds of material. Which kind of hardness, electricity, heat insulation is good?. Can that material be used as tubing and heating fittings?
Rubber is divided into natural rubber and synthetic rubber according to its raw material. The yield of synthetic rubber has greatly exceeded that of natural rubber, of which the largest yield is styrene butadiene rubber. Rubber is the basic raw material of rubber industry. It is widely used in making tyres, rubber hoses, tapes, cables and other kinds of rubber products.
Q:What's the blind head in the pipe fittings?
It is "plug", it is a pipe sealed at the end of dongdong.
Q:About plastic drain pipe expansion joint?
Expansion joint, also known as telescopic joints. The long distance pipeline also has expansion and contraction when there is temperature change, in order to protect the pipeline, when the heat rises and contracts cold, the pipeline will not be damaged, and the case is guaranteed without leakageThe expansion and contraction of the pipeline play a regulating role in order to avoid the pipe being broken or cracked.
Q:Spiral drain pipe fittings are not special pipe fittings
1 vertical compression to the outer diameter of 40%, immediate unloading, the specimen does not rupture, not stratified.2, the temperature at 0 degrees, high 1M conditions, with a weight of 1Kg heavy hammer, impact 10 times, should be more than nine times without cracking.3. The inner wall is even and smooth. The water permeable holes are evenly distributed below 1/2 in the height of the trough. The number of holes at the height of the trough is not more than 10% of the total number of 1/2.4, water area is larger than 45cm2/M
Q:PE is the hot melt?
1. When using this method, the hot melt butt welding machine is adopted, and the main operation steps are as follows:After the butt welding machine has been debugged, put the pipe to be placed on the welding jig and clamp;The cleaning pipe end to be connected and connected with two end milling cutter alignment docking, the displacement is not greater than the pipe wall thickness of 10%:When the temperature of the heating plate reaches the set temperature, put it on the heating plate:After heating, take out the heating plate, quickly start the oil pump pressure, join the two pipe heating surface, and step up to the welding pressure, keep pressure and cool down:After cooling to the specified time, open the clamp and remove the pipe from the rack, observe the roll edge, determine the quality of the connection, and complete the connection.2. Check the quality of hot melt butt jointThe determination of the quality of hot melt butt welding is still mainly concerned with nondestructive appearance inspection of welding roll edges. Usually includes edge geometry and cutting edge visual inspection, the edge to behind the buckling to prove that connected with no lack of fusion check.Ultrasonic testing and X ray examination have been applied abroad.Destructive detection. Tensile test, bending test and tensile creep test are carried out at the interface respectively.3, hot melt docking notes:The procedures for the use of the docking machines and the matters needing attention shall be observed;Operators must wear gloves, wear overalls, do a good job of self-protection, to avoid electric shocks or burns;Heating the surface of the board, and the connecting ends should be kept clean:Docking pressure should be adjusted to the actual needs of the site:Polyethylene pipes shall not be heated by open flame;The welding interface to protect from sand and rain hit.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range