PP -R Double union ball cock with SPT Brand

Ref Price:
Loading Port:
Ningbo
Payment Terms:
TT OR LC
Min Order Qty:
1000 pc
Supply Capability:
100000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Item specifice:

Brand: SPT Standard: ISO9001 Color: White&Green&Grey

Product Description:

Picture:


PP -R  Double  union   ball cock with SPT Brand

PP -R  Double  union   ball cock with SPT Brand

Product Applications:

Distribution for cool and hot water
Duct for drinkable water system
Pipes for kinds of high-temperature and low-temperature heating system
Pipes for heating and coolling settings in solar energy system
Connecting pipe for air conditioners

 

Product Advantages:

1) Healthy, bacteriological neutral, conforming to drinking water standards
2) Resistant to high temperatures, good impact strength

3) Convenient and reliable installation, low construction expenses
4) Excellent heat-insulation property from minimum thermal conductivity
5) Lightweight, convenient to transport and handle, good for labor-saving.
6) Smooth inner walls reduce pressure loss and increase flow speed
7) Sound insulation (reduced by 40% compared to galvanized steel pipes)
8) Light colors and excellent design ensure suitability for both exposed and hidden installation
9) Recyclable, environment-friendly, accords with GBM standards

 

FAQ:

Q1:How Can I Get A Sample?

A1:You can get samples by communicate with our export sales.

Q2:How Long Is Delivery?

A2:Delivery time will be30-45days according to order quantity.

Q3:What Is The MOQ?

A3:MOQ depends on different items.

Q4:What Is Our Normal Payments Terms?

A4:Our normal payment terms now is: T/T, L/C or western union,paypal


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Plastic Yong connector temperature is too high, how to do? Can reflect the sound quality of PPR tube?
Both ends of each tube should check whether the damage before the construction, in order to prevent the transportation process of the pipe damage, such as damage or uncertainty, pipe installation, port should be reduced by 4-5cm, is not available or the heavy hammer struck the water, to prevent pipe explosion, improve the service life of relative
Q:What quota should plastic tube be fitted?
In the pipeline installation, the plastic flange sleeve quota can be carried out according to the following conditions: installation engineering, plastic pipe installation, plastic flange installation, included in the flange valve
Q:What kinds of PE pipe joint
A medium density polyethylene pipe and PE pipe with high density polyethylene pipe. Divided into SDR11 and SDR17.6 series according to the wall thickness. The former is suitable for transporting gaseous artificial gas, natural gas and liquefied petroleum gas. The latter is mainly used to transport natural gas. Compared with the steel pipe, the construction process is simple, flexible, and more importantly, no corrosion treatment, it will save a great deal of work. Shortcomings as equipment pipe, heating special attention to safety distance in construction, and can not be exposed in the air under the sun, and sensitive to chemicals, to prevent leakage of sewage pipe damage.
Q:How to connect the wire mesh, steel tape and plastic composite pipe?
Welding connection fittings using internal heating pipe fittings with inner plastic outer plastic melt, the pipes and fittings reliably connected together, but in order to ensure the whole pipeline system and under the same pressure, electric melting pipe is usually adopted in the production of Steel Lining Reinforced way.
Q:Can steel wire frame plastic composite pipe be connected with normal elbow?
The wire mesh frame and the plastic composite pipe are usually connected by an electric melting sleeve, and also can be used for the electric melting flange support between the tubes, and then the mechanical connection between the flanges is performed.
Q:How to choose PPR pipe and pipe fittings?
Two. Smell: smell PPR pipe material polypropylene pipe not bad smell can smell. Three non doped polyethylene polypropylene PPR pipe with hardness: pinch casually pinch tube deformation sure PPR tube 5. burning: burning directly mixed impurities in the raw material receiving plastic pipe PPR pipe smoke smell burning only material; black smoke, smell burning molten liquid in five clean pipe PPR pipe: pros and cons of competition as a cost-effective and environmentally friendly new plumbing materials with unique advantages of PPR tube is used as cooling water pipe as a heat pipe PPR pipe interface between the fusion tube through the pressure test once installed as deposit of aluminum pipe between the advantages of Water Leakage phenomenon hot melt technology: moderate price, stable performance, heat insulation, corrosion resistance, smooth inner wall of pipeline system, safety and use by penetration limit up to 50 disadvantages: the construction of technical requirements for the special work Professional construction can ensure system safety
Q:Why does methanol corrode plastic pipes?
Plastic containers are not recommended for storage of methanol, because long-term use can cause deterioration of plastic containers and may lead to methanol contamination.
Q:PSP plastic steel composite pressure pipe has several ways of connecting
(3) it can be installed without any anti-corrosion treatment, thus saving the project cost.(4) the complete steel pipe layer is the main pressure bearing layer of the pipe body, so the bearing capacity of the pipe is not affected by the change of the plastic layer.(5) it has excellent sealing performance, anti stripping, easy to install, and also has the adaptive ability of various deformation of pipes and pipelines.
Q:What are the common connecting methods for plastic PP pipes?
Because the hot melt connection method does not need any additional material, and can melt the connection part as a whole, achieves the body strength, the connection effect is good, therefore, here recommends the use of hot melt connection method. The use of hot-melt bonding method should pay attention to the following: first, the hot melt tool to connect the power supply, to the working temperature, the indicator light before the start of operation; II. Cutting the pipe material, you must make the surface perpendicular to the pipe axis. The general use of pipe cutting scissors or pipe cutting machine, using sharp hacksaw when necessary, but after cutting the pipe section should remove burrs; the PP pipe and pipe connection end must be clean, dry and free of grease; the welding elbow or three pass, according to the requirements of design drawings, we should pay attention to its direction in a straight direction pipe and tube, mark the location with the auxiliary mark the connection, no rotation; the end of the guide tube heating sleeve is inserted into the standard depth, at the same time, no rotating the pipe onto the heating head and reached the prescribed mark; the heating time is reached after, immediately put the pipe and pipe fittings from the heating sleeve and the heating head removed simultaneously, quickly and without rotation inserted into the standard depth, making joints form a uniform flange of the joint can be corrected, but not the rotation; to a prescribed cooling time, will The pipe cover is buckled on the pipe fittings.
Q:Can a plastic pipe be evacuated into two vacuum?
Vacuum, of course, but does not guarantee how long the vacuum can be maintained.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range