Powder Coated Manson Frame Scaffolding for Constrcution
- Ref Price:
- $40.00 / set
- Loading Port:
- Qingdao
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1000 set
- Supply Capability:
- 2000000 set/month
- OKorder Service Pledge
- Quality Product
- Order Online Tracking
- Timely Delivery
- OKorder Financial Service
- Credit Rating
- Credit Services
- Credit Purchasing
Product Description:
1. Powder Coated Manson Frame Scaffolding for Constrcution
What is Frame Scaffolding for Constrcution ?
A complete set of scaffold include two pieces of scaffolding frame, two pairs of cross braces, one piece of walking board ,four pieces of scaffolding wheel and several locking pins . It is made of Q235 steel and usually sureface be powder coated or as customer demands . Powder Coated Manson Frame Scaffolding for Constrcution becomes more popular .
Function of the Frame Scaffolding for Constrcution
Frame Scaffolding is easily set up, A complete set of scaffold include two pieces of scaffolding frame, two pairs of cross braces, one piece of walking board ,four pieces of scaffolding wheel and several locking pins. It can used to bulid tall tower for construction as tall as you need it to be .It is also easily disassembly It can be move to any place matched wirh caster wheel
Advantage of Frame Scaffolding for Constrcution
Strong ability of resistance to deformation, for different manufacturing process, It can resistant deformation, ensure the product safety and effective use of repeated; Strong anti-sliding performance, joint area is large, fasteners and overcomes the cast iron steel tube a point or line defect of joint, remove of steel pipe slip hazard.
2.Main Features of Powder Coated Manson Frame Scaffolding for Constrcution
Reliable performance
Corrosion resistance
Durable finish standards
Strong anti-sliding performance
Manugacture
Good service
3. Powder Coated Manson Frame Scaffolding for Constrcution images
4. Powder Coated Manson Frame Scaffolding for Constrcution Specification
Raw Material: Q235
Size: 5'*6‘4“or customer demanded
Certifies:, Element
Technology : Forging / welding
Surface treatment: Electro galvanized, Hot DIP galvanized, or painted
Brand Name:FF
Useage: connecting the scaffolding pipe
OEM service offered
5.FAQ of Powder Coated Manson Frame Scaffolding for Constrcution
Why you choose us ?
1)Highest quality -never use any equipment that is damaged or deteriorated in any way
2)Safety -inspect all equipment before using
3)Competitive price - factory suppler direct
4)We have strong engineering team that can give best solution for your project
5)Cutting -Edge product development
Consult your scaffolding supplier when in doubt-scaffolding is his business .Never take chances
Our firm belief that our customer's success are the only guarantee of our success .
Package ?
All the products package are suit for the sea transportation, steel and wooden plate is usual, if you need special package, Pls contact me for detail, we will meet your demands.
Delivery Time ?
For one 20GP container, the delivery time is about 15-25 days,
For 1-5 20GP containers, the delivery time is about 15-50 days.
For more than 5 containers, pls contact me ,our engineer will give you a delivery plan.
Product Quality
1) we can send you the samples for your checking our quality.
2) If you have time ,we welcome your coming to visit our factory.
- Q:According to the standard set up double scaffolding scaffolding to the number of meters per square meter
- Once the calculation is qualified, you can according to the vertical distance
- Q:Right! I've heard from so many different people about this. Some say that you should never twist an industrial because it can damage the delicate newly healing skin cells. Others say that you must twist it to prevent the jewelry from healing attached to the skin and to be able to clean it properly.There really doesn't seem to be a definitive answer!My piercer has said not to twist it, so I haven't been, and I'm happy that the piercing is clean enough, etc. However I'm interested in whether any of you out there have found that not twisting it can damage it more than doing so.Thanks
- My piercer told me to move the bar up and down, not to twist it around. And now, it's a year and a few months later and I've never had any problems with mine. It healed perfectly.
- Q:How many time was Hester Prynne on the scaffold? why was she on it each time? What about the time when pearl and dimmesdale was on it with her? HELP!!!
- She was only on it once officially but there are several appearances in the book.
- Q:Scaffolding installation and precautions?
- The backing plate and the base should be placed on the positioning line accurately.2, when the erection of the column, the outer diameter of the steel pipe is strictly prohibited, the adjacent column of the docking fasteners shall not be in the same height, staggered distance should meet the structural requirements.
- Q:What are the components of a mobile scaffolding
- The utility model relates to a standard steel pipe scaffold which is connected with the main structure of the wall and is connected with the main structure of the building.
- Q:Room 29 meters outside the wall of the two rows of steel pipe scaffolding installation, demolition, joint protection measures in Wuhan, the price per square is how much money? A friend to help refer to Kazakhstan
- Homework is two, while the long rod is 273m; small bar is 51; rectangular fastener 187; butt fastener 55; rotating fastener 17; a 7 foot board 14 square meters. You can use this to derive the amount per square meter. (average length of 5 meters).
- Q:i am getting my industrial (scaffold) pierced on one ear and i want my cartilage on the other ear, how long do i have to wait between them? What are pros and cons for industrial (scaffold)? what are risks and stuff and how much is it? i want to get it so any information or anything i should know would be great thanks especially for industrial:)
- i heard from people after a year an industrial still hurts and they usually have to take them out
- Q:What are the main safety problems when dismantling the scaffold
- 5, all construction materials must be set according to the material classification management requirements must be neatly stacked, "work finished, as material, the site is clean before work".6, on-site construction waste in a timely manner to clean up and deal with the designated place.7, scaffolding workers must be trained and qualified, safety examination, hold certificate to posts jiazigong.
- Q:Specific requirements, the civil code is what ah! Thank you very much, I am lack of this kind of information, I hope you can tell me which of the following
- 5.2.5 scaffold EngineeringA. accessories(1) selection and calculation basis of structural parts1) selectionThe project uses 48 mm, 3.5mm wall thickness steel pipe and the corresponding fasteners, dense mesh safety net, big eyes, etc.. Among them, the specification of the steel pipe is from 0.5m to 6m, and the fastener mainly has a rotating shaft, a cross and a joint fastener. Bowl buckle scaffold also uses Phi 48, 3.5 wall thickness of steel pipe and the corresponding fasteners, mainly with 1 x 1.0m, 1.2 x 1.2m, 1.5 x 1.5m and other specifications. Foot board mainly 2M and 3M two.
- Q:The construction scheme of high rise and external cantilever scaffold!
- Quality standard for 3 foot hand frame fittings(1) steel pipe: steel pipe is generally used outside the 48mm, the wall thickness of 3.5mm steel welded pipe No. 3,The chemical composition and mechanical properties can meet the national standard "carbon structural steel" (GB / T700). The vertical rod, longitudinal rod (rod) tube length is 4~6m, horizontal bar (small bar) is generally 1.2.3m. steel pipe should be coated with anti rust paint.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Similar products
New products
Hot products
You Might Also Like