Polyethylene Composit Dimple Geomembrane for Landfill to Prevent the Waste Water

Ref Price:
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
5000 m²
Supply Capability:
500000 m²/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

 

Polyethylene Composit Dimple Geomembrane for Landfill Images

 

Waterproof Polyethylene Geomembrane with Colorful for Pond 

Waterproof Polyethylene Geomembrane with Colorful for Pond

 

Waterproof Polyethylene Geomembrane with Colorful for Pond

Waterproof Polyethylene Geomembrane with Colorful for Pond

Polyethylene Composit Dimple Geomembrane Specification :

 

Thickness

Width

Length

Remark

0.5mm

5.8m ( Standard )

50m - 400m

The standard width is based on the max loading 

quantity according to the container size . 

Its will be loading more quantity to save Freight cost . 

 

 

 

For other types also could be produce as request , 

the exact package will send to you driectly . 

7.0m

50m - 400m

7.5m

50m - 400m

8.0m

50m - 400m

1.0mm

5.8m ( Standard )

50m / 100m / 150m

7.0m

50m / 100m / 150m

7.5m

50m / 100m / 150m

8.0m

50m / 100m / 150m

1.5mm

5.8m ( Standard )

50m / 100m / 140m

7.0m

50m / 100m/ 140m

7.5m

50m / 100m/ 140m

8.0m

50m / 100m/ 140m

2.0mm

5.8m ( Standard )

50m / 100m

7.0m

50m / 100m

7.5n

50m / 100m

8.0m

50m / 100m





FAQ:
 

1. How about the delivery time?    

    Two weeks upon receipt of down payment. 

2. What kind of payments do we accepted?   

   T/T, L/C, WesternUnion, MoneyGram. 

3. What's are the MOQ?   

    Normally the MOQ is 5000 SQM in theory. 

    And we can provide you free samples for quality inspection.  

4. Do you charge for the samples?   

    Accordeing to our company policy, the samples are freee, we only charge the freight fee. And we will return the freight fee in your second order.   

5. Can you produce the product according to customers' requirements?

     Sure, we are professional manufacturer, OEM and ODM are both welcome

 

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What if there is water during construction of geomembrane?
The main role of geomembrane on the road is water insulation, the part higher than the underground water level is isolated by geomembrane, and then backfill and grind, preventing the water through soil capillarity from soaking roadbed filler.
Q:What is electrothermal transparent film?
Electrothermal film heating system is different from dot mode heating system such as radiator, air-conditioning and heating radiator, from the streamlined heating system such as heating cable and from the face heating system such as LC supply heating high-tech products made by aerospace flight technology. It takes electrothermal film as heating element to transfer heat into the air by radiation. Human body and objects can be warmed first. It is better in resultant effect compared with traditional convection heating method. Low temperature radiation electrothermal film heating system is composed of power supply, temperature controller, adapting piece, insulating layer, electrothermal film and finish coat. Electric energy can be converted to heat energy by electrothermal film.
Q:Geomembrane snz/ pvc-12-400-0.35 model
(there is no manufacturer can produce 12m wide geomembrane at present) if it is SN/PVC-1, using 400g/ ㎡ polyester staple fiber geotextile and 0.35,another possibility is that your product model is wrong At the same time, according to national standard GB/T17642-2008. Combine 35mm thick PVC geomembrane together, using 400g/㎡ polyester staple fiber geotextile and 0. If this is geotechnical material used for seepage-proofing in the projects,
Q:Geomembrane is used for anti-seepage system which layer structure? What are the materials for the anti-seepage system?
What is your project, ah, contact me in detail to explain to you. Q sent to you
Q:Can plastic wrap be steamed?
No, the plastic wrap can't be steamed for it is a kind of plastic package product. It usually uses ethylene as master batch and is made by polymerization reaction. The plastic wrap is mainly used for food heating in microwave, refrigerator food preservation, and fresh food and cooked food packaging. It is also widely used in the field of food packaging in family life, supermarket stores, hotels, restaurants and industrial production. Plastic wrap can be classified into many types according to the material it uses and the added plasticizer, and it can be applied to different occasions. Plastic wrap is favored by people for its convenience, economy and beauty. However, plastic wrap generally contains added plasticizers in the production process, and thus its impact on human health has also been a concern.
Q:Does the lower geotextile of composite geomembrane need seaming?
In general, it does not need to seam (extending and folding together is ok). You only need to weld the geomembrane and seam the upper geotextile with handheld sewing machine. Geotextile is used as a protective layer of geomembrane to protect the impervious layer from being damaged. In order to reduce the ultraviolet radiation and increase the anti aging performance, you'd better use buried laying method. During construction, first, level cardinal plane with small sand or clay, then pave. Do not stretch too tight when paving. Both ends buried in soil is corrugated. Finally, pave a transition layer of about 10cm with fine sand or clay on two cloths and one membrane and build scour prevention layer with 20-30cm stone (or precast concrete block). In construction, you'd better build the packaging layer while paving membrane edge to try to avoid the stones hit directly on it. The connection between two cloths and one membrane and surrounding structures should be anchored by expansion bolt and steel plate depression bar, painted with emulsified asphalt (2mm thick) to stick and prevent leakage. Construction joint treatment is a key process, which directly affects the anti-seepage effect. General joint methods are: ① lap: lap width should be larger than 15cm; ② hot welding: suitable for thicker geomembrane substrates, and lap width of weld should be not less than 5cm.
Q:What is the hardness of HDPE board? What kind of knife is used to cut?
DPE board (high density polyethylene sheet) melting point is about 130 ℃. It has good mechanical strength. It has good heat resistance and cold resistance, good environmental stress crack resistance. It is advised that the range of melting temperature is 200-250℃. The melting temperature is 220℃-260℃. The relative density is 0. For materials with larger molecules, 941-0, it has higher rigidity and toughness and good chemical stability. It can use carbide cutter tool or diamond cutter to cut. Dielectric properties. Hardness is about 30-45HRC.
Q:How much does the electrothermal film floor heating cost?
Electrothermal membrane floor heating is calculated by 120 watts / square meter and 8 hours a day, the electricity of a day is around 1kwh. In fact, it will be more energy-efficient in the actual use, as long as it achieves the state regulations of energy efficiency standards, indoor insulation effect will be better, the power consumption will be greatly reduced. Secondly, it can also achieve energy-saving behavior in the use of the process, such as travel time is more than three days, the electric floor heating system can remain in the state of low temperature operation, and also can used in the rooms where no people live in it, electricity consumption will be greatly reduced. Another electrical floor heating can make full use of peak valley electricity policy, peak valley electricity of the city is respectively: Peak power 8: 00-21: 00, the price is 0.5583 yuan / kwh; valley power is 21: 00-8: 00, electricity price is 0.3583 yuan / kwh we can adjust peak power higher at night in the use of electric floor heating, it can be 18 kwh, and we can adjust the temperature lower during the day, it can be 10 to 12 kwh. The concrete can be fully utilized at night time to heat storage, and be released the heat during the day. The laying of electric heating film needs a very good design, it should meet the requirements of users on the temperature in accordance with the different requirements of the use of space to lay the corresponding power of the electric heating film.
Q:How to disassemble piamater ceiling?
You are ecommended to ask the professional staff to remove the work, or consult professional's advice on how to remove before you begin to remove the demolition.
Q:What is the code for check and acceptance of reinforced concrete project ?
Article 2.1.1 Materials of the template and holder shall be steel, wood or new materials. The steel should be consistent with the No. 3 steel standard in the "Ordinary carbon steel grades and general technical conditions" (GB700-79). The timber should be consistent with the selection criterion of bearing structures under Code for construction quality acceptance of timber (GBJ206-83) , the tree species can be selected according to regional conditions, and the material grade shall not be under Ⅲ grade. Article 2.1.2 The template and holder must be in accordance with the following provisions: First,ensure the shape, size and position of engineering structures and components in each part is correct. Second, have enough strength, rigidity and stability, to withstand the weight and lateral pressure of newly poured concrete, as well as load generated in the process of construction.Third, simple structure, convenient assembly and disassembly, convenient for reinforcing bar colligation and installation and concrete pouring and curing process. Fourth, tight template joints without spillage. Article 2.1.3 The design, fabrication and construction of composite steel template, large formwork, climbing form and so on shall be in conformity with the relevant professional standards. Article 2.1.4 The contact surface of template and concrete shall be coated with separant. Do not use separant which will hinder the construction of decoration project. Article 2.1.5 The templates and holders shall be properly maintained, and the steel formwork and steel supports shall be prevented from corrosion.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range