Plisse Insect Window and Door System Manufactory

Ref Price:
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
5000 set
Supply Capability:
100000 set/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Introductionof Plisse Insect Window and Door System

The latest in European styling, the ScreenSolutions Plisse is the newest and most innovative retractable screen designavailable. So simple to install that almost anyone can do it in as little ashalf an hour.
This elegant, stylish, pleated screen is unlikeany other screen on the market. This unique product has low-profile bottomglide is making it ideal for any locations. You can leave the screen in anyposition without any spring action and will stay in that position till you moveit.

Avaiable Size for Plisse Insect Window and Door System

Single door width: 800-1500mm Height: 1900-3000mm
Double Door width: 1600-3000mm Height: 1900-3000mm
Other special size could be also available

Advantagefor Plisse Insect Window and Door System

▪The mesh cassettecould be removable then easy to clean and when damage the mesh, each to changethe new mesh.

▪(6063-T5) aluminum alloy outline border. Hardness ≥12.

▪Environmental no-lead process surface, thickness ≥1.0.

▪Anti-friction, spring folding net, PET and terylene are optional.

▪Anti-friction and anti-striction draw cord, with special process.

▪Advanced adhesion machine, first-class adhesion technique.

▪Super anti-friction rivet, can stand up to 100,000 times friction.

▪Super amphiphobic process makes a complementary (e.g bulge and concave) structure.

▪Super loeophobic performance after super amphiphobic process

▪Super dewatering performance after super amphiphobic process

Pleated Screen Window System


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Metal doors and windows do not include steel doors and windows
Should not, metal doors and windows are not included steel doors and windows.
Q:Metal doors and windows generally taxpayers can declare a simple levy?
Metal doors and windows general taxpayers, can not choose a simple collection method to calculate the value-added tax.
Q:How to learn metal doors and windows by looking at the map
Learn the basic knowledge can be, you can also look at the side, while the control in kind
Q:Metal screens can be used how to stick ah.
1. Use dry cloth or sandpaper will be followed by the surface of the dust, oil, rust, etc. to remove, and then acetone or trichlorethylene and other cleaning agents to clean the surface to clean. (A: B = 2: 1); in order to ensure the use of the effect, but also pumping a vacuum and then use the same, in order to ensure the use of the effect, The 3. Note that the use of time must be used within the run out, or will be solidified, resulting in waste of material, 24 hours after the maximum strength. 4. After coating at room temperature 2 to 6 hours curing 40 degrees to 50 degrees 1 to 3 hours curing; glue 24 hours after use; ten days after the sticky better. Cold and wet days, need 15 to 25 degrees room temperature bonding as well. 5. Adhesive face. After pouring the surface. After the glue must be sticky paper stickers. Or 502 glue positioning. Epoxy Resin Adhesive Epoxy Resin AB is made of epoxy resin based two-component high temperature adhesive, mainly for high temperature metal, ceramic and other adhesive. The use of temperature operating temperature of -50 ~ + 180 ℃, short-term up to +250 ℃.
Q:High-rise commercial housing metal doors and windows how to leave the ground? And can not be steel out of the wall paint what are the brush. Most of the balcony of the metal railings are not received
Metal doors and windows are connected with the pressure ring is cast in the shear wall before the embedded and done. Rework now is not an ordinary loss.
Q:Metal doors and windows project what acceptance criteria
Metal door frame installation must be strong, the number of embedded parts, location, buried connection method and anti-corrosion must meet the design requirements. Aluminum alloy doors and windows and non-stainless steel fasteners should be done between the anti-corrosion treatment. Soundproof door seal installation position is correct, fan frame closed tight. Inspection method: observation, inspection of hidden engineering records.
Q:Plastic windows are metal doors and windows or plastic doors and windows
Plastic window features: It not only has the characteristics of plastic products, and physical, chemical properties, anti-aging ability greatly improved. With insulation, heat insulation characteristics, so that the room more comfortable, quiet, more modern style. In addition, it has the advantages of acid resistance, alkali resistance, corrosion resistance, dustproof, self-extinguishing, high strength, inconvenience, hue and so on. It is not necessary to paint anti-corrosive paint, and its air tightness and watertightness are similar Big 2 - 5 times
Q:Metal doors and windows qualification
Contracted Project Scope: First-class enterprises: can undertake all kinds of aluminum, steel and other metal doors and windows construction of the project. Second-level enterprises: can bear the amount of individual contract does not exceed 5 times the registered capital of the following aluminum alloy, steel and other metal doors and windows construction of the project: 1,30 layers and the following buildings of the metal doors and windows works; 2, an area of 8000 square meters and below the metal doors and windows works. Three enterprises: the amount of individual contract can not bear more than 5 times the registered capital of the following aluminum alloy, steel and other metal doors and windows construction of the project: 1,10 layers and below the building of the metal doors and windows works; 2, an area of 4000 square meters and below the metal doors and windows works.
Q:How to handle the installation of metal doors and windows
According to the construction of the city [2015] 20 document, "construction enterprises qualification management requirements and qualification standards for the implementation of opinions" in the original "construction enterprise qualification level" (construction [2001] 82, hereinafter referred to as the original standard) It is a professional contractor qualification, such as earthwork, concrete prefabricated components, elevator installation, metal doors and windows, prestressing, non-destructive testing, sports facilities and other facilities, in the corresponding professional project contracting process, no longer qualified. Construction of general contracting enterprises to carry out professional project subcontracting, the professional project should be subcontracted to a certain technical strength and management capabilities and access to corporate legal person "business license" of the enterprise. The demolition operation shall be borne by the enterprise with the corresponding qualification category according to the nature of the project. On the issue of building quality you can go to the qualified world network to understand
Q:What is the amount of metal blinds?
Use the manual knob or putter motor to drive the internal connecting rod movement to achieve the aluminum alloy louver blade flip function, the blade has 0 to 105 degrees of flip angle, can be adjusted, when the blade angle of 90 degrees, the maximum ventilation effect, When the blade angle of 15 to 25 degrees, can effectively prevent the outdoor peep, when the leaves are completely closed, can block the invasion of rain.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range