Plastic panel concrete formwork/ plastic shuttering formwork for concrete
- Loading Port:
- Ningbo
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 100 m²
- Supply Capability:
- 10000 m²/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Plastic formwork
plastic panel concrete formwork/ plastic shuttering formwork for concrete
Saving your time, money and energy !!!
What is Details of our products plastic concrete formwork ?
Features:
1. Long lifespan& Cost effective -- Plastic formwork can be reused over 100 times,
where Plywood can only be reused 3 to 5 times. Therefore the Plastic Formwork
is more cost effective.
2. Waterproof -- As the nature of plastic material. It's imputrescible and rustless,
especially suitable for underground and watery circumstance.
3. Interlocking Design -- No release agent needed, good effect of demolding.
4. Easy deassembly -- The template will be separated easily from concrete
5. Simple Installation -- Light weight and safe to handle, easy cleaning and very robust.
6. High Quality -- Abrasion resistance, excellent mechanical property, best impermeability.
7. Recycable -- Waste scrap molding board could be recycled.
What is Advantages of our company ?
Our anvantages
| High quality |
Reasonable price | |
Strict delivery time | |
Good after-sales service | |
Profession maker for 21 years | |
Gold supplier 9th year | |
Strict quality control | |
professional injection mould | |
3D design |
Product Photos/ plastic concrete formwork
- Q:Shear wall plastic template for the wall height and thick ratio requirements is how much?
- Plastic building template to be extended when the expansion joints: As the plastic building template than the steel mold, wood mold thermal expansion coefficient larger, morning and evening laying plastic template must be reserved for about 2 mm expansion joints (according to the size of the day the temperature difference ), No need to reserve the expansion of the slit at noon. The length of the nail is generally 1.5 inches to 2 inches is appropriate, not too long or too short.
- Q:Who used plastic building templates? How is the effect? What are the advantages and disadvantages?
- Plastic construction template is not a good place to say, talk about the shortcomings of it, 1: the quality is too heavy, 2 intensity is not very satisfactory, 3, a little fee wooden side
- Q:Plastic mold dynamic template, the size of the template
- Bigger than the fixed model on the line, a good folder folder.
- Q:I heard that there are building aluminum template and plastic template it? Which is better?
- Aluminum alloy template is the best architectural template, the advantages of a high number of turnaround, the theory is 300 times, but the actual use of 60 will have a small part of the deformation, a comprehensive calculation of 150 no problem, the second is quick, every worker day Can be assembled 20 square meters or more, three is light weight, manual transmission is very convenient, do not rely on tower crane, four is the quality assurance, the basic can meet the specifications, five is conducive to civilized construction, will not produce garbage and noise, No wood. Disadvantages of a high cost, and second, only in the standard layer to use to play advantage
- Q:Will the plastic building template on the builders really do not use the price is how much price
- Easy to use, heat insulation. A lot of building materials market there ah, to see what you want the model, the price range,
- Q:We have to start the construction site immediately, and have not used this plastic building template; I would like to ask you all the big brother who used this plastic building template ah? How is the quality of ah? So good ah?
- Plastic mold is better, light weight, high impact strength, easy assembly, high turnover rate, smooth surface, no moisture, no mildew, Naisuan Jian, no cracking, large plate, less joints, can be saw, can Nail, can be processed into any length and so on
- Q:Plastic deformation of the template how to solve or why the deformation Thank you I want the reason
- Pvc plate deformation are: physical deformation and chemical deformation.A physical deformation, the cause:???? High temperature lead to deformation, if it is such a deformation, targeted plastic raw materials for high temperature modification, can effectively improve such problems???? Improper textile lead to deformation, such deformation has two reasons, a plate of raw materials can not meet the actual requirements of the product requirements, re-deployment of raw materials formula to meet the actual requirements of the product can be. Second, the processing and storage methods are not correct, leading to deformation, such problems can solve the problem from the rootTwo chemical deformation: mainly the molecular structure of raw materials change.
- Q:Why the floor is not plastic building materials square wood and template
- Is the plastic strong? The environment on the site you know, throw off how to do, have to find strong and durable.
- Q:Does the building plastic template use it? How's the effect? Can I use 30 to 50 times? Can the fire protection requirements of the steel plate on the cast-in-place plate be achieved?
- I used, hand drawing is very convenient, can use hundreds of times, made of plastic
- Q:Why is the building template made 1830mm * 915mm and not made 2000mm * 1000mm it?
- Can be ruled length processing, can be ruled length processing, can be ruled length processing
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Plastic panel concrete formwork/ plastic shuttering formwork for concrete
- Loading Port:
- Ningbo
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 100 m²
- Supply Capability:
- 10000 m²/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Hot Searches
Related keywords