Plastic Formwork Concrete Formwork Scaffolding Types Names Scaffolding Company CNBM

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
2000 m³
Supply Capability:
100000 m³/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Plastic Formwork Concrete Formwork Scaffolding Types and Names Scaffolding Company CNBM

Developing with new technology materials, steel formworks is no longer a must in construction concrete process. More and more buildings are established with plastic formworks. And workers love this new formworks much more.

The advantages of plastic formworks:

1.First of all--light

Yes it is the first advantage of plastic formwork. It wins the great praise of both contractors and workers.

The biggest panel is 120×1500px,weights 10.5kg only. It can be lift and set up by one person easily, which means there is no need for cranes on site.Saves a lot of cost and time.

2.Easy set up

Different size of panels can firmly locked by simply turn the special handles to 90 degree. The Panels has rib on the back, which makes the system need not traditional wood blocks and nails. The panels have holes to fit tie rod, guarantee the strength of the whole system.

3.Modularity

Modular formworks composed by different size of panels,the main item is 120×1500px panel,which is used for the large area of walls and slabs. There are also small size of panels like 10×1500px,20×1500pxcm,25×1500px,inner corner 20×20×1500px and outer corner 10×5×1500px.Due to the variety of panel size, the system can form almost all size walls 120×1500px panel of multiply by 125px. The material of modular formwork is PC-ABS mixed with special glass fibers which enable panels to hold high pressures.

4.Strength

The handles are made by high strength Nilon, each panel locked by at least 4 handles, which makes the whole system strong enough to pour 1000px walls.

5.Environment friendly

The system needs no cut and nail due to the variety size. Also it needs nearly no wood. The material can be recycled after broken, so it will not pollute the environment.

6.Consequent

Concrete does not stick to plastic formwork, thus the panels need no oil before using, and can be cleaned simply by water. The surface of the wall which build by modular formwork is smooth and without rework.



Plastic Formwork Concrete Formwork Scaffolding Types Names Scaffolding Company CNBM

Plastic Formwork Concrete Formwork Scaffolding Types Names Scaffolding Company CNBM

Plastic Formwork Concrete Formwork Scaffolding Types Names Scaffolding Company CNBM


We have organized several common questions for our clients,may help you sincerely:

①How about your company?

A world class manufacturer & supplier of castings forging in carbon steel and alloy steel,is one of the large-scale professional investment casting production bases in China,consisting of both casting foundry forging and machining factory. Annually more than 8000 tons Precision casting and forging parts are exported to markets in Europe,America and Japan. OEM casting and forging service available.

②How to guarantee the quality of the products?

We have established the international advanced quality management system,every link from raw material to final product we have strict quality test;We resolutely put an end to unqualified products flowing into the market.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How do you choose the template for plastic mold products?
Is the template based on your product requirements, can you talk about the requirements of each part of your product?
Q:Plastic mold dynamic template, the size of the template
A lot of it? What are you talking about? Plastic mold points a lot of tonnage, there are 80T, 120T, 240T, 1000T, 1250T
Q:Why is the building template made 1830mm * 915mm and not made 2000mm * 1000mm it?
Can be ruled length processing, can be ruled length processing, can be ruled length processing
Q:Plastic building template made of what material
Building template is generally wood template, steel formwork, plastic template (also can be said that the composite template), steel plate high strength, can be reused many times
Q:How is the plastic building template?
4. The product pouring concrete surface smooth, bright as a mirror, to meet the requirements of decorative and decorative water, eliminating the need for secondary plastering process. 5. Turnover times more than 50 times, the template each time the amortization cost is less than 3 yuan, steel frame plastic template turnover times more than 300 6. The material is non-toxic, harmless, pollution-free, 100% recovery, green products The 7. The product acid, alkali, anti-corrosion performance. Product use temperature of -80 ℃ ~ 100 ℃, good weather resistance.
Q:I heard that plastic construction template workers do not want to use, there is such a situation
Are generally wood board, plastic with less
Q:PVC plastic template deformation how to solve
The lower the density of the foam board is easier to deform.Crust foam can be changed to coextrusion foam. General cross-linking or blending halogenation and other methods to improve Vicat. Reduce traction override
Q:Who used plastic building templates? How is the effect? What are the advantages and disadvantages?
Plastic construction template is not a good place to say, talk about the shortcomings of it, 1: the quality is too heavy, 2 intensity is not very satisfactory, 3, a little fee wooden side
Q:Is there a kitchen toilet to seal the water pipe plastic template? Where to sell?
The general building materials market have to sell, I hope my answer can help you ~
Q:Shear wall plastic template for the wall height and thick ratio requirements is how much?
Shear wall plastic template support: the wall height of 2800, wall thickness 300, for example, using 12mm template, vertical sub-rib spacing (center distance) for the 200-250mm; 15mm template, vertical sub-Leng spacing (center distance) For 250-300mm. Compared with the normal use of bamboo plywood template, the distance between the second time, the roughness of the concrete surface is basically the same, but the concrete surface smooth, to achieve the effect of water concrete, perception quality is better. To meet the requirements of cast-in-place concrete wall forming and surface quality. Construction template structure should be simple, light weight, durable, easy to manufacture.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range