Placing Boom Construction Concrete Machinery

Ref Price:
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 set
Supply Capability:
5000 set/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Placing Boom Construction  Concrete Machinery 

Product Description:

The placing boom has a Z-shaped boom assembly with three foldable sections, which can swing through 360 

degrees while luffing, folding/unfolding, thus allowing it to place concrete to form walls, pipes, columns, piles and 

other vertical structures without confined placement areas.

The boom assembly’s luffing; folding/unfolding and swinging are carried out hydraulically with buttons. The hydraulic 

and electrical system feature overload protectors, flow controls, alarms, phase sequence protectors and so on, 

which ensures the placing boom to have reliable performance, easy and smooth operation, and high safety.


Scope of Application of the Equipment

The HG15BHG17Bconcrete placing boom is a concrete placer for combined use with a concrete pump in 

concrete placement operations. It can be widely used in the construction of various types of concrete structures like

 industrial and civil buildings, bridges, roads, and other types of infrastructure.

This equipment can only be used in concrete construction operations, but not in any other operations, like dragging, 

moving, or hoisting heavy articles or personnel. The equipment is also not allowed to be used in any location where 

any combustible or explosive material exists or a cave-in may occur.

 

Product Advantages:

OKorder'sConcrete placing boom Channels are durable, strong, and resists corrosion.

 

Main Product Features:

·    Premium quality

·    Prompt delivery & seaworthy packing (10-20 days after receiving deposit)

Reliable performance

Easy and smooth operation

High safety.

·    Professional Service

·    Competitive pricing

 

Product Specifications:

Dimensions and masses of the complete machine and its major components

 

FAQ:

Q1: Why buy Materials & Equipment from OKorder.com?

A1: All products offered byOKorder.com are carefully selected from China's most reliable manufacturing enterprises. Through its ISO certifications, OKorder.com adheres to the highest standards and a commitment to 

supply chain safety and customer satisfaction.

Q2: How do we guarantee the quality of our products?

A2: We have established an advanced quality management system which conducts strict quality tests at every step,


 from raw materials to the final product. At the same time, we provide extensive follow-up service assurances as 

required.


Q3: How soon can we receive the product after purchase?

A3: Within three days of placing an order, we will begin production. The specific shipping date is dependent upon 

international and government factors, but is typically 10 to 30 workdays.

Q4: If we can produce some Concrete Machinery according to customersrequest?

A4: Yes, we can produce Concrete Machinery according to the difference country situations to make it suitable to 

the market and customers. We have very professional technical team to make the design.

Q5: How to make a quick resolution for after service?

A5:OKorder and our manufacture both have overseas branches all-around of world, IF needed, the seller shall 

dispatch 2 engineers to the buyer's site for supervision of training. The buyer shall make available of necessary 

facilities &skilled personnel at site for training.


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What does HZS mean in the HZS120 concrete mixing station
Because building aggregate measurement compared with standing aggregate metering, reduced the four of the intermediate links, and the vertical blanking metering, saved measuring time, thus greatly improving the production efficiency, under the condition of the same model, mixing building production efficiency than mixing plant production efficiency by a third. Such as: HLS90 floor of production efficiency and production efficiency of HZS120 stand HLS120 floor of production efficiency, production efficiency is equivalent to HZS180 stand HLS180 floor of the production efficiency is equivalent to the productivity of HZS240 station.
Q:How much water does a concrete mixer use every day?
Water is an indispensable part of the concrete production industry. As an investment company in a concrete mixing station, it is also important to have control over water use. It is also an aspect of production cost control. The use of water used in concrete stations is not the main water link. Flush the blender and cement truck every day to use a lot of water. The concrete is very difficult to handle because of the condensation. So it is the most effluent project in the production standstill. And the washings of these rinsing equipment contain water slurry, aggregates and aggregates, etc. From the environmental point of view, the water of cement mortar or concrete is strong alkaline, the PH value is high, can reach about 12, free discharge can pollute the environment. Therefore, with the continuous improvement of the environmental requirements in recent years, the waste water treatment of the mixing station becomes the main concern.
Q:How much concrete is produced by the js1000 type of the concrete mixing station
The JS1000 is only the mainframe model and depends on the power of the whole machine and the size of the batching machine. The JS1000 has HZS50, 60, 75, which is in theory, 50, 60 and 75 per hour. The actual operation is certainly less, about 80%
Q:What raw materials and equipment do you need for your own admixture?
The main ingredients of admixtures are: the mother fluid, the composition of the air and the composition of the mixture, and the water. The concrete formulations are determined according to the different materials of concrete, which is usually the mother solution and the adjustment time. The parent fluid is itself well adapted and does not require a lot of material. Complex admixtures do not require any other equipment except for the geosyncline configuration.
Q:What are the facilities of the concrete mixing station
It can be divided into five large parts of the mixing host, material weighing system, material conveying system, material storage system and control system
Q:The mixing time of the concrete mixer is in which standard
The quality control standard gb50164-2011 should not be produced for 40 seconds in the winter of 30 seconds
Q:What is the difference between a concrete mixer and a concrete mixer
The bone material of the mixing tower is on the top, and the aggregate is measured directly into the mixer. The concrete bin of the commercial concrete station is below, and the bone material is measured and then transported into the mixer after being transported by the inclined belt (which also has some use of the elevator). In a popular way, it is called the building, which is called the second ascent. The steel structure will be larger and the diagonal belt will be relatively longer because of the bone material in the mixing building. But in productivity, the churn is about a fifth higher than the commercial concrete station. In operation, because the inclined belt of the commercial concrete station starts frequently, the energy consumption and the failure rate will increase, and the energy consumption of the mixing building is lower than the failure rate. In the end, because the production capacity of the concrete station is small, the structure is easily disassembled and can be made into a container transfer site, which is suitable for the construction site. The mixing tower is large and high in productivity, and can only be used as a fixed mixer, suitable for the supply of large water projects or large quantities of goods. So customers in the difference between commercial concrete, concrete stand and commodity concrete mixing floor, from aggregate (material), the production efficiency and so on, to choose and buy the right equipment.
Q:Concrete mixstations belong to no special equipment
Special equipment is referred for life safety, greater danger of boilers, pressure vessels (including gas cylinders, hereinafter the same), pressure pipes, elevators, lifting machinery, passenger ropeway, large-scale amusement facilities. The boiler, pressure vessel (air bottle), pressure vessel is the pressure type special equipment; Elevator, hoisting machinery, passenger rope and large amusement facilities are special equipment for mechanical and electrical equipment.
Q:What is the concept of on-site concrete mixer station
The concrete mixing station is at the construction site to set up a soil mixing concrete equipment, including automatic conveying equipment, measuring equipment, concrete mixing equipment, cement storage warehouse etc.
Q:How long does it take to build a concrete mixer station?
The main idea is that the goods are completely incomplete, and the crane, the manpower, the mechanical tools. If everything is in place, then the pure installation will be two weeks to a month. Of course, also see you buy what type of product, container type is compared commonly faster, smaller and faster, under 3000 type slightly faster, 4000 and 5000 slowly

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range