PITCHED ROOF RACKING SYSTEM

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

PITCHED ROOF RACKING SYSTEM


Introduction

Pitched Roof Racking System designs with great flexibility both for commercial and residential roof solar system. it is

suitable for installing framed and frameless modules flushed to the pitched roof. GS series product have the innovated

design of GD Rail and D module make the installation more easily and quickly. High pre-assembly parts and customized

solution to save your install time and money.



Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Fire spray installation in the anti-swing stent approach?
4 water branch on each pipe section, adjacent to the nozzle between the pipe set of hanger should not be less than one, the hanger spacing should not be greater than 3.6m.
Q:What is a finished hanger?
Finished hanger Overview Finished product hanger is directly from the manufacturers to produce stereotypes of the channel and a variety of connectors, and then by the construction staff on-site loading of the hanger system.
Q:What are the hidden dangers of solar PV systems? It is best to classify, such as stents, inverters.
Antistatic floor of the stent system is worth mentioning is "easy to pave the way." "Easy to pave the" anti-static floor bracket system is a patented technology, but also the only use of aluminum alloy stent system to do the system, good stability, high load, integrity, pavement after the anti-static floor is very smooth ,
Q:How to build an effective teaching stent
So, what is the bracket, teaching design and how to build a bracket? This article to a writing design prototype for the case, how to teach in the design of students for learning and development of stent. First, what is the teaching design Teaching design is the protection of effective teaching, although different scholars on the interpretation of teaching design is not the same
Q:Is the template and stent two or one?
Material staff, that is, the contractor to see the words in accordance with the quota on it. The template is the contact area, the stent is the building area.
Q:How to remove the climbing bag bracket
Mountaineering bag, as the name suggests is the climbers used to load the equipment backpack. Mountaineering backpack is equipped with a variety of travel items important equipment, travel is essential.
Q:What is the difference between a shock support and a conventional stent?
he lack of horizontal seismic support structure; 2, seismic support hanger mainly bear the horizontal load of the pipeline
Q:Easy to pave the anti-static floor bracket system?
The patent is made of a specially designed T-shaped aluminum and a dedicated grooved binaural leg to form a straight line, and then a plurality of straight lines are formed in a very flat plane, Between the material, the composition of a width of 600mm is very flat track,
Q:What is the full support system
Full scaffolding is mainly used for large single-storey building, exhibition hall, gymnasium and other high-rise, large building between the top of the building decoration and structural construction, must contain pole, bar, bracing, scissors support.
Q:Fire engineering, piping, valves, stent installation of what specific requirements
Design drawings and other technical documents complete, and reported by the owners and supervision and approval. Construction plan has been approved, and made to the team at the end. Temporary facilities and water supply, power supply to meet the normal construction requirements. Related equipment has been fitted and into the scene, with construction conditions.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range