PET Braided Sleeving

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT or LC
Min Order Qty:
3000 Meters m
Supply Capability:
3000000 Meters per Month m/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Detailed Product Description

 

Expandable sleeving consists of flexible, flame-retardant woven polyester that met

The braid is able to expand up to 3 times its normal size and isused for bunding and protectiong of electrical cables in power-supply machineand automobile sectors.

 

1.Material: polyester (PET) monofil free of hologen

2.Temperature range : -70C ---- 150C

3.Flammability : self-extinguishing according to VW-1

4.Colour : black,grey,white,red,green,blue,yellow,purple,pink,orange,nacarat

5.Melting point 225C~235C

Does not trap heat or humidity Rot-free Self-fitting over many shapes and sizes

Self-extinguishing when used to encase typical non-flammable wires or cables

Fray resistant

6.Approval : CSA,UL,Reach and ROHS, low smoking and self-extinguishing

7.Flammability : self-extinguishing according to VW-1

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Water pipe in the next line in which the norms have to solve
60 meters -80 meters. The usual perforator work distance of up to 100 meters. Need to cable for the armored Caixing, or more than 80 will be the cable sheath to receive damage, affecting the insulation and the useful life.
Q:Will the fire alarm system RVV, RVS, KVV, RVVP, respectively, what line
The stress pipe is designed to eliminate stresses and reduce stress concentration for a variety of cable terminations and high voltage connections and can be reduced from several hundred volts to any voltage
Q:Host water in the end is how the same thing
YC3 * 25 + 1 * . Y said hard line, three 25cm2 plus a 10cm2 four-core cable. With P is shielded, with K galvanized metal shield. R represents the cord.
Q:Wire and cable should be used in parallel when the attention
. it is easy to understand, assuming that there is only one access and aggregation switches. A group of source signals and only in an optical fiber transmission, because the optical fiber transmission is one-way, send and receive each need a light, so the cable can only and 2 core. A 2-core cable ends with jumpers and pigtails to form the basic link. The basic configuration for a 2-core cable, dual port (dual port for the 2-core, single-port 1-core) jumper . 4 pigtail, coupler 4. The icon is a basic link. . the reason why you do not understand how to configure, the main reason is that the actual construction process, the engineers are often based on the actual situation and the specific needs of the configuration. For example, the link to do 4 heavy backup, for the future decoration of the floor reserved, the other unchanged, then the cable has become 8-core; patch panel reservation point 2 heavy backup, then the pigtail has become . coupling But also a link down: a 8-core cable, dual-port (dual-port for the 2-core), the connector is . so a link down: , Single-port 1-core) jumper . 8 pigtail, coupler 24 only. And then you messy: lying groove, which Nima in the end what corresponds to the relationship? What's the connection? The proportion of each project configuration is not the same ah? Can not find the law. A person only a pair of feet, the basic configuration of a pair of shoes is enough, but the actual situation of the number of shoes each person is not the same, as to why different, only the parties to understand. . therefore, in order to know how much tail fiber, first, in accordance with what I said the first point, understand the basic configuration; second, according to customer needs and engineers to consider the specific way of construction, do not 5% -10% Redundant, need not need a backup, in order to understand the correspondence between these numbers.
Q:And twisted pair cable parallel to the laying of the same route with 10kVA 380V power cable, the minimum spacing between the two cables should be how much?
The use of jacket line laying line does not require casing, if you want to casing, can only remove the wire in the casing. The method is as follows: . remove the power when the first disconnect the power, the experience to determine the power after the operation. . remove the wire casing, to a period of demolition. That is, to remove a section of a tube, so that the line will not make a mistake.
Q:Have you know the great god of the bridge? Cable drawings for CAD drawings
There is no requirement, if there are drawings, then you can follow the drawings to operate, but it is best to find a professional to do, buried tube or set up from the air can be
Q:220V wire there is no electromagnetic radiation? What is the radiation distance?
Pumping line in front of the old line connected to the new line must pay attention to the joints do not too much or the face of the wire out of the old line there is also a pull line if the inside of the line has been pulled out with a fine wire in front of a circle do not hinder Wire in front of the slowly to send the card to the main place to turn the wire will not because of his own lines are inside the wall will not change the line because of the destruction of the home of this you, although you rest assured
Q:ASUS P8H61-M LE addition to the CPU fan can add a fan? Can you add a plug to the fan?
Customers want what you should have, others do not you should have. Shop to people-oriented.
Q:Behind the living room sofa, what is the box with many wires inside the wall?
Heat shrink tube and cable support: . the main insulation between the cable core, the exposed wire and the whole set of insulation with the original layer of not less than 20mm, tightened after the outer jacket; . The same with the original outer layer of the intersection of not less than 20mm, if possible where the moisture immersion, the intersection needs to be coated (heat shrink tubing) sealant. Heat shrink tubing and cable supporting the use of specifications:
Q:How does the computer monitor be connected to the satellite antenna receiver video cable to watch TV?
Motherboard and chassis are not matched, can not be used, it is recommended to replace the chassis, if you intend to adhere to the original equipment, after the mouth can be used
Our factory covers an area of 7, 000 square meters, and has 200 automatic high speed machines, and 3 precise monofilament production lines to ensure our production capacity can meet the volume order. We can make 6,000,000 meters of insulating sleeves per month. Meanwhile, our strict QC system can provide top quality guarantee, and our experienced R&D team is able to design and develop new products in accordance with the market and customer's requirement.

1. Manufacturer Overview

Location Guangdong, China
Year Established 2004
Annual Output Value Above US$100 Million
Main Markets North America
South America
Eastern Europe
Southeast Asia
Africa
Oceania
Mid East
Eastern Asia
Western Europe
Company Certifications ISO9001:2000 ;RoHS;SGS ;CSA

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage 51% - 60%
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size: 5,000-10,000 square meters
No. of Production Lines Above 10
Contract Manufacturing OEM Service Offered Design Service Offered Buyer Label Offered
Product Price Range