passanger elevator parts low cost load cell EWD-H-XJ3

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Passanger  elevator parts load cell
EWD-H-XJ3 Elevator Load Weighing Device

INTRODTION MANUAL

l This system is applicable to all elevators with movable platform car (containing 3-channel programmable switch signals)

l Main characters:

1. Contactless inductive working mode, With no mechanical movement,no need to fix the original position of elevator overload switch, and to change structure of elevator platform car.

2. Electrical properties is in compliance with the standard of the International Electro-technical Commission.

3. Set up all parameters on the spot.

4. Adopt strong inductive magnet, improve the anti-interference ability to the utmost.

5. System carry scientifical computing out according to mathematical equations to automatically amend detention of error. It also has no-load auto zero capacity.

6. It is totally convenient to adjust on the pot by means of artificial self-study or artificial displacement.

7. Signal created by ourself control method of programmable output signal created by ourself is applicable to all kinds of traction elevator with movable platform car.

8. Integrated structure design: small size, easy installation.

l Technical index

1

Scope of application

Applicable to all elevators with movable platform car. range of auto-detention (2.0mm ≤car bottom displacement≤10.00mm ); range of manual set displacement: 2.5~9.9mm ( relate to parameter PD)

2

sensitivity

Rated load /200 (5.0kg when rated load is 1 ton)

3

System error

≤1.5% ( 5~40℃ )

Working temperature range≤3.0%

4

nonlinearity

≤1.0%

5

Output form

Solid state relay

Programmable universal signal

① 3 channel programmable output mode are following: no- load, light- load, semi-load, heavy load, rated load and overload (user can freely set up the range of change.

② Each channel can be programmed as dynamic close or dynamic break contact.

③ Contact capacity: DC/AC 32V/15mA

6

Storage environment

-25~75℃

7

Working environment

Temperature:-20~55℃

8

Relative humidity

20%~99%RH

9

Reaction time

≤0.25s

10

Power supply

AC/DC2410%V/150mA

11

Installation position

movable platform car of elevator

12

Machine dimension

45X45X903

l Product appearance, internal structure and interface specifications

EWD-H-XJ3

appearance

External interface

interface specifications

P1

Com

Sharing Com

J1J2J3,3 channels Solid state relay output

P2

J1

P3

J2

P4

J3

P5

System power supplyDC/AC24V(±10%)150mA

absolutely can't put this device "P5, P6" outside of the directly connected to external power supply output port, thus may cause permanent damage shall not be responsible for the company

P6

1. J1J3/J4/J5 internal solid state relay, Maximum load capacityDC/AC 32V/50mA

2. Output signal programmable for "light ~ overload", to participate in the elevator control logic

l Machine dimension and installation schematic diagram

Outlook dimension installation schematic diagram

Installation Instruction

1. As near to install this device in the bottom or the elevator the overload switch location, near the center of the system should be installed on the bearing beam of the elevator to the bottom, induction magnet adsorption in the bottom, and the marking surface of weighing device sensing point;

2. System bracket should be made on the basis of the condition of the elevator, but must use the not easy to deformation material, the better of the thickness is more than 4 mm or with stiffener, to prevent sway;

3. Adjust the device, make the bottom magnet aimed at center of end surface. At the same time must ensure that the device end face and the magnet end face parallel to each other.

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         

Installation method

If you need details, please send us for this product "user manual".


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How many years does the construction elevator usually use?
In principle, eight years; But for eight years has scrapped section standard of standard section pillar thickness wear to design thickness of 1/4 (like this value) will be scrapped or downgrade use; After eight years, the construction elevator can also be used, but the structural parts need to be broken and the test can be used again. The pendant safety device for the construction elevator is required to be tested every year for five years.
Q:What's going on with the decline in construction lift
Check whether the brake contactor and normal, contactor adhesion conditions will decline, brake pads have the problem not only rise to fall, fall in the same slide. If the contactor is ok, you can see that there is a groove on the brake pad, and it is only replaced if the brake is not damaged, such as cracking. If it's a frequency conversion elevator, if you're down, see if the converter has any fault code, if you have a consulting manufacturer. The assumption is that the anchuan frequency converter, which may be a real SE failure, means that the timing error is not normal for controlling the contact of the receiver.
Q:Why is the construction elevator open on one side and the other on the other
Double door is feeding door, double door to the outside of the other's role is to prevent someone broke into the cage after elevator start circle accident, because outside over the door of the cage has a travel switch, when someone will ring into the cage opened the cage door, travel switch action at this moment, the elevator power cuts, you won't get elevator lay down this kind of thing. The door is open only when the lift is off the ground, as is said upstairs.
Q:The construction elevator can not operate during the use of several stages of wind power
The top wind speed is no more than 20m/s, which is level 8, the gale level 17.2-20.7 m/s, I am a tower crane and construction elevator accessories. I hope my answer will help you.
Q:How much cable does the construction elevator 44KVA need?
44KW three phase power: 79A, BV5X16
Q:How is the construction elevator installed
The construction elevator should choose a good position first, do the elevator foundation, at the same time make the wall in the setting process. This one has the corresponding elevator basic drawing, should the professional personnel carry on setting up and disassembling.
Q:The construction of more than many floors must be used for construction elevators
Elevator drivers must be trained in special safety technology, qualified for examination, and will be on duty. Strict drunken work. The driver must be familiar with the performance, construction, maintenance and maintenance of the elevator, and fill in the mechanical resume and the required reports in time. No inflammable, flammable goods and other sundries shall be piled up in the vicinity of 5m in the construction elevator, and no ditch, pits, or groove shall be dug in this area. The floor feed of the elevator should be set up for protection. When the cage is repaired, if the parts are removed and the weight of the ladder is below the weight, the ladder cage must be locked in the rail. It is strictly forbidden to use the shaft of the construction elevator to support the cable line and other items not related to the elevator. A tower crane or other lifting machine that is built on the same site shall be more than 5m above the elevator and should be properly protected against collision. After the construction elevator is installed, it must be checked and approved by the relevant personnel.
Q:The safety officer shall be responsible for the work of the construction elevator
(1) the use of dual-use functions of the construction elevator, the installation and removal of the professional personnel issued by the competent department of construction administration shall be undertaken by the professional personnel. The personnel who have passed the training, qualified for the examination and obtained the certificate of the post shall be operated and repaired. (2) the capacity of the concrete base culture cooperation should not be less than 150kPa, the tolerance of 10mm and the drainage facility should be allowed. The distance between the guide bracket of the elevator and the wall of the building should be suitable, and the smoothness should be stable. (3) the lifter is used to control two directions, and the vertical control is 0.05%. Each floor shall have a platform, a passage, a fence and a protective door. No obstacles can be found. (4) the elevator that is installed in a dark place, and the passage shall be illuminated and a floor display lamp and floor number; A closed barrier should be set up in the well. The elevator shall be subject to acceptance by the technical director and the relevant departments, and shall be tested by the crash and shall be used in the rear. (5) in the use of or during the use of the elevators, the manufacturer or designated unit shall conduct the debugging and maintenance and verification. The lifter should undergo a fall test every three months and the fall test should be adjusted when the fall test exceeds 1.2 m. Every time it falls, the receiver should be repaired once.
Q:Do the elevator need to be installed when the main project is in construction
Installation, of course. The general building should be installed at about 10 meters on the 4th floor, or the person will go up and down the time is dangerous, and there will be some materials that can't be carried by the tower, too slowly
Q:How to save the elevator accident
Take escalator safety knowledge Passenger escalator before to keep checking your shoes clothing habits should fasten shoelaces wear skirt drag clothing such as optimum rolled up against the edge of the elevator, comb plate drag or stuck passengers carry baggage increase the risk of escalator accident now need extra or simply choose to take the stairs Escalator self-help hair accident? Every escalator, the stop button and denier hair escalator accident near the button passenger safety awareness should be kept between the first button escalator automatic stop energy efficiency to reduce accident damage Take escalator Cheng Shen fall should use to protect themselves as to avoid the rot slip or fall high neck should hands fingers crossed by strongly impact the dangerous clasped, protect brain neck elbows forward cover bilateral temporal pour knees bending forward as far as possible to protect the chest abdominal viscera side found important discoveries escalator before the sudden fall should the horse stopped footstep simultaneous for help inform passengers will forward near the accident should maintain a stable mood calm reason for avoiding the accident hair running blind hair stampede damage

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range