Pained cup lock Scaffolding system for building staging

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
10000 pc
Supply Capability:
10000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Quick Details

Material:

Q235/Q255/Q345

Color:

Red,Blue,Silvery,Green

Type:

Ledger,vertical,diagonal,bracket,base plate,etc.

Certification:

ISO9001:2008

Surface:

Hot dip galvanized,Paint,Galvanizing

Weight:

As per your requirement

Noted:

OEM service

SGS report:

EN12811, CE

Style:

ringlock system scaffolding

Marketing:

Europe,middle east,australian,america,etc





Packaging & Delivery

Packaging Detail:pallets or customer needs
Delivery Detail:As the requirement of clients

Specifications

Pained cup lock Scaffolding system for building staging 
1.3 Years Warranty 
2.Operating Friendly 
3.Full Safety Devices

    Pained cup lock Scaffolding system for building staging

Trade & Market


Main Markets:North America
Southeast Asia
South America
Oceania
Western Europe

Total Annual Sales Volume:US$10 Million - US$50 Million  

Export Percentage:91% - 100%  

We have been in the business for more than 16 years, and all our products are BS 1139 and EN 74 certified, the quality is the best. Our products are very popular in European countries, Australia, North America, Mid-east countries, and South East Asia and some African countries, etc.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Latch type disc scaffolding accessories are national patent products?
Disk lock scaffolding called socket type Pankou scaffold.Pankou scaffolding is a new scaffold, the products imported from Europe in the last century in 80s, is the product after bowl-scaffold upgrade
Q:The basic form of external scaffolding
The bowl buckle steel tube scaffold is composed of steel pipe pole, cross bar, bowl buckle joint and so on. The basic structure and erection requirements and fastener type steel pipe scaffolding similar, the main difference lies in the bowl buckle joint.The bowl buckle joint is the core component of the scaffold system, which consists of the upper bowl buckle, the lower bowl buckle, the cross bar joint and the limit pin on the upper bowl buckle.
Q:Scaffolding/Industrial piercing?
I have two lobe piercings on both ears, two cartilage piercings and an industrial that i got five months ago. I was expecting my industrial to be very painful but it wasn't that bad (i have a high pain tolerance though) its a bearable pain. Like all other piercings the healing process is the worst part and still when i bump it (like when im doing my hair) it hurts like a B****! lol. And don't play with it alot when you first get it, it causes scar tissue bumps. Use H20cean spray or you can do 1/4 tsp of sea salt and 1 cup of water to help heal it. The healing time is long, 4 months to a year. I paid $65 dollars in the us idk how much that is UK. It was definitely worth it though! Go for it :)
Q:Fastener type steel pipe scaffold composed of two components? What are the roles?
Bowl buckle steel pipe scaffolding when using steel pipe, as a "single steel pipe scaffolding"; when using the steel cross bar, for the "steel pipe based scaffold".2.2 according to the vertical and horizontal transmission force between the vertical and horizontal1) the frictional force acting on the contact surface. That is, the friction force at the contact surface of the joint is pressed to support the load of the cross bar and is transmitted to the vertical rod;2) welding force. Most of the cross bar and vertical rod socket connection is used in this way, the door frame is also this way;3) direct pressure transmission. This method is more common in the horizontal bar placed in the top of the scaffolding;4) shear force of pin. That is to say, the connecting rod and the hole of the vertical rod are connected by the pin rod through the vertical connecting plate of the transverse rod to realize the double side shear action of the connecting rod and the pin rod. This method is rarely seen in the connection between the rod and the vertical rod.
Q:In the construction of steel pipe scaffolding steel pipe and steel stamping fastener usage ratio is how much?
Our company produces cheerin card stamping steel by the National Institute of architectural design and reasonable design, set all fasteners advantages, good use, portability, beautiful appearance, the overall mechanical state. The best selection of high-quality alloy steel and accessories manufacturing, strictly ensure product consistency, quality is guaranteed. The surface treatment of zinc plating and good anti-corrosion performance. Have patience, fracture, strength, deformation, durability, good uniformity and steel, non slip effect is the best.
Q:when do i change my scaffold piercing?
Hi :) You can change it after 4 months usually But sometimes it can take up to a year It depends on the person , everybody's body heals differently You should go back to your piercer and ask if it's healed enough to change the jewellery Yep , it's normal A scaffold piercing goes through the cartilage and cartilage piercings can take up to a year to fully heal :)
Q:On what page of The Scarlet Letter does Hester enter the scaffold?
i'm no longer completely constructive of the answer to this actual question, yet I only finished a unit in this novel and could like to help with any extra questions...be satisfied to invite -Alice
Q:Specification and type of scaffold erection
technical requirementThe materials used for steel pipe scaffold shall meet the following requirements:1 steel pipe diameter should be 48 ~ 51mm, wall thickness of ~ 3.5mm, length of 2.1 ~ 2.8m and 4 ~ 6.5m is appropriate, there are serious corrosion, bending, cracks, damage shall not be used.
Q:Having problems with my scaffold/industrial piercing?
dw i had the lump for 6 months nd after a year it has finally healed but u have to be patient nd the other comment is right use tea tree
Q:what is common cause of formwork and scaffolding failure during construction?
Improper assembly seems to be a big one. Workers often neglect to install the internal diagonal from upper corner to opposite lower corner when it comes to scaffolding. Formwork usually fails by inadequate bracing at the bottom as hydrostatic pressure builds. This can be mitigated to some extent by allowing the concrete to set up a bit before pouring the next layer. For earth formwork, you have to be real careful about expansive clay becoming saturated and overwhelming the bracing as it expands.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range