OEM Kwikstage System Kwikstage Scaffold Galvanised Kwikstage Standard Hot DIP Galvanised CNBM

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
50 m.t.
Supply Capability:
30000 m.t./month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

  • Quick Details of  OEM Kwikstage System Kwikstage Scaffold Galvanised Kwikstage Standard Hot DIP Galvanised 

  • Type:Fixed

  • Material:Steel

  • Construction Properties:Building Scaffold

  • Lapping Form:Full Scaffolding

  • Framework:Combined Scaffolding

  • Supporting Mode:Floor Type Scaffolding

  • Erection Position:External Scaffolding

  • Scaffolding Part Type:Scaffolding Frames

  • Move Method:Attached Lifting Scaffolding

  • Structural Style:Multi-Pole Scaffolding

  • Place of Origin:China (Mainland)

  • Surface:Painted or Hot Dipped Galvanized

  • Material.:Steel Q235 Q345

    Thickness:4mm;3.2mm;3mm

  • OEM Kwikstage System Kwikstage Scaffold Galvanised Kwikstage Standard Hot DIP Galvanised  CNBM


  • OEM Kwikstage System Kwikstage Scaffold Galvanised Kwikstage Standard Hot DIP Galvanised  CNBM


  • OEM Kwikstage System Kwikstage Scaffold Galvanised Kwikstage Standard Hot DIP Galvanised  CNBM


  • Descriptions of OEM Kwikstage System Kwikstage Scaffold Galvanised Kwikstage Standard Hot DIP Galvanised 

Kwikstage Scaffolding is a multi-purpose modular scaffold system which can be used for all forms of access and support structures in the building and construction industries, ship buliding, offshore construction and industrial maintennace.
Details of Metal kwikstage Scaffolding
1. Metal kwikstage scaffolding system is a new type of selflock scaffolding which is very popular in Oceanian,African construction.
2. Metal kwikstage scaffolding System is suitable for both inside concrete slab supporting and outside masonry Construction multi-purpose for construction.
3. Metal kwikstage scaffolding systemstandard is weld with a plate every 600mm which can join ledgers at 90 degree.
4. Metal kwikstage scaffolding system ledger is a horizontal member with a blade at each end for insertion into the standard plate.
5. kwikstage scaffolding system is quick to erect and strip which has completely replaced other scaffolding.



  • The Accessories of OEM Kwikstage System Kwikstage Scaffold Galvanised Kwikstage Standard Hot DIP Galvanised 


  • STEEL STANDARD

  • Material: steel tube φ48.3x3.25mm

  • Surface finish: hot dipped galvanized

  • Standard with normal length 3.0m, 17.02kg

  • Standard with normal length 2.5m, 14.32kg

  • Standard with normal length 2.0m, 11.64kg

  • Standard with normal length 1.5m, 8.94kg

  • Standard with normal length 1.0m, 6.26kg

  • Standard with normal length 0.5m, 3.56kg

  • Topper Standard, 1.72kg

  •  Material: steel tube φ48.3x4.0mm

  • Surface finish: hot dipped galvanized

  • Standard with normal length 3.0m, 19.48kg

  • Standard with normal length 2.5m, 16.38kg

  • Standard with normal length 2.0m, 13.28kg

  • Standard with normal length 1.5m, 10.18kg

  • Standard with normal length 1.0m, 7.07kg

  • Standard with normal length 0.5m, 3.97kg

  • Topper Standard, 1.93kg


  • STEEL LEDGER 

  • Material: Made of steel tube φ48.3x3.25mm

  • Surface: hot dipped galvanized

  • Ledger of  3.00m, 13.00kg

  • Ledger of  2.44m, 10.67kg

  • Ledger of  2.39m, 10.60kg

  • Ledger of  1.95m, 8.87kg

  • Ledger of  1.83m, 8.29kg

  • Ledger of 1.78m, 8.20kg

  • Ledger of 1.47m, 6.97kg

  • Ledger of 1.22m, 5.98kg

  • Ledger of 1.05m, 5.31kg

  • Ledger of 0.71m, 3.97kg


  • TRANSOM (ANGLE)

  • Material: Made of steel 5# angle

  • Surface: hot dipped galvanized

  • Transom 2.39m, 17.71kg

  • Transom 1.78m, 13.60kg

  • Transom 1.27m, 10.19kg

  • Transom 1.22m, 9.85kg

  • Transom 1.05m, 8.70kg

  • Transom 0.813m, 7.12kg

  • Transom 0.71m, 6.42kg

  • Transom 0.60m, 5.75kg

  • Transom 0.51m, 5.08kg

  • L/A Transom 1.8m, 11.78kg

  • L/A Transom 1.2m, 9.56kg


  • BRACE

  • Material: Made of steel tube φ48.3x3.25mm

  • Surface: hot dipped galvanized

  • Brace 3.6m, 15.33kg

  • Brace 3.2m, 14.00kg

  • Brace 2.7m, 12.25kg

  • Brace 2.0m, 9.33kg

  • Brace 1.6m, 7.99kg


  • STEEL PLANK

  • Material: Made of 1.8mm thickness pre-gal.steel sheet

  • Surface: hot dipped galvanized

  • Size: 229mm(W)x 66mm(H)

  • Steel Plank 4.00m, 25.30kg

  • Steel Plank 3.00m, 18.90kg

  • Steel Plank 2.44m, 15.37kg

  • Steel Plank 2.00m, 12.52kg

  • Steel Plank 1.81m, 11.42kg

  • Steel Plank 1.25m, 8.20kg

  • Steel Plank 1.05m, 7.05kg

  • Steel Plank 0.736m, 5.25kg


  • FAQ

  • 1. What is considerations of Scaffolding installation?

  • There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,

  • (1) scaffold frontage hurtful to prevent falling objects protection is required.

  • (2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator

  • 2.What are the certifications of your products?

  • Certified by SGS, BS1139, EN74, Local Test Report.

  • 3. How long is the warranty period for your product?

  • Our products warranty is 2 years.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Can anybody provide me the formula for calculating scaffold volume on circular tank?
Step 1. Measure the diameter of the tank (D). Step 2. Measure the height (h) for a vertical tank or length (l) of a horizontal tank. Step 3. Calculate the cross-sectional area of the tank using Equation 1. Equation 1: Cross-sectional Area, A = 3.14 x D x D/4 Step 4. Calculate the volume of the tank in cubic feet using Equation 2. Equation 2: Volume in cubic feet = A x h [for a vertical tank] Volume in cubic feet = A x l [for a horizontal tank] Step 5. Convert the volume of the tank from cubic feet to gallons using Equation 3. Equation 3: Volume in gallons = (Volume in cubic feet) x 7.48
Q:Can I get an industrial/scaffold piercing pierced with 2 separate bars?
Yep, some piercers prefer to do it that way. Just make sure you let them know that that's what you want when you go into the shop and they can accommodate you. No cartilage piercing is healed enough to remove in 6 weeks. Cartilage piercings can take anywhere from 6-12 MONTHS to fully heal.
Q:The construction scheme of high rise and external cantilever scaffold!
(2): Fastener fastener should comply with the "steel pipe scaffolding fasteners" (GB15831 1995). The provisions of fastener can't crack, porosity, trachoma and other casting defects. Surface fastener and steel tube to contact good fastener clamping steel pipe, the minimum distance of the opening should be less than 5mm.(3) the foot board; steel foot plate generally with thick 2mm steel plate, and the table has a uniform distribution of anti slip hole, board length 2~4m, width 250mm of fir or pine, board length 3~6m, width not less than 150mm.
Q:A painter is standing on a scaffold raising at a constant speed. He pushes a can over at 15.00 meters.?
The initial velocity is not zero since the scaffold is moving upward when the can gets pushed over. And final velocity, vf, does not represent the speed of the scaffold (if that is what you're trying to solve). y = (vo)(t) - (1/2)gt² 15 m = (vo)(3.25 s) - (1/2)(9.81 m/s²)(3.25 s)² vo = +20.5 m/s
Q:How long is the service life of disc scaffolding?
In the service life of the product if the corrosion and deformation can not be put into the construction of the building.
Q:Where to use scaffolding in construction
Construction height of 2m above to use scaffolding. Most of the site is the exterior, internal walls and paint.Scaffolding (scaffold) refers to the construction site for the workers to operate and solve the vertical and horizontal transport and erection of various stents. The general term of the construction industry, refers to the construction site used in the external walls, interior decoration or high level can not be directly construction. Mainly in order to work on or off the construction of the external security network and the installation of high altitude and other components, it is put on the shelf, scaffolding materials are usually made of bamboo, wood, steel or synthetic materials, etc.. Some projects also use scaffolding as a template, in addition to advertising, municipal, transportation, Luqiao, mining and other sectors are widely used.
Q:On what page of The Scarlet Letter does Hester enter the scaffold?
i'm no longer completely constructive of the answer to this actual question, yet I only finished a unit in this novel and could like to help with any extra questions...be satisfied to invite -Alice
Q:How to calculate the vertical force of scaffolding
First, the calculation of small beams: small beams in accordance with the strength and deflection calculation of simple beams, small bars in the upper bar. According to the small bar scaffold board and live loads above the maximum bending moment and deformation the uniform load calculation of small bar.
Q:How to calculate the fastener type steel pipe scaffold
1.1.2 provides for the temporary structure of the scaffolding structure, the structure of the importance coefficient of gamma 0 take 0.9. ?The scaffold structure design of 1.1.3 on reliability requirements, considering that there is no enough statistical data accumulated by the situation, determine the probability limit state design, should be consistent with our historical experience, if using a single coefficient method was designed, the single safety coefficient should be satisfied: the strength calculation of K1 = 1.5 the stability calculation; K2 = 2. To this end, in the calculation of the introduction of the material strength of the additional coefficient of gamma 'm' or resistance to the addition of partial coefficient gamma 'R, gamma' R= gamma 0 gamma 'm=0.9 gamma' m.
Q:scaffolding piercing.. do they hurt? and how much are they in england? thanks x?
Yes, they hurt, quite a lot. But how rad they look outweighs the pain. :D

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range