• OEM Drywall Partition Metal Runner & Stud System 1
  • OEM Drywall Partition Metal Runner & Stud System 2
  • OEM Drywall Partition Metal Runner & Stud System 3
OEM Drywall Partition Metal Runner & Stud

OEM Drywall Partition Metal Runner & Stud

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
10000 pc
Supply Capability:
300000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Galvanized Steel Specification

Pls kindly check our regular size as below,if you need other special size and thickness,pls contact us we will try our best to follow you or your engineer. 

 

 

Item

Regular Size(mm)

Thickness

Heught

Width

Length

Furring Channel

0.4

22

35

3000.00

0.45

0.5

C Channel

0.4,0.45,0.5

10

38

3000.00

0.45,0.5,1

12

L-Angle

0.4,0.45,0.5

24

24

3000.00

25

25

Stud

0.45,0.5,0.6

48

50

3000.00

48

75

32(34.5)

73

Track

0.45,0.5,0.6

40

50

3000.00

Drywall Metal Profile

 Drywall ceiling Channel is galvanized metal structure  used in non-bearing partition systerm .

Drywall steel frame system is a popular way to be used to divide the space,especially using in commercial buildings.

HUILON Drywall Steel Frame System is made of galvanized steel sheet with good rust-Proof function.A variety of frames are ready for customers' demands and designers' choice for different purposes and places. One of our merits is the special hole for channel on C-stud in per 6Ocm which is easy for workers to install the electric lines and water tubes.CH and IH type of studs are the special type we developed to solve the hard work situation in elevator ventilator and offer a better protection of workers' safety.

Our dry wall steel frames are covered with HUILON magnesium fireproof boards and fulfilled with material which is heat insulation and noise-proof mineral wool between two layers of boards. It will create a better living environment than the traditional building materials.

Suspension ceiling structure,Galvanized metal structure which is the vertical metal framework used in non-bearing partition system.

Advantage and feature:

 1.Light, good strength, cauterization resistance and water resistance

 2.Matching magnesium fire-proof board, gypsum board and many other walll and ceiling board

 3.Moisture-proof, shock-resistance, environment-friendly and so on.

 4.Easy and fast for install, time-saving

 5.High quality, competitive price and complete sets of style

 6.We can supply you the products based on your specific requirements

FAQ

1.Sample: small sample can be offered by free

2.OEM: OEM is accepted

3.MOQ: small order is ok

4.Test: any third party is accepted to test

5.Factory: Can visit factory any time

6.Delivery Time: small order is within 7days or according to your order

Product Show

OEM Drywall Partition Metal Runner & Stud

OEM Drywall Partition Metal Runner & Stud

OEM Drywall Partition Metal Runner & Stud

Q:Shanghai light steel keel ceiling wall how much labor costs?
Do not know how much of your area may be a little expensive point of the ceiling 10 yuan / square wall 80 / side less expensive to the point is not the same everywhere, roughly in the 20 to 25 or so labor price.
Q:Light steel keel wall how to calculate
According to the actual calculation of the amount of work to square meters for the calculation unit, the price of both sides negotiated or set quotas.
Q:Light steel keel partition wall door how to do
With woodworking board to open the door frame can be ..... This should be carpentry know the practice.
Q:75 series of light steel keel wall double-sided double-layer 12 thick plaster board filled with sound insulation noise can reach the number of decibels
Theoretically, the main factors influencing the sound insulation of the gypsum board wall are as follows: 1) the law of quality: there is a common law for the insulation of the partition, that is, the heavier the material (the greater the surface density) the better the sound insulation. For a single layer of dense uniform wall, surface density for each doubled, the sound insulation in the theoretical increase of 6dB, this law is the law of quality. For the double layer of gypsum board wall, the law of quality plays an important role, that is, to increase the number of layers or thickness of the board can be improved sound insulation. As the keel double wall system sound vibration form is very complex, so the embodiment of the law of quality than the simple single-wall complex. 2) Resonant frequency: any partition wall there is an inherent resonance frequency, when the sound wave frequency and wall resonance frequency, the wall as a whole resonate, the frequency of the sound insulation will be greatly reduced.
Q:To warm the above has been tiled, with light steel keel to build a wall, how to fix the keel?
With a lightweight partition, brick, and do not do gypsum board wall.
Q:Lightweight wallboard light steel keel how to construction
Wood keel installation to keel cross-sectional area and vertical and horizontal spacing should meet the design requirements, lightweight partition plate skeleton horizontal, vertical keel should be used to open half a tenon plus glue, plus nail connection. Before installing the panel, the keel should be fire-treated, the wall should be in accordance with the design requirements, along the ground, the wall top wall and the width of the wall line, the width of the wall should be consistent with the thickness of the wall should be clear, Accurate, the installation of vertical keel should be vertical, keel spacing should meet the design requirements.
Q:Gypsum board wall above the good paint glass?
Gypsum board partition wall construction operation process: (1) According to the design drawings, in the already done walls, floors, the ground release off the line, the door hole edge. (2) according to the design drawings and the actual size, with a wheel cutting machine cutting keel and classified stacking. (3) according to the line has been put away and the door edge, with nails or expansion bolts to the ground keel fixed on the ground floor, nail or expansion bolt spacing 600mm. The top of the keel into the wall of the reserved hole 100mm, and then use cement mortar packing fixed, or with nails, expansion bolts to the end of the handle along the top keel fixed to the wall. (4) According to the cut line and the edge of the door, according to the size of the file size layout, painted in the edge, along the top keel, less than the modulus should be placed in the partition with the wall at the first board. (5) According to the document mark will be cut in advance of the length of the vertical keel in turn inserted along the edge, along the top keel groove, the flange towards the direction of the proposed panel to be installed. Adjust the vertical, positioning accuracy, with rivets fixed. The vertical keel on the wall is fixed to the wall with a nail or expansion bolt, and the distance between the nail or the expansion bolt is 1m. (6) the installation of doors and windows to strengthen the installation of the keel: the first installation of the hole on both sides of the vertical reinforcement keel, and then install the hole up and down to strengthen the keel, and finally install the big hole on both sides of the upper and lower reinforcement keel and bracing. (7) Install the cross brace and support card. The vertical keel fastened, so that the entire partition keel has sufficient strength and stiffness.
Q:Light steel keel partition wall fire retardant coating shabu several surface
Brush when, in accordance with the requirements, at least need to brush twice. Although the Tai Po people in practice only brush it again, but suggest that you still brush twice for safety.
Q:What is the decoration of the wall? Lightweight bricks Or light steel keel frame?
Decorate the wood keel can be, and then use the integrated wall covered up on it. The other keels are too much trouble and time.
Q:Curved gypsum board wall technology.
Curved (sub-bumps) of the construction method: the first with the blockboard to make the first arc, in the right place with keel (wood keel, light steel keel can be) to shape the joinery board, and then gypsum board Attached to the blockboard and keel on the line. The following figure is the arc (concave) top of the grass-roots approach, curved wall practice with it the same.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords