Nylon cable Tie HS-810DL

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT or LC
Min Order Qty:
100bags bag
Supply Capability:
100000 bags/year bag/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Specifications of Nylon Cable Tie HS-810 

100PCS

HS-200D

8"

200

7.6

50

120

55

HS-250D

10"

250

7.6

63

120

55

HS-300D

11 5/8"

300

7.6

82

120

55

HS-350D

13 3/4"

350

7.6

90

120

55

HS-370D

14 1/2"

370

7.6

102

120

55

HS-400D

15 3/4"

400

7.6

105

120

55

HS-450D

17 3/4"

450

7.6

118

120

55

HS-500D

19 11/16"

500

7.6

150

120

55

HS-550D

21 11/16

550

7.6

160

120

55

HS-430DL

17 "

430

9

112

175

80

HS-550DL

21 11/16"

550

9

160

175

80

HS-650DL

25 9/16"

650

9

190

175

80

HS-760DL

30"

760

9

225

175

80

HS-810DL

32

810

9

239

175

80

HS-920DL

36 1/4"

920

9

265

175

80

HS-1168DL

46

1168

9

360

175

80

HS-550FL

21 11/16"

550

12.7

160

250

114

Packing of Nylon Cable Tie HS-810:

As Customer Request

Application fo Nylong Cable Tie HS-810:

Cable Package

  Nylon Cable Tie HS-650

 Nylon Cable Tie HS-650

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What is the difference between a kbg threading pipe and a PVC threading pipe?
May be charging head of the problem, the line may also be a problem. If the warranty can be free for the change.
Q:How to distinguish between power cables and electrical wiring on drawings
According to the control cable and the power of the different layers of laying, if the power cable to be multi-layer need to have 300mm spacing (or load capacity is large enough), if it is control cable, casually laying, if the laying of power cable laying below Layer, above the laying of control cable, but not too much affect the power cable cooling. If the high-voltage cable and low-voltage cable in principle do not allow common laying.
Q:The computer can not open the machine display frequency beyond the scope of the mouse and keyboard do not start can not press F8 how to do
According to the "Power Engineering Cable Design Code" GB-. 5.3.3 only asked for the depth of the cable buried directly: drop the blue skin to the ground depth, not less than 0.7 meters; when located in the roadway or farmland Under the appropriate should be deepened, and should not be less than 1.0 meters. 5.4.3 protected pipe buried in the ground, should meet the requirements under the depth of the pressure and environmental corrosion resistance. Through the uneven settlement of the backfill section and other places to increase the force, it is appropriate to use steel. Another direct burial should be selected armor type.
Q:Now the market professional installation monitoring the construction team how much money a point? , As well as cable patch panels and telephone patch panels how much money a point? Is it distance?
About 140 PVC threading tube, which depends on how many lines you row. PPR cold / hot water pipe 42 meters, PPR cold / hot water pipe with 4 m / root and 6 m / root of the points, short will make the joints more recommended to use long, generally longer expensive. Decoration in meters to count, to facilitate the settlement of labor, 42 meters is the amount of my home My house 115 square meters, indoor area of 98 square meters. I hope useful to you. According to the 2011 price, the general brand of wires and pipes, their own materials to buy, without artificial about 4000-5000 yuan. I decorated last year, the package to the decorating company hydropower workers with me to calculate the 9800 yuan it, of course, each region has a price difference.
Q:What is the cable for rvv? Is it a power cable or a control cable? What is the cable?
The installation process is a certain requirement, high and low voltage cable bridge should be installed separately as usual, a wall laying vertical pipeline (slot) or installation equipment, the power distribution between the depth of D1 = 1200 ~ 1500mm; weak Between the deep distance from the D2 = 1100 ~ 1400mm more reasonable. The length L1 and L2 between the power distribution and the weak can be determined according to how much electrical equipment and pipelines (slots) are installed in the room. "Civil building electrical design specifications" proposed "shaft size in addition to meet the wiring spacing and terminal box, distribution box layout must be the size, but also in the box before the left not less than 0.8m operation, maintenance distance" requirements. In the weak equipment, the operation and maintenance distance is not specified in the provisions of the Code for Electrical Design of Civil Buildings, but it should not be less than 0.8m. Cable to wear steel pipe wiring, should be reserved in the floor steel pipe, wiring should be completed after the plug fire fire blocking material. Cable bridge installation should be horizontal, the maximum sag should not be greater than 10 mm; proposed separate installation
Q:Cable YJV-3 * 70 + 2 * 35 general wear large SC tube? Ask you.
Charging line and the phone does not match, for the good point of the line just fine
Q:Seeking the basement of the outer wall piercing the cable after the casing, how to solve the water (200 points online)
To be considered is the Great Wall power line is not long enough, the power is not big enough to see the power on the label, if the 12V to 15A or more I think will be more stable, my Dell machine power cord surprisingly short, but also To buy the extension line again.
Q:Connect the computer to the TV. The The Using the HDMI cable. The The Line no problem. The Why not even after the audio video. The The Amplifier is Denon 1311
Make a mark, such as red set into the bottom for a color in a layer, or you can draw a few plans, water and electricity is a strong power is a weak and one, the label can do a good job
Q:What does the letter of the computer cable model mean?
Cable regardless of the definition of the number of elements in the definition of a few such as: YJV-3 * 50 + 1 * 16 calculated the number of lines is always a different, different wire rules Model input: bv-2 * 2.5 / bv-3 * 4 (different material), bv-2 * 2.5 + 3 * 4 (the same material)
Q:Is there a difference between PE cable and PE water supply pipe?
Labor costs you can and workers to discuss, and some labor costs are calculated in accordance with square meters, and some are calculated in accordance with the day, the specific or ask the local construction team
We are the professional manufacturer of cableholder. We always take a high quality concept as the core technology, insist on honesty, hard and serious work, and constantly improve our own strengths. By always putting the quality at the first place, we train a large number of professional personnel, to produce high-quality products and services

1. Manufacturer Overview

Location Shandong,China
Year Established 2001
Annual Output Value Above US$150 Million
Main Markets Mid East;Western Europe;North America,South Asia
Company Certifications ISO 9001:2008;

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port Qingdao
Export Percentage 90%
No.of Employees in Trade Department 30 People
Language Spoken: English;Chinese;
b)Factory Information  
Factory Size: Above 150,000 square meters
No. of Production Lines Above 5
Contract Manufacturing OEM Service Offered;Design Service Offered
Product Price Range Average