New Topkit Tower Crane TC 6010 China Mainland

Ref Price:
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 set
Supply Capability:
20 set/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Description of our Tower Crane

The tower crane is a combination of advanced technologies of the present day. The electric control system of the tower crane adopts the advanced “PLC + frequency converter” control mode of the present day, which has realized the stepless speed regulation and greatly improves the reliability, maneuverability and stability of the control system and the work efficiency of the tower crane.

The tower crane is equipped with all kinds of reliable safety devices, such as hoisting height limiter, slewing range limiter and multifunctional limiter to control the load moment, hoisting capacity and trolley traveling range. Its PLC (Programmable Logic Controller) unit can diagnose the cause of breakdowns. Its Safety Monitoring System (also known as Black Box) displays the data of working radiuses, heights, moments and weights.

The use of world-famous electric components such as OMRON, YASKAWA, Schneider (TE) and MEAN WELL greatly reduces the failure rate of the electric control system and improves the work efficiency of the users.

Besides, there are also electric safety devices like anemoscopes and obstacle lights and mechanical safety devices to prevent the breaking of trolley axles and wireropes. 

Advantage of our tower crane
1, boom relief Angle is big, greatly widened the equipment capacity and scope of work.
2, suitable for the group of tower cross homework.
3, boom stability is good, combination amplitude range.
4, suitable for height have special requirements occasions construction.
5, lifting capacity big, effectively solve the high steel structure construction team crane big lifting capacity requirements.

Specification of Tower Crane 

 Certificate

CE,ISO9001,Gost, 

lifting moment

1250KN.m

Biggest lifting weight

10t

Biggest working range/lifting weight

60m/1.6t

Smallest working range

2.5m

Hoisting height

Fixed form

50m

Attached form

161m

Hoisting system (planet differential type)

Hoisting speed/

 

Biggest lifting weight

Two falls

Four falls

m /min

t

m /min

t

3.6

5

1.85

10

12.5

5

5.78

10

40.2

5

20

10

53.6

2.5

26.3

5

80

2.5

40

5

slewing system

Slewing speed

0.6r/min

Trolley system

Trolley speed

25/51m/min

Jacking system

Rating jacking speed

0.5m/min

Lifting boom’s length/correspond balanced weight

60/15.7m/t

Crane total weight

53t

crane total power(not including the hoisting motor)

60kw

Mast section’s size (dimension)

1.8×1.8×3.0m

Section’s size of the lifting boom

1.356×1.00m

 

New Topkit Tower Crane TC 6010 China Mainland

New Topkit Tower Crane TC 6010 China Mainland

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How to install the jack up tower crane 30How to install the jack up tower crane?
1, since it is self lifting, as the name suggests, is to rely on their own strength, without other cranes can rise.2, it has a special elevated section, a hydraulic device, the upper section rises, the middle empty time section, with his arm to be added to the festival hanging near the artificial it fixed, so that a section of the rising of the.3 crane refers to a certain range of vertical lifting and horizontal moving heavy lifting machines. Also called crane. At present the Guangdong SHUNFA hoisting lifting equipment limited company has gradually cancelled lifting driving function. The main features are: the tyre crane driving cab and lifting control room, is be made one crawler crane (crawler crane) evolved, the walking tracks and walking mechanism to support part of the tire chassis, overcome the crawler crane (crane) damage caused by the defects of trackboard pavement, belongs to the material handling machinery. Lifting equipment is characterized by intermittent exercise to do some work, namely the corresponding mechanism, taking in a working cycle of transport and unloading action is the turn of the job, the crane in the market development and the use of more and more widely. Because no leg lifting and lifting driving often appear some accident, driving faster than the crawler crane (crane); stable operation, large lifting capacity, lifting, walking road, but must ensure smooth solid tire pressure to meet the requirements, hanging from the ground not more than 50CM in a certain range is prohibited; with a load of long distance. In order to ensure the safety of operation, the lifting operations are not allowed to be carried out at home.
Q:What is the definition of lifting, slewing and luffing of tower cranes?
Rotary is cantilever tower crane tower crane rotary shaft winding;Is the hook shaft distance amplitude change;
Q:How about the installation and disassembly of the tower cranes?
Authorized by the national security inspection department, the local special operations training school or the technical quality supervision bureau, after the study, assessment, qualification and graduation permit, will give you special operations installation, removal operation certificate.
Q:What role does the tower crane torque limiter play?
The torque limiter has two kinds of electronic type and mechanical type, electronic type: can show the torque, radius and load, near the tower crane permit torque, there will be a warning signal, although easy to use, the working conditions of cutting has been greatly affected, but not very reliable, easy to damage, the maintenance of trouble. Mechanical type: Although there is no display and can not alarm, but the work of the letter, the structure is simple, not easy to damage, suitable for construction site conditions.
Q:The special equipment specified by the state is a periodical inspection cycle, wherein the crane is carried out every many years
(two) small light lifting equipment, bridge crane, gantry crane, gantry crane, cable crane, crane mast, railway crane, jib crane, mechanical parking equipment every 2 years 1 times, the crane annual molten metal and hot metal 1.The rated load test, static load test and dynamic load test shall be carried out in the first test and the first periodic inspection, and the rated load test shall be carried out 1 times after each of the 1 inspection periods.The inspection process, the existence of major risks of hoisting machinery (such as special work environment, frequent accidents, etc.), inspection agencies approved by the provincial quality technical supervision department agree, can be appropriate to shorten the regular inspection period, but the short period of not less than 6 months.
Q:Tower crane demolition safety technical disclosure, how to write?
Baidu search:Tower crane removing and lowering joint safety technical disclosure.
Q:What is a TQ80 tower crane?
To put it simply, QTZ is updated than the TQ model, and the TQ series first appeared in 70s, and the QTZ series came out in the 80,90. Various parameters must be more advanced than TQ.
Q:Operation points of tower crane (tower crane)?
Safe use requires the use of tower crane, issued by the state competent authorities shall abide by the rules and regulations, but also comply with the relevant provisions in the manual: the crane working environment temperature is -20~40 degrees Celsius, the maximum working pressure is 205N/m2, when should stop using the winds of more than 6 level; the same construction site to install more than two sets of tower crane when should pay attention to the location of each tower, take the elevation of different operations, in order to avoid the tower crane jib, balance arm collision accidents; safety device of tower crane, luffing and slewing height, mass and moment limiter, the last two more important, if the two is not detected qualified, will be regarded as the unqualified, because it plays a role to ensure the safety and prevent the tilting of the tower crane. As a construction site, the tower crane torque limiter failure or to replace the operating personnel mistakenly believe that daily only hanging 800-1000kg materials, not what the risk, the results in a process of lifting materials, because of the construction site is narrow, hanging by the operator sight blocked, hanging objects hanging on building the steel frame, caused by tower crane shaking, was the occurrence of major accidents, thanks to the ground work riggers promptly notify the operator immediately stop to avoid rollover accident of tower crane appeared. It is obvious that all safety devices on the tower crane are essential and must be checked regularly to ensure that all the safety devices are in good condition, sensitive and reliable.
Q:How many meters does the tower crane installation height require expert proof?
The mounting height of the tower crane is determined by the manufacturer's manual,It has nothing to do with experts,After the tower crane is installed, it needs to go through the provincial construction quality and safety supervision station, and the designated testing institution will meet the technical requirements of the production plant, and the method can be used only after the use of the permit.
Q:How to fix the cable on the tower of QTZ125 type tower crane?
let the main cable and metal member completely separated, safety code for tower crane and tower crane installation, use and dismantling specification is not clear and specific practices, according to my experience, in accordance with the methods mentioned before can do check, usually meet the requirements.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range