New Drywall Partition Steel Perforated Profile/Metal Stud

Ref Price:
$0.50 - 1.80 / pc
Loading Port:
Tianjin
Payment Terms:
TT or LC
Min Order Qty:
10000 pc
Supply Capability:
300000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

 

- Raw materials : ZINC coating from 80 to 275 gram per square meter .

- Thickness : Form 0.50mm to 2.0mm .

- Dimension : Length : up to 11.85 M ,Width : From 40mm to 250mm and Hight from 30mm to 80mm .

 

Product Applications:

 

Product used for internal constructions gypsum drywall partition such as hotels, terminal building, bus station, theatres, shopping malls, factories, office buildings, and etc.

 

Product Advantages:

 

1.Light,good strength,cauterization resistance and water resistance

2.Matching magnesium fire-proof board,gypsum board and many other wall and ceiling board

3.Moisure-proof ,shock-resistant,high-effcient and environmentally-friendly

4.Easy and fast for installation,time-saving

5. Prompt delivery, high quality ,competitive price and complete sets of styles

6.We can supply you the products based on your specific requirements

 

Main Product Features:

(1) Lightweight  and high strength: 3-4 kg/m2 (1/10 of half brick wall), with yield strength 400mpa.

(2) Environment-friendly : galvanized steel-no radiation, have no harm to our health and not pollute the environment.

(3) Products with fillisters : Setting some fillisters in both sides of the keels in a selective way, in order to strength the keels' vertical points and intensity.

(4) The metal stud with hole : one of our product is the special hole on C-stud every 600mm,  which is easy for workers to install the electric lines and water tubes.

(5) Various sizes of metal track and metal stud : we are able to manufacture German, Japan and Aus-American types etc..We can meet your customized demands.

(6) Factory direct sale price : We have our own factory to produce raw materials----galvanized(zinc coated) steel, as well as the product line, so we can provide you a lowest price.

Product Specifications:

New  Drywall  Partition  Steel Perforated Profile/Metal Stud

 

Images:

 

 

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Light steel keel partition wall how to get, and how to purchase materials and tools, I now empty-handed, the best comprehensive ~!
Like your height of the wall, you can choose the C75 series of light steel keel, if you have to take into account the water seepage you can use waterproof gypsum board (face layer paper is green, ordinary is gray) As for the installation like home this Do not need to use the impact of drilling holes. Put a good, can be directly in the light steel keel in the ground to the keel skulls assembled to install in place, on the top of the keel placed woodworking plate, directly into the nail into the nail, of course, the gun was selected models of the same big. The side is also so fixed on the wall. The gypsum board is fixed on the light steel keel by self-tapping screws
Q:Light steel keel partition wall fire retardant coating shabu several surface
Grass-roots side of the wooden side need to brush four sides, the base liner is two sides, but the paste surface layer of decorative panels generally just brush a back, the front is usually not brush fire paint, or should be the quality of surface layer decorative plate paste.
Q:Light steel keel should be how to strengthen, in order to make solid wood door installed more prison?
Has been reinforced with wood, had not wanted to choose light steel keel is not considered too tight, not the reason for noise, but because these two bolt doors are not out from the original wall, decorating company recommended with light steel keel, So I did not insist, but there are 2 stack walls I insist they use brick
Q:100 light steel keel 9.5mm thick gypsum board double double-sided partition three times, three times latex paint.
Light steel keel a 3 meters, just the height of the wall is 3m, vertical wall keel is not a waste of material.
Q:Shanghai light steel keel ceiling, wall quotes
Not material money, the wall is generally single to 12 to 18 yuan per square meter, double 18 to 24 yuan per square meter. Ceiling 20 yuan per square meter
Q:Shanghai light steel keel ceiling wall how much labor costs?
Do not know how much of your area may be a little expensive point of the ceiling 10 yuan / square wall 80 / side less expensive to the point is not the same everywhere, roughly in the 20 to 25 or so labor price.
Q:Use light steel keel to do the shelf, install the glass partition wall, this process is feasible? How about construction?
Must want to do it. Recommended use of lacquered glass (keel must use heavy-duty installation of reliable), or white glass selection of aluminum keel. More reliable.
Q:Light steel keel gypsum board partition design should pay attention to what the problem
In order to be able to make decoration more perfect, it is recommended that you choose the decoration manufacturers, to be careful, we must choose the same brand of all products. The
Q:Gypsum board wall above the good paint glass?
You said it is necessary to nail fixed it, should not be installed, mainly afraid of bearing no, long-term bearing gypsum board may not stand, as far as I know gypsum board wall generally do not do curtains, No, I think you said the weight of the paint glass is not light, it should not work, not installed.
Q:How to remove the gypsum board cut off
Before the demolition, look at the original decoration construction drawings, or consult the owners, understand the distribution of water and electricity, wall decoration materials, cut off size and so on. If the partition inside there are hydropower, first the total valve or related valve closed to remove the partition. If the decoration materials are tiles and the like, pay attention to the ground to do protection, so as not to drop the ground tiles. To see whether the wall is anti-magnetic or wall whether there is sound insulation material, if any, must be done before the demolition of the relevant anti-magnetic or noise protection measures to avoid demolition later less than remedial loss. If the larger size of the partition is necessary, the first partition wall to do the guardrail, or playing keel, as a fixed wall, and then split.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range