New Design ID15 Scaffolding Accessories with Great Price

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1000 pc
Supply Capability:
1000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1.Structure of ID 15 Scaffolding Description:

ID 15 Scaffolding is designed for supporting the formwork system in construction,can be used to be tower,it is useful in UAE.

 

2.ID 15 Scaffolding advantages:

ID 15 Scaffolding adapts flexible to any wall geometry

Fast due to pre-assembled panels with built-in plywood

Strong with 80 kN fresh concrete pressure per m2 allowed

Economical due to longer service life and fewer parts

Hire option given in selected regions

Hot selling ID 15 Scaffolding with low price

 our scaffolding ID15 which is consists of base head,frame 133,frame 100,end frame,diagonal).

and it's compatible with  ID 15 perfectly.

 It's easy to erect and fit in your work compared with conventional method, saving you 20% working time .

ID 15 Scaffolding Quick Details

Place of Origin:  China (Mainland)

Brand Name: ID 15 Scaffolding

SCAFFOLDING: tower

 

Packaging & Delivery

Packaging Details:

iron packed

Delivery Detail:

upon receipt of 30% of deposite after confirmed the order

 

3.ID 15 Scaffolding Products pictures:

New Design ID15 Scaffolding Accessories with Great Price

 

4.ID 15 Scaffolding  Specification:

New Design ID15 Scaffolding Accessories with Great Price

5.FAQ of New Design ID15 Scaffolding Accessories with Great Price

  We have organized several common questions for our clients, may help you sincerely:

2How many Scaffolding your company have?

Here comes our 5 types of Scaffolding systems:

- Cup lock Scaffolding(C-Lock Scaffolding)

- Ring lock Scaffolding

-Kwistage Scaffolding

-H-frame Scaffolding

-ID15 Scaffolding Tower, this type Scaffolding is the most widely used in construction, such like bridge.

3How long can we receive the product after purchase?

Lead time is about 30days after getting the signed PI and deposit.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:by scaffolding ?
It's a rhetorical question, maybe the girl is held up so well that it could have been something else holding her up there
Q:Latch type disc scaffolding accessories is a national patent product
Disk lock scaffolding called socket type Pankou scaffold.
Q:Classification and erection of scaffolding and related specifications
2, scaffolding construction should be appropriate qualifications for safety in production permit in accordance with the construction of the scaffolding for the implementation of special case of Wu erection qualification prohibited the construction team to set up construction, 3 steel tubular scaffolding steel tube, fastener, wall fittings etc. shall be in accordance with the "construction of steel tubular scaffold Safety specifications" (JGJ130-2001) requirements and factory certification, inspection report inspection qualified components for 4 steel tubular scaffolding, scaffolding operations engineering supervisor should strengthen inspection found the construction according to the special case of the implementation of existing safety accidents should be in accordance with the relevant provisions of the written instructions and construction units ordered rectification or stop two, construction scaffolding technology standard 1 basic requirements, the pole base (base plate) a malleable cast iron manufacturing and welding base two erection scaffold Wooden plate paving base pole again put into the base plate in the bottom area of the calculation and should be less than 2 degrees, the thickness of 50mm to cross the wooden shim plate adopts steel plate 2, using plywood as cantilever scaffold cantilever beam layer cantilever scaffold with cantilever beam or cantilever frame with steel cantilever beam should be prohibited (I-beam, channel) made of cantilever frame made from steel tubes connected by the fastener 3, operation layer, protective railing railing ramps block baseboard shall be erected outside the pole inside; rail height should be 1200mm; the railing height should be 600mm; in 180mm4, the block foot height should be within the framework of closed scaffolding laying scaffold should be at least two layers. Operation layer protective layer operation layer protective layer of scaffold safety net fallback
Q:Bracket cast in situ beam bracket must use bowl buckle scaffold
No mandatory provisions.JGJ1622008 construction formwork safety technical specifications, is the latest specification
Q:A window washer weighing 700 N is standing on a scaffold supported by a vertical rope at each end. The scaffol?
The tension in the two vertical ropes must sum to 700N in order to balance the window washer. EDIT. In order to find the answer for each rope, I need to know how long the scaffold is and where the window washer is standing. EDIT. Taking moments about the end nearest to window washer. T1*3.044 = 298.6*1.522 + 700*1.51 ----> T1 = 496.54 N (2. d. p.) Taking moments about the other end. T2*3.044 = 298.6*1.522 + 700*1.534 ----> T2 = 502.06 N (2. d. p.) T1 + T2 = 496.54 + 502.06 = 998.6 = 700 + 298.6 as required.
Q:Mobile scaffolding accessories prices
! Mobile scaffolding is the main frame, cross frame, cross diagonal brace, foot board, adjustable base and other components
Q:Does a scaffolding piercing hurt?
Depends on your pain tolerance, it's different for everyone. But generally cartilage piercings feel nothing like getting piercings stretched.
Q:During what month does Hester mount the scaffold in The Scarlet Letter?
Read the book and find out! I think she's up on the scaffold sometime in spring, but as I said, READ it and make sure.
Q:In the calculation of the bearing capacity of the scaffold, what is the axial force produced by the "N g2k" - the standard value of the component?
Is to produce weight between each vertical rod scaffolding force
Q:How to set up the temporary structure of the external structure of the balcony on the two structure
Earthwork:The pile cap is shallow, the foundation beam and sand filling quantity is less, the depth is to the outdoor floor 1.5m, so the earthwork construction adopts the mechanical leveling site construction scheme. Backfill soil must be layered compaction, density of not less than 0.9. Construction lap should be compact, interval time should not be too long, in case of rain water, the construction of various types of pipe should be synchronized with the foundation construction.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range