Never run Product Name: Smooth HDPE Geomembrane

Ref Price:
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
1 m²
Supply Capability:
10000000 m²/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Smooth HDPE Geomembrane

Smooth HDPE earthwork film

Products overview:

Shandong Tianhai smooth HDPE geomembrane is the domestic and international and large petrochemical enterprise production quality, with three layers polyethylene resin co-extrusion blow molding technology and double co-extrusion rolling technology copolymerization and into. Is the industry and with only two craft production enterprises, the earthwork film industry on 20 years of experience, and civil party blow close cooperation, constantly and new, the pursue is perfect. The most reliable product to present customers. Performance characteristics of physical and mechanical performance is good, tensile strength, high deformation resistance, strong ability to wear thorn, anti-aging, uv resistance, oil and salt, acid and alkali resistance, corrosion resistance, high low temperature, non-toxic, long service life. Waterproof and drainage, seepage control, moistureproof effect of good, width, thickness specification complete, low cost, simple construction.

Product application :

1. The environmental protection, environmental sanitation (such as life landfill, sewage treatment plants, power plant regulation ponds industry, hospitals, solid waste, etc.)

2. Water conservancy (such as rivers and lakes reservoir dyke of seepage control, plugging, reinforcement, canal seepage control, the vertical wall slope protection, etc.), heart

3. Municipal engineering (the subway, building underground engineering, the cultivation of roof, roof garden of seepage control, sewage pipe lining, etc.)

4. Garden (artificial lake, the river reservoir, and the golf course pool of bottom line, slope protection, green lawn waterproofing and moisture-proof, etc.)

5. Petrochemical (chemical plant, oil refineries, gas station storage tank, chemical reaction pool, seepage prevention of lining etc) destabilize

6. Mining (washing pool, pool, heap leaching of ash field, dissolve pool, sediment basins, yard, tailings of bottom line of seepage control, etc.)

7. (highway traffic facilities of foundation reinforcement, the subway tunnels, the seepage control)

8. Agriculture (channel, guiding the canal, reservoir, drinking pond, the XuShuiTang, irrigation system of seepage control)

9. Aquaculture (intensive and factory YangShiChi, fish ponds, shrimp pond, sea cucumber circle of lining protection, etc.)

10. Salt saltworks crystallization, halogen (pool ShanGai pool, salt, salt pond Shan plastic membrane membrane)

The product specification wide:

2 m-8 m; Thickness of 0.3 mm to 3.0 mm:


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:what's the standard that geomembrane welding point's breaking strength should reach?
welding point strength is executed by GB/T16989 standard, the products standard of composite geo-membrane is GB/T17642-2008 .
Q:Does the geomembrane be used as an experiment?
Of course, the standard is GB / T-2008 "geosynthetics non-woven composite geomembrane" revision. This standard specifies the nonwovens composite geomembrane product classification, specifications, code, technical requirements and quality assessment, test methods, inspection rules, packaging, signs, storage and transportation. This standard applies to non-woven geotextile as the substrate, with polyethylene, polyvinyl chloride and other films, composite non-woven composite geomembrane. This standard is the GB / T-1998 made the following technical changes: - standard name changed to "geosynthetics non-woven composite geomembrane"; - product specifications from the unit area of ​​the quality to nominal breaking strength; - the product code is simplified from 7 parts to 5 parts; - the original standard in Table 1 and Table 2 for integration, fracture strength, tear strength, CBR burst strength indicators are specified specific indicators, and increase the file requirements ; - the elongation at break is changed to the standard strength corresponding to the elongation; - the width is changed to the reference index, the mass per unit area is no longer used as the assessment index; - simplifies the appearance inspection; - simplifies the packaging, standard.
Q:PDHE impermeable membrane in what season can not be built
No PDHE impermeable membrane, should be HDPE impermeable membrane. HDPE impermeable membrane laying construction climate requirements: 1 temperature 5-40 ℃ is appropriate, taking into account the geomembrane thermal expansion and contraction, according to experience, cold weather, the geomembrane laying should be tight; hot days should be relaxed; But should be noted that in the summer should avoid the high temperature at noon. 2 wind and rain: wind more than 4 or rain should stop construction; wind hours, it is appropriate to suppress the geomembrane sandbags to facilitate construction. Detailed information Telephone consultation Yin Yuming
Q:Architectural glass film benefits include:
1, insulation to reduce cooling costs: summer LLumar film can effectively block 79% of the sun's heat, greatly reducing the solar energy into the room, thereby reducing the cost of cooling the building. 2, thermal insulation to reduce heating costs in winter: the low-emissivity (LOW-E) film attached to the inner surface of the ordinary single glazing can reduce heat loss by 30%, reduce indoor heat loss, reduce winter heating costs.
Q:How to adhere film to the glass window?
You can find a lot of knowledge about film pasting on the Internet, but it is trivial and not very practical. Customers often ask me this question and I sum it up. 1. Cut the film well before film pasting. The film cut area is usually more than 1-2cm than the used area (supplies). For film pasting, water is first needed, and filtered water is the best. Add detergent (liquid detergent is ok, and 7 drops of liquid detergent should be added to a pot of water for the ordinary sprinkling can) into water to clean up the glass, especially its four corners. After cleaning it up, sprinkle the water with liquid detergent added onto the glass before film pasting to keep the glass moist and lubricated. 2. Tear off the release liner. Sprinkle the water with liquid detergent or lubricant added on the film while tearing off the release liner. Don't make the film stained with dirt, and then quickly attach the film to the glass and put it away in proportions. 3. Attach the release liner to the surface of the film to prevent the film from scratching when the film is scraped. 4. Use a soft scraper blade first to scrape the visible excess water. When wiping off water, you should do it in a certain order, and it is best to wipe off water from the center toward the parts around. 5. When the inside water is invisible, you can use a hard scraper blade to squeeze out all the inside moisture. 6. Tear off the release liner and cut off the excess film with a blade. 7. Wait until it is dried naturally and film pasting is completed.
Q:Soft film smallpox box film how to make?
Production: To use the acrylic boards, plastic sheeting, or other insulating material, i often take use of the double layer 2.5mm black aluminum plate. First, to carve the words you need with the single-sided adhesive paper. Then paste it on sided adhesive paper, and penetrate a drill or hole with the help of electric drill or carving machine(The pitch is according to the size of the word, the general interval is 10-15mm). !
Q:What is geocell
The geocellgeocell is formed by strengthening the HDPE sheet material, which is formed by the high strength welding, and the soil chamber is welded by ultrasonic needle. Because of the engineering needs, and some punch on the mebrane
Q:Which is better for geomembrane hot melting in the middle of sliding layer of high-speed railway bridge two cloth and one membrane, lapping or docking? And what is the lapping length if it is lapping hot melting?
In general, it should not be cut according to graphic size. Shorten joint length and strain as far as possible. After geomembrane pavement, the lap width between films should be not less than 10 cm. 4. Usually set at a corner and abnormal section. 6, arrange along the gradient direction and avoid accidental damage to membrane when the temperature is low. Lap width between membranes is generally not less than 10 cm. You should measure the accurate relative size. Do not weld as far as possible during geomembrane pavement . In addition to the special requirements, Do not walk on the membrane or carry on the membrane.
Q:What is the difference between single-sided laminated film and double-sided laminated film of paper cups?
Paper cups coated with single-sided laminated film are used to contain hot drinks while paper cups coated with double-sided laminated film contain cold drinks (condensated water caused by the cold drinks added with ice cubes will soften the cup). Milky tea can be held in paper cups coated with single-sided laminated film. The double-sided laminating paper cup has a layer of transparent film on its both sides and the cup is smooth.
Q:What is calculation method of constructional column concrete project quantity ?
The main difference is that you have to consider the concrete volume of stubble for constructional column, while for concrete column you don't have to. 1, calculation formula of concrete volume: Suppose sectional area of concrete column is S1, and height is H1, then the volume V1 = S1 × H1. 2, calculation formula of constructional column volume: Suppose sectional area of constructional column is S2, and height is H2, then the volume V2 = S2 H2 + N × (1/2 × D × K2 ×H2).

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range