Multifunctional Scaffolding System-Steel Guardrail CNBM

Ref Price:
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
20 m.t.
Supply Capability:
3000 m.t./month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1.Quick Details

  • Model Number: CRS-GR

  • Type: Scaffolding Parts, Folding and assembly

  • Scaffolding Part Type: Scaffolding guardrail

  • Material: Steel

  • Surface: Powder coated/ Galvanized

  • Colour: Yellow or ordered

  • Multifunctional Scaffolding System-Steel Guardrail CNBM

2.Packaging & Delivery

Packaging Details:pallet

3.Product Description

Model Name:  Scaffolding Screw Base Jack

Model No.: FAD BJ

Features:

1) Material: Q235 tube with screw nut

2) Specification: 300mm-3000mm

3) Type: hollow

3) Surface finish: painted, electro-

galvanized

4) Weight: 2kg-10kg

5) OEM services are provided.

 4.

Ring   Lock System Scaffold Standard / Verticals

Model

Description

Weight(kg)

Weight(lbs)

AR.S.3000

Ring Lock Standard 3000mm (9'10")

14.41

31.77

AR.S.2500

Ring Lock Standard 2500mm (8'2")

12.12

26.72

AR.S.2000

Ring Lock Standard 2000mm (6'6")

9.82

21.66

AR.S.1500

Ring Lock Standard 1500mm (4'11")

7.53

16.60

AR.S.1000

Ring Lock Standard 1000mm (3'3")

5.24

11.55

AR.S.500

Ring Lock Standard 500mm (1'8")

2.94

6.49

 

5.What is considerations of Scaffolding installation?

There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,

(1) scaffold frontage hurtful to prevent falling objects protection is required.

(2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What is the bamboo board for the scaffolding of the building?
Scaffolding, also known as scaffolding, in the scaffolding, the operating frame laying, to facilitate workers walking in the top, transport materials and construction operations of a temporary turnover of the use of building materials
Q:In the scarlet letter why is hester taken to the scaffold in the market-place?
This is where she is punished. People taunt her while she is standing up there. It is to make her feel shame.
Q:I would like to inquire cup lock system scaffolding, how much time per square meter and manpower to do the job?
It depend upon availability sorting of ledger to be used.If prop ledger has been transported sorted then three person can do 10 sqm in maximum 3/4 hour .i.e.0.075 h/sqm
Q:2 painters are standing on a 5.0 mg long scaffold. Each painter weighs 833 N.?
Summing torques at the left cable T2*5-833*2-285*2.5-833*4.5=0 T2=1225 N Summing torques at the right cable T1*5-833*3-285*2.5-833*.5=0 T1=726 N Check 833*2+285-(1225+726)=0 It checks j
Q:There is no shelter outside the scaffolding project has been accident accident case
I do not know what the problem you said is not clear, to send the following to you, for your reference: [Case 1] a single industrial plant project, eaves high 20m, construction area of ​​5800m2
Q:What kind of insulation materials and equipment are allowed to be imported in China?
One of China Polypropylene board (EPS board) or extruded board (XPS board), extruded board special interface agent
Q:Construction safety and quality control report for the depth of construction quality and construction safety production, to ensure the safety and use of structural features to prevent the fall, collapse, mechanical injuries and other multiple accidents,
How is offshore oil mining?The method of lifting the oil from the bottom of the hole to the ground by the energy of the reservoir itself or by the artificial supply
Q:Two window washers, Bob and Joe, are on a 3.00 m long, 380 N scaffold supported by two cables attached to its?
Oh, Ashley, you can't fit more than an intro in the what would you like to ask. More room in details.
Q:Will the concrete cloth machine and the tower crane is different, long quite like
Oh, that love what the lay it? Concrete is the end of the concrete pumping equipment, the role is to pump the concrete through the pipeline to be poured to pour (to say that the "building" is the word is also lay it, huh, huh) components within the template
Q:What is the most important safety hazard at the construction site?
2 Closed management some of the site door does not set the corporate logo to enter the construction site staff wearing a work card is not complete

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range