Multifunctional concrete trailer pump on sale

Ref Price:
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
500 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

 

Detailed Description

 concrete trailer pump includes different types to meet various needs. It is famous at the worldwide market for its high reliability and efficiency. 

 

1. The high quality hydraulic valves and oil pump use Germen REXROTH or Japan Kawasaki products.

2. The valve for change-over from high pressure to lower pressure is designed to be easily controlled, which can adjust the condition of the pump easily in accordance with the requirement of job site. Dismantle the tube is not necessary so that it can avoid the pollution.

3. Advanced hydraulic system which change direction hydraulically can run without electrical part.

4. Concrete piston can run back to washing tank, which can easily change the piston and be convenient for maintenance.

5. Tungsten steel glasses shaped plate and cutting ring guarantee long using life.

6. Hydraulic outriggers make easily positioning.

ModelUnitSP70.10.113D
Whole performance of pumpMax. theory concrete conveying capacity ( High pressure)m 3 /hr50
Max. concrete pumping pressurebar95
(High pressure)Mpa9.5
Theoretic maximum delivery distancemHorizontalVertical
498142
Main oil pumpml/r112
Distributing valve formApron valve
Main oil cylinder sizemmΦ100Xφ63x1400
(diameter X stroke)
Concrete cylinder sizemmΦ180x1400
(diameter X stroke)
Concrete hopperLX mm550x1300
(volume X charging height)
Outlet diametermmΦ160
PowerEnginePerkins(Model:1006-6T)
systemRated powerkW112
Rated speedr/min2200
HydraulicHydraulic oil way formOpen circuit
systemHydraulic pressureMpa32
Pressure of distributing systemMpa16
Pressure of mixing systemMpa14
Max mixing speedr/min37
Hydraulic oil tank volumeL350
OtherCooling way for hydraulic oilAir cooling or water cooling
dataMax. aggregate sizemmPebble 50,
Crushed stone 40
Outline dimensionmm4250x1600x1650
Total weightKg4360



 

 

  1. Training Solutions – we develop our people through high impact training. We increase the connective intelligence potential of individuals and teams through practical, solution-focused programs in areas such as innovation, team collaboration, management development, strategic thinking and decision making.

    2.Coaching Solutions - we increase leadership potential with performance coaching. We increase the connective intelligence potential of our managers and key contributors,    assessing and developing both their cognitive and emotional intelligence's (capabilities) as the latest research, and practical experience, indicates that both are needed to drive sustained performance.

    3.Reward Solutions – We reward our deserving people based on performance (we ensure equitable treatment of employees because appraisals are based on result of performance) by providing the necessary incentives. Its components can be a combination of bonuses, a range of appropriate benefits such as International trips, commissions and Stock option incentive plan for management & senior workers.

    Mission & Vision: The following Core Values fulfillment is our objective.

    1.Integrity and Professionalism.

    2.Target and Action Oriented.

    3.Service Quality & Customer Oriented.

    4.Pro- Active to change.

     

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Why concrete pump truck with foreign chassis
But in the pump the most important three components - chassis, pumps and boom, the domestic customers or manufacturers are still more inclined to use imported products.
Q:What is the maintenance method of concrete pump?
2) Before the operation should be checked to confirm the electrical equipment and instruments normal, the various parts of the switch button, the handle are in the correct position, the mechanical part of the fastening point of solid, reliable, chain and belt tightness to meet the requirements of the transmission parts of the normal operation.
Q:What is the cause of concrete pump blockage?
To identify the clogging site, with a mallet to plug the concrete mixture at the plug, and then through the concrete pump is anti-pump to eliminate the block.
Q:Winter concrete pump pipe Zeyang insulation Yeah?
Concrete winter preparation for the day when the minimum temperature below 0 ℃, should take the winter construction measures to prevent the construction of the construction work suffered frost damage
Q:What are the requirements of the concrete pump?
, Concrete pump or pump layout to place a place to have enough space to ensure that the concrete mixing truck feeding, shunting convenience.
Q:Why concrete pump down to play always block the tube
Second, encountered the material to be expected or the process of removal of the pipe, a long time do not charge the material, etc. every 5 minutes or so will reverse the pump a few times to prevent the concrete pipe.
Q:What is the difference between the concrete pump and the concrete pump?
The concrete pump is retrofitted on a truck chassis, which is equipped with a sports and powertrain, a pump and a stirrer, a cloth, and other auxiliary devices on the chassis. The power of the concrete pump through the power transfer box to the engine power transmission to the hydraulic pump or rear axle, hydraulic pump to promote the piston to drive
Q:How to prevent concrete pump blockage
Partial Leakage: Conveying Pipe Fitting Seal Fasten or replace the seal; shrink the profiled bolt to adjust the eyeglass and cut ring clearance; the piston is intact; the delivery cylinder is intact.
Q:How high concrete pouring concrete pump can be poured how high?
When the floor height exceeds the applicable height of the car pump, it will use the pump (fixed pump) to pour the concrete, the general height of the pump can reach more than 100 meters to 200 meters.
Q:What measures should be taken in the construction of the underground garage
The overall load should be considered, and the load distribution can be optimized by increasing the way of laying the subrack box, less reinforcement and strength of the roof, and reduce the cost

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range