Monkey Ladder 350*6000mm Q235 Carbon Steel for Scaffolding CNBM

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
50 m.t.
Supply Capability:
30000 m.t./month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

  • Quick Details of Monkey Ladder 350*6000mm Q235 Carbon Steel  for Scaffolding

  • Material :Q235/Q345 carbon steel

  • Surface treatment :Hot dip galvanized,Pre- galvanized

  • Main Components :steel with hook

  • Monkey Ladder 350*6000mm Q235 Carbon Steel  for Scaffolding CNBM

  • Monkey Ladder 350*6000mm Q235 Carbon Steel  for Scaffolding CNBM

  • Monkey Ladder 350*6000mm Q235 Carbon Steel  for Scaffolding CNBM

  • Descriptions of Monkey Ladder 350*6000mm Q235 Carbon Steel  for Scaffolding

  • Taking the method of CO2 shielding gas and galvanized surface treatment, Monkey Ladder services a long life with an excellent corrosion & rust prevention ability. The high safety and competitive quality its non-skid and low weight design brings make it widely used in many construction sites.

  • CO2 shielding gas technology product, anti-corrosion and rust.

  • Galvanized treatment design, cost control,ADTO's excellent independent research product.

  • Standard Monkey Ladder, an indispensable safe platform for construction work acceleration.

  • More stable with anti-skid design.

  • Lighter material, energy saving and environment friendly.


FAQ

  • 1. What is considerations of Scaffolding installation?

  • There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,

  • (1) scaffold frontage hurtful to prevent falling objects protection is required.

  • (2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator

  • 2.What are the certifications of your products?

  • Certified by SGS, BS1139, EN74, Local Test Report.

  • 3. How long is the warranty period for your product?

  • Our products warranty is 2 years.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How were scaffolds used in the 1800s?
Mostly the person would be taken onto the scaffold , a rope fixed around their neck, and then the trap door would open and they would drop through and choke to death , very rarely did the neck break in those days , so relatives and friends would pull on the legs , thus to speed up death. Earlier in history people were strung up from trees , and sometimes stood in the back of a cart which was driven away leaving them dangling. The platform on which the guillotine was stood was also called a scaffold at times. These executions were turned into social events and hundreds of people used to go to look.
Q:The construction scheme of high rise and external cantilever scaffold!
Quality standard for 3 foot hand frame fittings(1) steel pipe: steel pipe is generally used outside the 48mm, the wall thickness of 3.5mm steel welded pipe No. 3,The chemical composition and mechanical properties can meet the national standard "carbon structural steel" (GB / T700). The vertical rod, longitudinal rod (rod) tube length is 4~6m, horizontal bar (small bar) is generally 1.2.3m. steel pipe should be coated with anti rust paint.
Q:A window washer weighing 700 N is standing on a scaffold supported by a vertical rope at each end. The scaffol?
The tension in the two vertical ropes must sum to 700N in order to balance the window washer. EDIT. In order to find the answer for each rope, I need to know how long the scaffold is and where the window washer is standing. EDIT. Taking moments about the end nearest to window washer. T1*3.044 = 298.6*1.522 + 700*1.51 ----> T1 = 496.54 N (2. d. p.) Taking moments about the other end. T2*3.044 = 298.6*1.522 + 700*1.534 ----> T2 = 502.06 N (2. d. p.) T1 + T2 = 496.54 + 502.06 = 998.6 = 700 + 298.6 as required.
Q:examples of scaffolding?
As long as you're on the internet, why not just Google examples of scaffolding rather than expecting someone on YA to do your homework for you?
Q:Is it possible to use Boston Ivy as scaffolding for wisteria so one climbs up the other?
No, ivy isn't that strong. One can easily unzip it from the walls. Wisteria is way too heavy for ivy. Plus you have the root competition down below. Ivy creates an incredible dense mat of roots , little grows with it. Wisteria would have quite a battle on its hands for root space and nutrients.
Q:What are the requirements for the construction of the scaffolding structure?
The invention also provides an anchoring device for anchoring a scaffold structure to a building. Arm with longitudinal axis. The anchoring device further comprises an anchoring device which is fixed to the building by the anchoring device and the scaffold structure.
Q:Why won't the WWE hire Necro Butcher and New Jack to work scaffold matches with John Cena?
New Jack only likes to beat up fat guys (Vic Grimes) and old men (Gypsy Joe). I don't think he'd want to try messing with Cena lol
Q:How Long Will My Scaffolding/Industrial Piercing Take To Stop Being Sore?
It only really hurt for the first month-ish but was really tender for the first 3 months. After that, I barely noticed it was there. Goodluck :]
Q:What does scaffold one's days mean? kill time?
In 60 years of using English in Britain I have not come across that expression, so it is probably rare. Scaffolding is put up to help build or repair tall buildings, so possibly that expression means 'to do something useful with one's time.' But a scaffold is also, historically, a place of execution (legal killing of prisoner), so the expression could mean indeed 'wasting time'. I have a faint feeling that 'scaffold one's days' was written by a non-native speaker of British English. It may be more common in the USA.
Q:21M high full scaffold erection scheme
2 should be based on the results of the inspection to improve the construction organization design of the demolition of the order and measures, approved by the competent authorities before the implementation;3 removal of debris and ground barriers on the scaffold.4.2 removal of scaffolding, should meet the following requirements:

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range