Modular Sentry Box

Ref Price:
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
20000㎡ m²/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

This product belongs to Module System structure.

The structure load is mainly borned by SFLC board. It builds high efficient, energy saving and environmental house which integrates construction,water heating electricity and a set of construction equipment.

Advantages:

1. Flexible combination
2. Easy transportation
3. Fast construction
4. Cost saving
5. Removable & recycle

6. Thermal Insulation
7. Seismic and wind resistance
8. Roof Load-bearing

Packing:

light steel packing: light gauge steel in bulk, decorate panel material in pallet, other fittings all in boxes, loaded into 40' GP and 20' GP on container.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Can plastic wrap be steamed?
Of course not. Preservative film is a kind of plastic and will produce toxic substances after heating and melting. Remember not to put the preservative film into the pot or microwave and it is best not to steam preservative film with mcrowave. When you use the preservative film, remember not to let it contact with food, for the preservative film may volatilize and produce harmful substances when heated or in contact with oil. You should prevent the preservative film from contaminating food as much as possible. From a physical standpoint, the preservative film has moderate oxygen permeability and moisture permeability, and can adjust the oxygen content and moisture content of the fresh product around, and block dust in the air.
Q:What's the stick membrane methods of waterproof mobile?
Check your phone: Check whether the appearance of phone is damaged, power on, and check whether the phone is operating normally. Such as call, the phone volume buttons, play music, check the horn player ... and so if everything is normal. Registration Phone: before coating, register each phone model. 3 Cleaning Phone: before coating, you can use suction head to clean the dust in each gap, and clean the external phone with cleanser. drop the cleanser on the surface of phone, wipe the surface to clean, and clean the external parts Removing the back cover: the one that the rear cover can be removed, or must be removed, remove the SIM card, memory card, (Note: If the battery removed has serious eccentricity or too large gap, you can not remove the battery) Choose fixture: select the desired size in accordance to each phone's size,(check to ensure no gaps), the fixture can not be too tight so as not to crush the screen (note that the phone screen should be up), please notice all the keys on your phone, holes need to be avoided, can not be covered, avoid impacting the effect of coating, coating can be processed after finishing checking. launching switch: Press the start switch, lights up(as the figures in picture..), wait 3 seconds and machine starts to work, press OFF means to stop working, wait 3 seconds the machine starts to work, time of plating a mobile phone is about 3-4 minutes, the machine stops automatically after finishing coating, wait about 5 seconds air pressure drops, then open the sealed windows.
Q:Does geomembrane has to be experimented?
Q:What's the centrifugal glass wool?
Centrifugal glass wool is a kind of filiform material made by fibrillating and spraying thermosetting resin on the glass in melten state via centrifugal blowing process, which is then conducted thermosetting deep processing to make series products of a variety of uses. It has advantages like flame retardant, non-toxic, corrosion resistance, small unit weight, low heat conductivity coefficient, strong chemical stability, low moisture absorption rate, good hydrophobicity, etc., which is now recognized as the most superior material for heat conservation, thermal insulation and sound absorption with a very wide range of uses. The boards, carpets and pipes made of this material have been widely used for heat insulation and sound absorption in construction, chemical, electronics, electric power, metallurgy, energy, transportation and other areas, which have very significant effects.
Q:Does anyone clearly know about the construction technology of glass wool blanket, aluminum net and sound-absorbing wall?
1,4X20 wide aluminum mound layer, fixed with wood screws; 2, the layer of aluminum net; 3, fix the taut glass cloth on the surface of the keel; 4, stick 40 thick rock wool felt in the keel with construction adhesive ; 5 , 50X50X0.7 fix the light steel keel to the wall with expanded bolts, two-way medium range of 450-600; 6, polymer waterproof coating moisture barrier; 7, 8-10 thick 1: 0.5: 3 cement gypsum mortar layered leveling;
Q:How does the construction of the soft film ceiling?
1. First to go to the site to see if there is a condition of installing the keel: Look at the scene to make sure the wall is completed, and woodworking processing part is qualified, the area that need to be plastered should be completed first. First part plastering carpentry part we proposed must be in accordance with the requirements to do, to advance the processing of.2. entering the construction site conditions Licensor hole size lamp, air outlet, first part is fixed according to the design Aluminum Alloy keel keel carpentry requirements drawing well, attention must be right angle connecting to smooth, flat, dense.3. lamp holder, tuyere, light tube plate to and around the keel level, and firmly cannot swing can smooth.4. smoke, ceiling lamps, the first position to make a wooden frame, wooden frame the bottom surface should be polished, and pay attention to the level of height is too low, it is easy to show a trace of.5. before installing ceiling, carefully check the keel joints are solid and smooth, the spray head to stick on the white tape, an outlet should be well handled. When loading the smallpox to first from the middle to both sides of the fixed, while paying attention to size on both sides and pay attention to welding seam to the final straight angle position, pay attention to smooth. Around the well to the smallpox pruning removes. To perfect income effect on the edge. Turn on the light hole. To mark the position of the lamp hole , and carefully stick the PVC lamp ring carefully and accurately on the bottom of the soft film and then remove the excessive smallpox after it is firm. Find the position of the outlet and the light pipe handicap, just as the surroundings, to install the soft film to the aluminum alloy keel, pay attention to keep the angle be smooth.
Q:How to weld the geomembrane better?
When the temperature is below 5 degrees Celsius, construction should not begin in accordance with the requirements of the specification. If the construction must begin, the welding machine should be preheated before welding. 6 4 the welding line must be neat and beautiful, and there must be no slide welding and hopping. When the geomembrane is laid, telescopic deformation caused by temperature change should be reserved according to the varied range of local temperature and the properties of the geomembrane. 2 The joint of the geomembrane must not have oil as well as dust and the overlapping section of the geomembrane should not be have debris like sand and mud. The debris must be cleaned before welding. 12 the welding line of adjacent welding seam should be lapped staggerly. 9 Before the welding starts everyday, a sample of 0.9mm×0.3mm should be test welded on the scene. 5 13 When welding the geomembrane, electric generator of great voltage regulation performance should be used to supply power and voltage stabilizer must be used when using local electricity under special conditions.
Q:What materials are used in the upper layer of the protective layer of geomembrane? ? Why don't you use clay?
Compare to geotechnical cloth, clay has poor performance, so we use geotechnical cloth more as upper reaches of the protective layer.
Q:What's the necessary performance tests lass wool used for steel structure need to do?
Flame retardant and thermal insulation performance
Q:composite geo-membrane, two cloths and one membrane geomembrane 6 meters thick material how to use multiple sets of quotas
10 meters dam seepage-proof construction, 1000g composite membrane quotas are not accurate, depth 6 meters, each design Institute are not the same, two cloths one membrane composite membrane 800 grams per square meter is sufficient .

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Premium Related Products