Mobile Concrete Mixing Plant

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Mobile Concrete Mixing Plant

Main Technical Parameter of Mobile Concrete Mixing Plant
Model
YHZS50/60(3.8m)
YHZS75(3.8m)
Theoretical Productivity
60m3/h
75m3/h
Measuring Range
aggregate
3000kg±2%
3750kg±2%
cement
720kg±1%
900kg±1%
water
360kg±1%
450kg±1%
liquid additive
36kg±1%
45kg±1%
Total Power
About 85KW
(without optional parts)
About 105KW
(without optional parts)
Power Supply
380V/50HZ
380V/50HZ
Discharging height
3.8m
3.8m
Total weight
24t(without optional parts)
27t(without optional parts)
trailing speed
≤40km/h
≤40km/h
Dimension(L*W*H)
Service
17.7*3.6*8.2m
18.1*3.6*8.2m
Transportation
18.3*2.4*4.35m
18.6*2.4*4.35m

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Who is responsible for the construction of the pile foundation of the tower crane?
1, the pile foundation of the pile and tower crane foundation pile is not the same item, cannot pile foundation pile and tower crane foundation pile together to talk about.2, you did not say who is tower crane?. Who is responsible for the tower crane installation, including tower crane foundation construction.3, but, in fact, in most cases, the mechanical leasing company only provides technical requirements, providing tower crane foundation section. Piling and foundation concrete are the responsibility of the contractor.4, if the contract does not have a definite agreement on the construction of the tower crane foundation, the general contractor shall be responsible for the cost of piling the tower crane foundation. The piling Team can be the construction unit of the pile foundation, and also can be found by the general contractor.5, in the future tower crane foundation construction program should be clear about this matter, avoid controversy.These are only personal opinions.
Q:What is the insulation resistance of tower crane?
Three. Technical specification for temporary power safety on construction site JGJ 46-20055.4.2 within the construction site crane, derrick and Longmen machinery equipment, metal structure and steel scaffolding and under construction in construction projects, when lightning protection devices in adjacent buildings, structures and other facilities outside the protect zone of lightning arrester, lightning protection device should be installed in accordance with the provisions of.5.4.7 lightning protection electrical equipment machinery, connected to the PE line must repeat grounding at the same time, with a repeat of the mechanical and electrical equipment grounding and lightning protection grounding machines can share the same grounding body, but should be consistent with the repeated grounding resistance of grounding resistance requirements.The electrical equipment of 9.2.1 tower crane shall comply with the requirements of the current national standard "safety regulations for tower cranes" GB5144.9.2.2 tower cranes shall be subjected to repeated earthing and lightning protection grounding as specified in Clause 5.4.7 of this code. The earthing device of the track type tower crane shall comply with the following requirements:L the two ends of the rail are respectively provided with a grounding device;The joint of the 2 track is electrically connected, and the ends of the two tracks are electrically connected in the loop;3 long track every is not more than 30m and a grounding device.
Q:How often should the crane be inspected regularly?
Crane safety supervision regulations twenty-fourth in lifting machinery safety regular supervision and inspection cycle for two years, elevator and manned elevator safety regular supervision, inspection cycle for a year.Eighteenth lifting machines should check the lifting machines regularly, including annual inspection, monthly inspection and daily inspection:I. at least one full inspection shall be carried out annually on the lifting machinery used.The load test can be carried out by lifting the heavy load which is equivalent to the lifting weight, and checking the safety performance of the mechanism such as lifting, running, turning and amplitude according to the rated speed.Lifting machines which have not been used for more than one year should be examined comprehensively before use.Crane in case of four or more earthquakes or major equipment accidents, outdoor work crane after more than nine winds, should be used before a comprehensive inspection.
Q:What should be included in the disassembly plan of the tower crane?
- 1 -Contents and requirements of special construction plan for tower crane installation1. General situation of Engineering; 2, installation location and elevation plane3. The type, performance and technical parameters of the tower crane selected4,; foundation and attachment device set(1)The foundation of tower crane and the bearing capacity of its foundation shall comply with the product specificationRequirements for books and design drawings. Before installation, the foundation shall be checked and accepted before installation. There should be drainage facilities around the foundation.(2)Attached tower crane is used, the attachment device and set freeThe end height shall comply with the requirements of the product manual. When adhering to a horizontal distance or attachmentThe design calculation and drawing system should be carried out when the spacing is not satisfied with the requirements of the product specificationDrawing and writing relevant instructions shall be examined and approved by the technical leaders of the enterprise or through the originalManufacturer confirmation. Attachment device and component shall be the original manufacturer or by embedded partsEnterprise with corresponding ability to make. Attachment device design, the main structure of the building to support the checking.5, climbing conditions and adhesion node detail;The foundation, anchor and climbing support structure of an internal climbing tower crane shall be used as the foundationAccording to the product manual to provide the design calculation, and the internal climbing tower crane bearing structure checking.6, the main components of the weight lifting and installation position.7, the installation of auxiliary equipment; the type, performance and arrangement position.8. Rigging and special tools9, set the power supply;10, the construction personnel configuration;
Q:What is the difference between crawler crane and tower crane?
There are many differencesThe crawler is used to transport items in a smaller range of motion (site)A tower, used for construction, stationary, or maneuvering along a railroad track.Crawler can easily reach the magnitude of 50 tons or moreMore than ten tons of tower are relatively commonTrack internal combustion engine, hydraulicTower type general power consumptionWait, wait......
Q:How to calculate the pouring and maintenance of tower crane concrete in valuation?
Fixed price can be fixed. According to the design of construction organization. For a fixed item, reflected in engineering construction scheme.List price of the project, the quotation, measures, fees, quotations.
Q:How many motors does the ZOOMLION TC6013A-6 tower crane use?
Model: YZRDW225M-4/8 power: 24/24KW speed: 1420/725r/minDirect search {ZOOMLION QTZ80 (tc6013) _ crane Manual Part 1 (Part Two)}, can also be found.
Q:What is the brand of ZOOMLION tower crane?
How big is the lift? It depends on the size of the motor you use. 24KW motor, the choice is about 100A. 30KW uses 125-150A, 55KW, and 150-180A;Generally 40A contactor is used for turningCar selection of 25A on it.
Q:What is the inspection certificate for tower cranes?
Inspection certificate of tower crane must have two certificates:1, the manufacturer issued its own "product quality certificate"2. The product quality supervision and inspection certificate issued by the Technical Supervision Bureau
Q:What are the main parameters of a tower crane?
Generally speaking, the main parameters of the tower crane are:Maximum amplitude unit MMaximum lifting height, unit MMaximum lifting torque unit KN.mMaximum lifting speed unit m/minMaximum lifting unit tRotational speed unit r/minVariable speed unit m/min or o/minWalking speed per unit m/minMotor power unit w......Please refer to the product manual.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range