Mobile concrete mixing plant Concrete Batching Plant 75 cubic meter per hour

Ref Price:
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
1 set
Supply Capability:
50 set/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:


  •   YHZS75 Mobile Concrete Mixing Plant Constitution

  • Quick Details

    Packaging & Delivery

    Packaging Details:3*40HQS
    Delivery Detail:45 working days after receiving the down payment

    Specifications

    1.CE,ISO9001 
    2.Compact structure and all ready functions 
    3.convenient movement 
    4.quick installation 

    • Condition: New

    • Place of Origin: Shandong, China (Mainland)

    • Model Number: YHZS75

    • Theoretical productivity: 75 cubic meter per hour



  • This series of mixing plant adopts the semi-pulling structure with running system and standard coupling pin included.It can be dragged by a tractor. Without foundation and commissioning enables convenient movement and quick installation. It only takes one day from installation to use.To be convenient for long distance transportation,the mixing plant can be divided into several standard modules,and then be packed into containers. It has been applied for the National Invention Patent and has been accepted. The application no.is 200810172273.9

         

    No.

    Parts name

    Constitute item

    Qty.

    1

    Aggregate Batching System

    (two hoppers accumulate weighing)

    PLD2400

    1

    Weighing hopper

    1

    Belt machine B650×10800

    1

    Motorized pulley YBT4-1.6-320*650

    1

    Storage hopper 8m3

    2

    Sensor TSB-2000

    4

    Framework

    1

    2

    Running System

    Axles

    2

    Wheel 8.0-20

    8

    Tire 10.00-R20

    8

    Plate spring

    4

    Adjustable legsZD/ZL20t

    1

    Towing pin QF50A-A

    1

    Two axles suspension

    2

    Brake air-cell

    4

    3

    Belt Conveyor

    herringbone tape B=800mm

    1

    Motorized pulley

    YBN11-1.6-500×800

    1

    Framework

    1

    4

    Control Room

    2.3m*2.3mControl room

    1

    Chair

    1

    5

    Additive System

    Additive delivery pipe

    2

    Pipeline accessories

    2

    Storage silo

    2

    Water pump IHG32-125

    2

    6

    Mixer

    JS1000

    1

    Mixer cover

    1

    Gearing

    2

    Gear reducer

    2

    Motor P=30kw

    2

    Mixing device

    1

    Mixing trough

    1

    Discharging system

    1

    7

    Weighing System

    Cement weighing scale

    1

    Butterfly valve BV1F250S

    2

    Cylinder

    2

    Sensor SBS-0.5

    3

    Water weighing scale

    1

    Sensor SBS -0.5

    3

    Additive weighing scale

    1

    Butterfly valve DN50

    1

    Sensor MTB-100

    1

    8

    Water supply system

    Water pump ISW50-100(I)

    1

    Water pump ISW65-100(I)

    1

    Pipeline accessories

    1

    9

    Pneumatic control system

    Pneumatic elements

    1

    Air compressor PE100250

    1

    Triplet

    1

    Pipeline, coupling and fixed parts

    1

    10

    Electric control system

    Console

    1

    High voltage cabinet

    1

    Industrial control computer

    1

    Concrete production control software

    1

    Electric elements


    17″LCD

    1

    Printer

    1

    UPS

    1

    Wire, cable

    1

    Console

    1

    High voltage cabinet

    1

    11

    Main Framework

    Framework

    1

    Holding hopper

    1

    Ladder

    1

    Legs

    3

    Inclined strut

    2

    Guardrail

    5

    Platform

    3

     


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How to choose a good concrete mixer station?
The concrete mixing station of choose and buy should focus on quality and quantity. Some users choose and buy when the concrete mixing station, don't know how should choose the equipment, now there are goods on the market of concrete mixing station, concrete mixing station, concrete mixing station. Users should choose different devices and different type of concrete mixing stations according to their own situation.
Q:What does HZS mean in the HZS120 concrete mixing station
Because building aggregate measurement compared with standing aggregate metering, reduced the four of the intermediate links, and the vertical blanking metering, saved measuring time, thus greatly improving the production efficiency, under the condition of the same model, mixing building production efficiency than mixing plant production efficiency by a third. Such as: HLS90 floor of production efficiency and production efficiency of HZS120 stand HLS120 floor of production efficiency, production efficiency is equivalent to HZS180 stand HLS180 floor of the production efficiency is equivalent to the productivity of HZS240 station.
Q:Cement warehouse introduction, storage reserves?
There's nothing to come, but warm and young About 200 tons
Q:What are the facilities of the concrete mixing station
It can be divided into five large parts of the mixing host, material weighing system, material conveying system, material storage system and control system
Q:The average commodity concrete is mixed with a day to use how much fly ash
What is the amount of cement in the concrete mixing station? This is based on the different levels of the concrete mix. Here is a different grade of concrete ingredients: Note: 1. The mix of concrete and concrete shall be carried out in uniform ratio of gravel and slump. In one project, the C40 is mixed with ordinary cement, and according to the proportion design, the maximum amount of coal ash can replace 40% of the cement consumption.
Q:What chemical materials are used in the concrete mixing station?
Start with the glue: cement, coal ash, mineral powder, and various expansions! Sand: natural sand, mineral sand, fine sand; Stone: 5-10, 5-20 water reducer! And tap water
Q:What constitutes the js750 concrete mixing station
Host one, silo (usually four kinds of material), a set of mainframes, three to four storage tanks (with a cage), and an air compressor, which is usually the case
Q:What is the difference between a concrete mixer and a concrete mixer
The simple point is: the bones of the mixing tower are on top, and the bone is measured directly into the blender. The bone material of the stirring station is below, and the bone material is measured and then transported into the blender after the slanting belt. In a popular way, it is called the building, which is called the second ascent. Higher initial investment mixing floor production line 400000 station, because of mixing building bin above, therefore the steel structure will be bigger, inclined belt will be relatively longer. But in productivity, the churn is about 20 per cent more productive. In the operation, the energy consumption and the failure rate will increase due to the frequent start of the inclined belt of the mixing station, while the mixing building will be relatively low. Of course, in appearance, the mixing building is a bit more imposing than a mixer-stand, which can sometimes have an unexpected effect on the business. In addition, there are some technology mixing buildings that can be used, and the mixing stations can't be used, because the equipment is different. It's worth noting that the difference between the initial and the mixing stations is not absolute.
Q:Concrete mixstations belong to no special equipment
The boiler is a special equipment in the stirring station.
Q:How long does it take to build a concrete mixer station?
Normally, between one and three weeks. Plan the main points of the stirring station Venue: single 2m3, 3m3, the equipment occupies an area of about 21mx51m. Add in the yard, parking lot, road, office building, repair shop, recycling pool and so on, usually need the site 40mx80m (the land of 5 acres). 2m3 and 3m3 stations usually require 60mx80m (7.5 acres). If the location is more complex, the layout of the equipment should be based on the utilization of the site. To reduce the cost of future operations, it is suggested that there be a river at the edge of the site so that it can be used to carry sand stones. Distance should consider the best range of concrete delivery vehicles, not too far away from the main site, but also for future development. Optional: choose according to the expected amount of concrete. In a year of 300 working days, eight hours a day, the actual efficiency is lower than the nominal value given the various factors that are affected. Considering the requirement of the equipment for regular maintenance and maintenance, and the requirement of the high demand in some period, it is suggested that the equipment should be purchased. In some areas, the construction of new concrete and concrete stations must be at least two.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range