MITSUBISHI Escalator Handrail Plastic Guide Rail

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT or LC
Min Order Qty:
1 Piece pc
Supply Capability:
10000 Pieces per Week pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Quick details

Packaging & Delivery

Packaging Details: Export standard package. The goods will put into box and boxes put on the pallet.

Delivery Detail:10days after the order confirmed

 

Schindler  Escalator parts.

High quality Schindler Escalator/Elevator parts for your reference.

We can supply all Schindler Escalator/Elevator parts for your installtion or maintenance.

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How many types of elevator its basic functions, the basic decorative configuration, matching features are those?
Basic functions: overhaul operation, overload alarm, overspeed protection, double safety touch board protection, no call back to base station, walkie-talkie communication system, no call 3 minutes lighting and fan automatically stop, self-help operation, door closed door protection, Automatic adjustment, fault self-test storage display, power failure emergency lighting, electronic newspaper station clock, run the number of transmission, fire operation, the driver function
Q:What are the electrical parts of the elevator and what are their roles?
The control system (including the main board, car plate, instruction board, layer display board) is responsible for the elevator start, run and stop. Flat sensor: elevator leveling detection switch; door machine system (including door and door machine frequency converter): responsible for the elevator door. 2, safety touch panel and light curtain: car door entrance security protection; 3, limit switch: forced elevator stop of the terminal switch (in the bottom and the top of the set), the safety of the system, 4, the buffer: the roof of the elevator and the end of the end of a protection switch. Drag the system: traction machine, inverter, etc. to provide elevator running power;
Q:What are the general items of a construction project
Appendix B Construction Division (sub-division) project, sub-project division B.0.1 Construction Division (sub-division) project, sub-project can be divided according to Table B.0.1Appendix B Construction Division (sub-division) project, sub-project division B.0.1 Construction Division (sub-division) project, sub-project can be divided according to Table B.0.1...
Q:Hitachi Elevator out of 61 with 93110 fault door door lock after the opening of the arrow outside the instructions flash how to repair
My idea, you should look at the motherboard on those who help the rafts of the river, the number of lights, which should be working properly but did not light up to determine the cause of the malfunction to find the cause of the fault and then Discharge, I only compare the new motherboard when the line, as you said this problem if it is not a safe circuit and the door of the security problem, it should be the issue of the vessel recommended you to measure the external call power supply voltage (all Flash), there is a possibility that there is a short circuit of the external call board, and I have encountered such a situation. The other is gone
Q:You brother ah, sister who can give me a complete waterproof construction program
Now do underground waterproof! Collection of waterproof material certification, inspection reports. Do the material to carry out inspection and supervision of waterproof materials on-site sampling, sent to the building materials test bench review. 3, do waterproof part of the inspection lot. 4, do waterproof hidden inspection recordsNow do underground waterproof! Collection of waterproof material certification, inspection reports. Do the material to carry out inspection and supervision of waterproof materials on-site sampling, sent to the building materials test bench review. 3, do waterproof part of the inspection lot. 4, do waterproof hidden inspection records...
Q:Inside the restaurant such as the kitchen in the 1L and then the food to the top of the restaurant inside a machine called what name?
Broiler lift, lift ladder or brook ladder. The definition of the passer ladder, pass the elevator is the use of debris elevator interpretation of the use of the provisions of the provisions of the General Administration of Quality Supervision, Inspection and Quarantine of the product for the debris elevator for hotels, hotels, restaurants, hospitals, Troops, schools, kindergartens and other kitchen interior, because of its use for the upstairs downstairs transmission dishes, so people call the "passer ladder" "broiler elevator." The type of escort ladder, brook elevator is generally divided into two kinds of horizon and window type, can provide fast, convenient, economical small cargo transport, for users to save time and human resources. (1) electric lock function: a layer of call box equipped with electric locks, for the temporary start and close the elevator control system; (2) delay protection: when the normal running time, the elevator automatically stop running (3) fault self-display function: when the elevator is faulty, the fault will be diagnosed after the code in the form of digital display in the control cabinet; (4) fault self-diagnostic function: when the elevator (5) self-recovery insurance function: control signal loop if the short-circuit insurance automatically disconnect, when the failure to eliminate the insurance automatically connected; (6) contactor stickers to keep regular light (such as the existence of a fault, can diagnose the phenomenon and cause of failure; (7) call response function: press the call button, the call layer button to be activated (if the contact button is not broken, Digital indicator light, after the station to cancel the memory indicator off; (8) beep prompt function: with a station beep prompt function;
Q:In the airport shopping mall and other public places up and down the stairs or escalators should rely on what to stand?
Stand on the right side
Q:What are the contents of the elevator maintenance?
Lubricants, door machines, light curtains, wire and cable, screw reinforcement. Voltage, etc., but also includes the well machine room cleaning
Q:Under the advice of the hippocampus to the three generations of engines for what kind of oil? 10W-30 or 5W-30.
Or recommend the use of good oil, although you said the economic car do not use so good oil. But in fact the individual is not the same good oil first good performance, clean ability, reduce sludge carbon deposition, the engine protection will be better, and the whole synthetic oil, then the general is about 8000 for a change, the ordinary oil on 5000 or so, in fact, Count down the words, but also how much money! Like me, now with the ERG full synthetic cramps forged forging the feat boxing hides the oil, it is also good, cost is also high, or more recommended! Castrol's guard is also good, but the premise to ensure that genuine. Or to buy fake oil on the trouble!
Q:What steps and steps are required to be reused after the construction of the elevator overhaul?
Elevator overhaul formalities; first reported to the local special inspection hospital, to be approved after the overhaul, overhaul units have a large valve, such as the replacement of accessories or changes to the procedures. And then need to test the local special inspection again before the normal use.
Our mission is to provide the BEST elevator and escalator spare parts in the world by dedicating our resources. Sincerely welcome both domestic and foreign friends to join hands with us and create a brilliant future together. You can send us inquiry at any time and we will response promptly to all your requests within 24 hours, offering satisfactory services.

1. Manufacturer Overview

Location Jiangsu,China (Mainland)
Year Established 2006
Annual Output Value US$50 Million - US$100 Million
Main Markets North America; South America; Eastern Europe; Southeast Asia; Africa; Oceania; Mid East; Eastern Asia; Western Europe; Central America; Northern Europe; Southern Europe; South Asia; Domestic Market
Company Certifications ISO Certificate

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port Taicang PORT,Shanghhai PORT
Export Percentage 41% - 50%
No.of Employees in Trade Department 6-10 People
Language Spoken: English, Chinese
b)Factory Information  
Factory Size: 5,000-10,000 square meters
No. of Production Lines 3
Contract Manufacturing OEM Service Offered Buyer Label Offered
Product Price Range Low and/or Average