Mini Construction Hoist /Material Hoist /Building Hoist /Industrial Hoist /Lift /Elevator

Ref Price:
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 set
Supply Capability:
20 set/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Introduction:

Our SC Construction Hoist is an industrial engineering elevator driven with pinion and rack, used for vertical transportation of materials, people and other heavy items, applicable to highrise building construction, storehouse, port, dock, tower, chimney and so on.

 

Features:

The mini building hoist is a minor vertical transportation machine. It is designed on the basis of Mesh Driving Principle of Pinion and Rack and mainly applied in industrial and civil construction, for tower crane, harbor machinery, power transmission tower, bridge, television tower, chimney, boiler, tunnel and so on, to transport people and materials.


Specifications:

Remark:

1. Recommended cage dimension (LXWXH) (m): 1.0X0.75X2.2, 1.5X1.0X2.2 etc, we can also manufacture cages of other size according to the user.

2. The cage and the door material can be aluminum molded board, punched-plate, figured aluminum board or other type according to your requirements.

3. The mast and the tie-in surface can adopt paint-spray, or hot galvanizeing processing.


Mini Construction Hoist /Material Hoist /Building Hoist /Industrial Hoist /Lift /Elevator



Mini Construction Hoist /Material Hoist /Building Hoist /Industrial Hoist /Lift /Elevator

Mini Construction Hoist /Material Hoist /Building Hoist /Industrial Hoist /Lift /Elevator

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:The elevator is banned from using elevators for more than a class of high winds
More than 6 levels of wind are forbidden to be removed and used. More than 4 levels of wind are not allowed to rise, and more than 6 winds are prohibited.
Q:The working principle of construction elevator
How the elevator works: The main bearing structure is self-formed system, which is low on construction. It more driven by force, drive devices are installed on the hanging basket, through the gear and rack drive system, the mutual cooperation, so as to realize the rise and fall of the elevator.
Q:How does the construction lift fall without electricity
The lockers are finished with the report, unless there is a problem
Q:How large a leakage protector is used for the construction elevator
A leakage switch with a rated current of 100-160a. The rated action current of the second class is 50-75hm. The rated action current is 30-45hm. The action time is less than or equal to 0.1 s. Comply with safety specification according to this construction.
Q:How does the construction elevator add up
You can use a ready-made high-altitude operating platform and a high-altitude working platform
Q:How does the driver of the construction elevator do the search for a sudden power failure
When the elevator is running in an abnormal condition, it should stop immediately and take effective measures to bring the ladders down to the ground floor. When the electric is out of control in operation, the stop button should be pressed immediately. The stop button is not allowed until the failure is ruled out.
Q:What are the requirements for the construction elevator
So for safety device factory test is very strict, before delivery by the statutory inspection unit for torque measurement, critical speed measurement, measuring the amount of spring compression, each with the test report, after assembly to the construction lifter for drop test under rated load, and the site to use the elevator must be every three months to conduct a drop test. For safety device to the factory for two years for safety device (delivery date), must also be sent to the statutory inspection unit to carry on the test, after testing once a year.
Q:What is the need for the sc200/200 construction elevator cable?
General is 3 times 16 + 2 * 6, want to know can seek professional construction lift machine cable market manufacturer ask
Q:The staff on the construction platform shall not exceed the number of people
There is no specific specification that should be more platform-specific
Q:6 layer of brick and concrete construction project, have tower crane still need construction elevator?
Very cow! Six floors of brick and concrete construction projects have tower cranes. No construction lifts are needed.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port