• Metallurgical Coke of  coke   Breeze  0-5MM System 1
  • Metallurgical Coke of  coke   Breeze  0-5MM System 2
  • Metallurgical Coke of  coke   Breeze  0-5MM System 3
  • Metallurgical Coke of  coke   Breeze  0-5MM System 4
Metallurgical Coke of  coke   Breeze  0-5MM

Metallurgical Coke of coke Breeze 0-5MM

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1000 m.t.
Supply Capability:
1000000 m.t./month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing


1. Structure of Metallurgical Coke of   coke   Breeze  0-5MM Description:

Coke is made by high temperature metallurgical coke for blast furnace smelting, casting and gasification. Occurring in the process of coking after recovery and purification of coke oven gas is a high calorific value of fuel, is an important industrial raw material in organic synthesis.

Coke is mainly used for blast furnace ironmaking and used for copper, lead, zinc, titanium, antimony, mercury and other non-ferrous metal smelting of blast furnace, reducing agent, compound and the function of stock column frame. 

Blast furnace with Coke instead of charcoal, which laid a foundation for the large-scale of modern blast furnace, is a major milestone in the history of metallurgy.

2. Main Features of the Metallurgical Coke of   coke   Breeze  0-5MM:

• Quality assurance

• Mutual benefit

• Preferential price

3. Metallurgical Coke of   coke   Breeze  0-5MM Images:

 

Metallurgical Coke of  coke   Breeze  0-5MM

Metallurgical Coke of  coke   Breeze  0-5MM

Metallurgical Coke of  coke   Breeze  0-5MM

Metallurgical Coke of  coke   Breeze  0-5MM


4. Metallurgical Coke of   coke   Breeze  0-5MM Specification:

Parameters

Guarantee

Moisture (ARB)

5% max

Ash (DB)

12.50% max

Volatile Matter (DB)

1.4% max

Sulphur (DB)

0.7% max

Phosphorus (DB)

0.035% max

CSR

60% min

CRI

28% max

M40

82% min

M10

8% max

Size 30-90 mm

90% min

+90 mm

5% max

-30mm

5% max

Mean Size

52 mm

5. FAQ

We have organized several common questions for our clients,may help you sincerely:

1) How to guarantee the quality of the products?

We have established the international advanced quality management system,every link from raw material to final product we have strict quality test;We resolutely put an end to unqualified products flowing into the market. At the same time, we will provide necessary follow-up service assurance.

2) What are coke's main physical properties?

The average heat capacity is 0.808 kj/(KGK) (100 ), 1.465 kj/(KGK) (1000 )

Thermal conductivity is 2.64 kj/(MHK) (room temperature), 6.91 kj/(MHK) (900 );

Ignition temperature (air) is 450-650 ℃.

3) How about your company?

Our company began to export coke when China cancelled 40% of coke export tariffs and quotas on January 1, 2013. We export many kinds of coke, such as CSR60 % and CSR 62% metallurgical coke (met coke), the NUT coke of 20 to 50 mmcoke breeze of 3 to 6 mm, and so on.


Q:What is the difference between coking plant and coke plant
Never heard of coke plant, coking plant is the production of coke products, there are other chemical products, it is estimated that you said the coke plant is the purchase of other people's desire to sell second-hand coke traders.
Q:I don't understand. With coke, then the rest of the coke, they are selling it?
According to the use of coal can be divided into: injection coal, coal, coal coking coal can be divided into: lean coal, coking coal, gas coal, fat coal, lignite in five categories. Coking coal is used to refine coke. The power plant's coal coal power coal can also be said that under normal circumstances, can not be used for coking coal can be used to make electricity.
Q:Ask: coking coke tower tower and what is the relationship?If you can give a working principle to explain what is better!Coking tower in oil coking plant
Coking plant production capacity on the exclusion of the tower is also on the two: first, the coal tower; the two is coke bin;
Q:With the number of 1 tons of steel smelting coke
Because it can reduce energy consumption and reduce costs. So in the iron and steel enterprises coke rate decreased as the main goal of public relations, all the staff for the blast furnace coke rate reduction efforts. A few data in Liaoning, the average coke rate of Anshan and Benxi, Anshan Benxi is 330kg/t, is 360kg/t, that is to say a pig needs 330 360kg and coke production 2 saddle of the iron and steel enterprises. Shanghai Baosteel coke for the best in the country, can reach about 280kg/t. Is about 280kg per ton iron coke, the national leading level.
Q:I see that there are metallurgical coke and coke on the Internet, what is the difference between them (I hope to be able to say in detail) and a level of two points, how is this going on?.. Where is the quality of coke in China? Hunan good coke plant which? Although the problem is a little bit more, I hope that insiders can give some useful information. Extremely grateful.
I see that there are metallurgical coke and coke on the Internet, what is the difference between them (I hope to be able to say in detail) and a level of two points, how is this going on?.. Where is the quality of coke in China? Hunan good coke plant which? Although the problem is a little bit more, I hope that insiders can give some useful information. Extremely grateful.
Q:What are the uses of these early industrial iron and steel? Any difference?What kind of carbon do we eat in the middle of a long strip of carbon?
Coke:The utility model is mainly used for blast furnace ironmaking and smelting of blast furnace for non-ferrous metals such as copper, lead, zinc, titanium, antimony, mercury, etc.. The use of coke instead of charcoal in the blast furnace has laid the foundation for the large-scale development of modern blast furnaces and is a major milestone in the history of metallurgy. In order to achieve better technical and economic indexes of blast furnace operation, the coke (metallurgical coke) must have proper chemical and physical properties. In addition to a large number of coke used in iron smelting and non-ferrous metal smelting (metallurgical coke), but also for casting, chemical, calcium carbide and iron alloy, the quality requirements are different. Such as foundry coke, generally require large size, low porosity, high fixed carbon and low sulfur; chemical gasification, strict requirements for strength, but requires good response, high ash melting point; calcium carbide and coke production requirements to improve the fixed carbon content.
Q:China's coke iron smelting began in what time?
The ancient iron smelting method in smelting iron block, lower temperature, iron ore solid reduction sponge iron, and iron into play by forging. Smelting iron block, furnace, furnace with ground and shaft 3. The block iron making in our country began in the spring and Autumn period, and in the near future, the pig iron with more than 2% carbon dioxide was refined and used as a casting tool
Q:We would like to export a batch of coke, I would like to know what information is required for a permit
2013 coke export tariffs and quota system has been canceled, with foreign trade business qualifications can be engaged in foreign trade coke business. After signing the coke export contract with the foreign trade, the foreign trade enterprise needs to apply for the electronic key to apply for the export license. The electronic key and export license shall be handled as follows:
Q:Coke is how to make it? What is the use?
Coke production has prepared the material into the coal charging car from coal tower, were sent to the furnace chamber. The gas produced by the dry distillation is sent to the chemical product recovery workshop for processing. After a coking period (from charging to pushing the required time is generally 14 to 18 hours, depending on the carbonization chamber and the width), a pusher will mature by refining coke coke machine into the coke car; coke quenching, coke is discharged into the cold coke; then screening and storage (Figure 4).The coking plant is generally composed of two coke ovens. The two coke ovens are arranged on the same central line, and a coal tower is arranged in the middle. A furnace with coke oven machinery -- corresponding charging car and coke machine, machine coke, coke quenching car and motor vehicle; also equipped with a set of facilities including coke quenching, coke quenching tower, coke quenching pump, coke powder and coke powder sedimentation tank grab, arranged in the end furnace group. The center of the coke quenching tower is not less than 40 meters from the center of the carbonization chamber. If dry coke quenching, coke oven station. The coking plant is also equipped with the necessary piping and reversing system.
Q:What are the national standards for grade two coke?
Two national standards for metallurgical coke: total sulfur: 0.61 - 0.80; ash: 12.01 - 13.50

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches