Metal Studs Sizes C Channel Metal Stud for Drywall Partition

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1000 pc
Supply Capability:
500000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Metal Studs Sizes C Channel Metal Stud for Drywall Partition

 

1. Galvanized Steel Profiles raw material is high quality hot dipped zinc galvanized steel strip, absolute damp proof , heat insulation and high durability , high rust resistance.
2. Hot dipped zinc galvanized stee strip zinc coating is 80-180g/m2.
3.Warm sales in Middle East , Africa ,  Malaysia ,and America , which have enjoyed an excellent reputation with high quality and services
4. The specification can follow up customer requirments.
5. Advanced equipment can make sure exactly size, high quality products.

 

Detail description

1.Materials:galvanized steel strip

2.Thickness:0.4-1.2mm, size:90*40, 90*50

3.Length:2.8m,3.0m,3.2m or according to order

4.OEM steel keel service can be avaliable

5.Package: bundle package with plastic strip

6.Application; drywall partition

Specification

components of drywall system

Metal Studs Sizes C Channel Metal Stud for Drywall Partition


Function and advantage

1.good quality, hot dip galvanized steel coil

2.light weight , easy install

3.surface: zinc coat, full with dot, high strength

4.strong bearing capacity, ametabolic

5.the production ability strong, 21 production lines-3200 tons per month

6.meet the GB standard


Package and delivery time

Packing-- 10pcs/bundle, nude package with plastic strip

MOQ- 10tons, can negotiate

Delivery time-- commonly 2 weeks after received the 30% deposit


FAQ

1. Is OEM available?

Re: Yes, OEM service is available.

2. Are you factory?

Re: Yes. we are the largest factory in China.

3. Can we get sample?

Re: Yes, sample is free for our customer.

4. How many days for production

Re: usually 2 weeks after receiving of downpayment

 

Pictures

Metal Studs Sizes C Channel Metal Stud for Drywall Partition

 


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:6 meters high ceiling to do 4 meters with light steel keel do wall light steel dragon skeleton is to do 6 meters to the top or do high
Formal practice, must be done to the top, unless it is not the request, nobody tube project, it may not be the top.
Q:Light steel keel wall Why use gypsum board to do grass-roots level?
It is not necessary to use gypsum board but gypsum board there are many other materials can not replace the advantages of easy paint on the paint, such as latex is also its weight is more suitable for the keel does not have too much pressure on the pressure there are other advantages One by one in detail the gypsum board used in light steel keel partition is a good choice
Q:Light steel keel should be how to strengthen, in order to make solid wood door installed more prison?
Light steel keel wall strength regardless of Zeyang are a heart disease, if there is room, then the proposal is still good wall
Q:100 light steel keel 9.5mm thick gypsum board double double-sided partition three times, three times latex paint.
Light steel keel a 3 meters, just the height of the wall is 3m, vertical wall keel is not a waste of material.
Q:Gypsum board wall is generally done to the height of the original roof or do the height of the ceiling?
First cut off, after the cut off does not matter. Fixed the problem to your decoration workers. No headache. The First cut off, after the ceiling so that when the ceiling of the wall at the top of the site good handling. Cut off the height of more than 3 meters a few centimeters on it.
Q:How to do woodworking partition wall, with door
Wood keel partition wall inspection standards: the size of the partition is correct, the material specifications are consistent: the wall straight, smooth, corner of the orthogonally close F along the ground, along the top of the wood and the edge of the wall, Firm and straight. Check the partition wall, with 2 m ruler detection, the surface roughness error is less than 2 mm, vertical plane tolerance is less than 3 mm, seam height difference is less than 0.5 mm.
Q:Lightweight wallboard light steel keel how to construction
Light ends of the keel should be installed firmly, keel and the base of the fixed point spacing should not be greater than one meter, installed through the series keel, less than three meters of the partition to install a three to five meters installed two When the transverse joints are not on the edge, along the top keel, should be added to the dragon keel fixed, doors and windows or special joints to install additional keel should meet the design requirements of the skeleton wall in the installation of decorative panels should check the firmness of the skeleton , Whether the installation of wall equipment, pipeline and filling materials meet the design requirements If there is a non-compliance should take measures. Light wall panels The installation process as long as the step by step, the order of work also need to be more cautious.
Q:Light steel keel + gypsum board + surface brush latex paint partition wall per square meter offer is how much?
Light steel keel about 12-13 yuan, enough to do a square, gypsum board per square 16 yuan (double) or so, paint workers wages about 25 yuan. / Square (package workers package material); Labor costs about 18 yuan, all offer for 75 yuan or so.
Q:To warm the above has been tiled, with light steel keel to build a wall, how to fix the keel?
With a lightweight partition, brick, and do not do gypsum board wall.
Q:How to remove the gypsum board cut off
To deal with the local property, to understand the removal of the area to be noted, such as the demolition of the mall will be sealed room, so that the impact of dust and garbage next door store business. And the parties to deal with more, will facilitate the back of the work.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range