• Metal Layher Allround Scaffolding with En12810 Standard  and SGS Certified CNBM System 1
  • Metal Layher Allround Scaffolding with En12810 Standard  and SGS Certified CNBM System 2
  • Metal Layher Allround Scaffolding with En12810 Standard  and SGS Certified CNBM System 3
Metal Layher Allround Scaffolding with En12810 Standard  and SGS Certified CNBM

Metal Layher Allround Scaffolding with En12810 Standard and SGS Certified CNBM

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
50 m.t.
Supply Capability:
30000 m.t./month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

  • Quick Details of Metal Layher Allround Scaffolding with En12810 Standard  and SGS Certified 

  • Type:High Building

  • Material:Steel

  • Lapping Form:Full Scaffolding

  • Framework:Combined Scaffolding

  • Supporting Mode:Wall Hanging Scaffolding

  • Erection Position:External Scaffolding

  • Scaffolding Part Type:Scaffolding Platform

  • Move Method:Horizontal mobile Scaffolding

  • Structural Style:Tower Scaffolding

  • Surface Treatment:Hot DIP Galvanized, Galvanized, DIP Painted

  • Certificate:En12810, SGS Test Report for Loading Capacity

  • Color:Silver, Dark Red, Orange

  • Production Capability:100 Tons Per Week

  • Delivery Time:About 20-30 Days After Confirmation

  • Export Markets:Global


  • Metal Layher Allround Scaffolding with En12810 Standard  and SGS Certified CNBM

  • Metal Layher Allround Scaffolding with En12810 Standard  and SGS Certified CNBM

  • Metal Layher Allround Scaffolding with En12810 Standard  and SGS Certified CNBM


  • Descriptions of  Metal Layher Allround Scaffolding with En12810 Standard  and SGS Certified 

  • 1. Standard:
        3000mm, 2500mm, 2000mm, 1500mm, 1000mm, 500mm.
    2. Ledger:
        3000mm, 2000mm, 1780mm, 1500mm, 1000mm, 500mm.
    3. Diagonal brace:
        3000x2000mm, 1780x2000mm, 1000x1500mm, 1000x2000mm, 1500x2000mm.
    4. Tube specification:
        Φ 48.3x4.0mm, φ 48.0 x3.25mm, φ 48.0 x3.0mm.
    5. Surface Finish:
        Hot DIP Galv. Electric Galv.Powder coating, Dip Painting.
    6. Material:
        Q235, Q345
    7. Certificate: 
        EN12810,SGS test report for loading capacity.

The Parts of  Metal Layher Allround Scaffolding with En12810 Standard  and SGS Certified 

DESCRIPTIONMATERIALQTY.   (PCS)W. T.     (KG/PC)SURFACE
3.00m  standardQ345  48.3*3.2mm1.00 15.3Hot-dipped  Galvanized
2.50m  standardQ345  48.3*3.2mm1.00 12.9Hot-dipped  Galvanized
2.00m  standardQ345  48.3*3.2mm1.00 10.5Hot-dipped  Galvanized
1.50m  standardQ345  48.3*3.2mm1.00 8.1Hot-dipped  Galvanized
1.00m  standardQ345  48.3*3.2mm1.00 5.7Hot-dipped  Galvanized
0.50m  standardQ345  48.3*3.2mm1.00 3.3Hot-dipped  Galvanized
2.00m  ledgerQ345  48.3*2.5mm1.00 6.8Hot-dipped  Galvanized
1.80m  ledgerQ345  48.3*2.5mm1.00 6.2Hot-dipped  Galvanized
1.50m  ledgerQ345  48.3*2.5mm1.00 5.3Hot-dipped  Galvanized
1.20m  ledgerQ345  48.3*2.5mm1.00 4.4Hot-dipped  Galvanized
0.90m  ledgerQ345  48.3*2.5mm1.00 3.5Hot-dipped  Galvanized
0.60m  ledgerQ345  48.3*2.5mm1.00 2.6Hot-dipped  Galvanized
2.00*2.00m  braceQ235  33.5*2.3mm1.00 7Hot-dipped  Galvanized
1.80*2.00m  braceQ235  33.5*2.3mm1.00 6.7Hot-dipped  Galvanized
1.50*2.00m  braceQ235  33.5*2.3mm1.00 6.4Hot-dipped  Galvanized
1.20*2.00m  braceQ235  33.5*2.3mm1.00 6.1Hot-dipped  Galvanized
2.00*1.50m  braceQ235  33.5*2.3mm1.00 6.3Hot-dipped  Galvanized
1.80*1.50m  braceQ235  33.5*2.3mm1.00 6Hot-dipped  Galvanized
1.50*1.50m  braceQ235  33.5*2.3mm1.00 5.6Hot-dipped  Galvanized
1.20*1.50m  braceQ235  33.5*2.3mm1.00 5.2Hot-dipped  Galvanized
0.90*1.50m  braceQ235  33.5*2.3mm1.00 4.9Hot-dipped  Galvanized
0.60*1.50m  braceQ235  33.5*2.3mm1.00 4.7Hot-dipped  Galvanized
2.00*1.00m  braceQ235  33.5*2.3mm1.00 5.8Hot-dipped  Galvanized
1.80*1.00m  braceQ235  33.5*2.3mm1.00 5.4Hot-dipped  Galvanized
1.50*1.00m  braceQ235  33.5*2.3mm1.00 4.9Hot-dipped  Galvanized
1.20*1.00m  braceQ235  33.5*2.3mm1.00 4.5Hot-dipped  Galvanized
0.90*1.00m  braceQ235  33.5*2.3mm1.00 4.1Hot-dipped  Galvanized
0.60*1.00m  braceQ235  33.5*2.3mm1.00 3.8Hot-dipped  Galvanized
2.00*2.00m  braceQ345  48.3*2.5mm1.00 10.2Hot-dipped  Galvanized
1.80*2.00m  braceQ345  48.3*2.5mm1.00 9.8Hot-dipped  Galvanized
1.50*2.00m  braceQ345  48.3*2.5mm1.00 9.2Hot-dipped  Galvanized
1.20*2.00m  braceQ345  48.3*2.5mm1.00 8.8Hot-dipped  Galvanized
2.00*1.50m  braceQ345  48.3*2.5mm1.00 9.1Hot-dipped  Galvanized
1.80*1.50m  braceQ345  48.3*2.5mm1.00 8.7Hot-dipped  Galvanized
1.50*1.50m  braceQ345  48.3*2.5mm1.00 8Hot-dipped  Galvanized
1.20*1.50m  braceQ345  48.3*2.5mm1.00 7.4Hot-dipped  Galvanized
0.90*1.50m  braceQ345  48.3*2.5mm1.00 7Hot-dipped  Galvanized
0.60*1.50m  braceQ345  48.3*2.5mm1.00 6.6Hot-dipped  Galvanized
2.00*1.00m  braceQ345  48.3*2.5mm1.00 8.3Hot-dipped  Galvanized
1.80*1.00m  braceQ345  48.3*2.5mm1.00 7.7Hot-dipped  Galvanized
1.50*1.00m  braceQ345  48.3*2.5mm1.00 7Hot-dipped  Galvanized
1.20*1.00m  braceQ345  48.3*2.5mm1.00 6.2Hot-dipped  Galvanized
0.9*1m  braceQ345  48.3*2.5mm1.00 5.6Hot-dipped  Galvanized
0.6*1m  braceQ345  48.3*2.5mm1.00 5.2Hot-dipped  Galvanized
0.88m  board  bracketQ345  48.3*2.5mm1.00 9.5Hot-dipped  Galvanized
0.60m  base  collar  downQ235  38.1*4.5mm1.00 4.4Hot-dipped  Galvanized
0.60m  base  collar  upQ235  38.1*4.5mm1.00 5.2Hot-dipped  Galvanized
0.24*2.00m  PlankDX51D-Z801.00 8.2Hot-dipped  Galvanized
0.24*1.80m  PlankDX51D-Z801.00 7.5Hot-dipped  Galvanized
0.24*1.50m  PlankDX51D-Z801.00 6.5Hot-dipped  Galvanized
0.24*1.20m  PlankDX51D-Z801.00 5.5Hot-dipped  Galvanized
0.24*0.90m  PlankDX51D-Z801.00 4.5Hot-dipped  Galvanized
0.50*2.00m  PlankDX51D-Z801.00 15.3Hot-dipped  Galvanized
0.50*1.80m  PlankDX51D-Z801.00 14Hot-dipped  Galvanized
0.50*1.50m  PlankDX51D-Z801.00 11.9Hot-dipped  Galvanized
0.50*1.20m  PlankDX51D-Z801.00 9.9Hot-dipped  Galvanized
0.50*0.90m  PlankDX51D-Z801.00 7.9Hot-dipped  Galvanized
  • FAQ

  • 1. What is considerations of Scaffolding installation?

  • There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,

  • (1) scaffold frontage hurtful to prevent falling objects protection is required.

  • (2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator

  • 2.What are the certifications of your products?

  • Certified by SGS, BS1139, EN74, Local Test Report.

  • 3. How long is the warranty period for your product?

  • Our products warranty is 2 years.

Q:21M high full scaffold erection scheme
2 should be based on the results of the inspection to improve the construction organization design of the demolition of the order and measures, approved by the competent authorities before the implementation;3 removal of debris and ground barriers on the scaffold.4.2 removal of scaffolding, should meet the following requirements:
Q:How to calculate the vertical force of scaffolding
First, the calculation of small beams: small beams in accordance with the strength and deflection calculation of simple beams, small bars in the upper bar. According to the small bar scaffold board and live loads above the maximum bending moment and deformation the uniform load calculation of small bar.
Q:Specification and type of scaffold erection
2 fasteners should be qualified factory, where brittle crack, deformation, sliding wire shall not be used. 3 steel scaffolding should be 2 ~ 3mm thick No. 3 steel plate, with the length of 1.4 ~ 3.6m, 23 ~ 25cm, width of rib height should be 5cm, available on both ends of connecting device, surface with anti slip hole, where the crack distortion may not be used.
Q:Which hurts less, the piercing at the top of the ear, or the piercing from one side of the upper ear to the other?Thanks. =)
The first piercing of the scaffold will feel the same as getting your helix done. The second will hurt a bit more. The healing of a scaffold, however, will probably be more painful than just one helix piercing and will take a bit longer.
Q:First of all, is it painful? Obviously it will be painful I know, but is it severe?Also, what cleaning solutions/products do I need to minimise the risk of infections?And what type of bar should I get? I've heard that Bioplast and PTFE allow for better flexibility and therefore quicker healing, but wouldn't a flexible bar lead to mis-alignment on the two pierced holes? If this is so, what types of steel are safe for initial piercings?Thanks c:
Ask how long they have been piercing and what certifications (if any) they carry, additionally verify close by regulations to ascertain if any are required. additionally ask how generally they spore verify their autoclave and while it grew to become into accomplished final time. Ask to ascertain a portfolio of HEALED piercings, exceptionally pictures of in spite of piercing you try to get.
Q:i have an interview tomorrow but have a scafold piercing in , its been in there for about 2/3 months nearly healed competely , how ling can i leave it out for , maybe 30-45 minutes? thanks
They take around 6-9 months to heal completely...you shouldn't be taking it out at all. I stupidly took mine out after 3 months to clean a bit behind the bar and the bar would never go back through the top hole. It hurt like crap and bled profusely if I tried to push it through.
Q:there is also shrubs and trees planted on the base of the wall and 14 feet from it
you should have thought about all this before you bid. Now it`s your problem
Q:Scaffold Piercing Aftercare?Ok, so I was looking into getting an industrial piercing. However, I am very very serious about the aftercare, and I would dread any infection or anything going wrong. So, I was wondering, what are some aftercare cleaning tecniques/methods? I already know that antibacterial soap is good, as is the H20 cleaning spray stuff. And that you are supposed to clean it twice a day. But how and when should I do this? I have school which I can clean it before I go in the morning, but I don't get back until four, and then I take a shower at night always. I know it sounds silly, but are there some tips you have? Thanks!
I've had my industrial for over two years, it's a great piercing but aftercare is important and it does take awhile for it to heal. Here was my schedule for my industrial and all of my piercings since then... When I got my industrial I was in school until about 4 pm as well (I'm no longer in school now so I do it a little differently now) so this schedule might be doable for you. I took showers in the morning but that's not a huge problem. I'd wake up in the morning and while showering I'd clean my piercing with antibacterial soap AFTER I washed my hair and did my other shower rituals. Then when I got out of the shower I would do a short sea salt soaks (sea salt soaks are going to be much better for your piercing than H2O). I'd mix non-iodized sea salt in a clean new dixie cup with warm water, then I'd bend over and let my ear soak in the water for about five minutes. Sea salt soaks are great because they help promote healing and prevent/clean up infections. Then I'd go to school and after school I'd do a simple little rinse with a saline solution (which you can buy at any grocery store, usually around the contact supplies). Saline is good for when you're in a rush and don't have time to do a sea salt soak. Then at night I'd do a long sea salt soak and I'd soak my ear for about 10-15 minutes. Now for you, since you shower at night I would clean my ear with antibacterial soap every night in the shower and do a long sea salt soak after my shower, before bed. Then in the morning I'd so a short little sea salt soak before school and after school you can use a saline solution or the H2O. Good luck! This worked for me with all 6 of my piercings.
Q:This is an answer to irreducible complexity. Are there any examples that we see in animals or organs? or on the cellular level? Are vestigial organs a form of quot;scaffoldingquot; that are in the process of being removed?
The classic demonstration was in the E. coli long term experiment. A strain gained the ability to metabolize citric acid after 31,500 generations. Culturing preserved strains from 15,000 and 20,000 generations showed that there was an event that occurred in between that enabled the later conversion to citrate metabolism.
Q:I would like to ask how much scaffolding steel prices, scaffolding steel pipe use what are the requirements?
Hello, you ask this question is not answered, you are building it, I am here to help you check a lot of information on the Internet, here to share with you, you can look at the reference price, the price there is no uniform standard, each region is different, the price is for reference only. Practice has proved that the new scaffold not only safe and reliable construction, installation speed, and the amount of steel scaffolding can be reduced to 33%, disassembly efficiency is improved by more than two times, the construction cost can be decreased, the construction site civilization, clean and tidy.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords