Metal Hose

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT or LC
Min Order Qty:
1 Unit set
Supply Capability:
10000 Units per Week set/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:


metal hose:Good flexibility, resistant to high temperature, corrosion, .absorb the vibration, noise, thermal expansion






Stiffening ring



Mesh jacket






metal hose Features

metal hoseis installed between exhaust pipes and silencers in the engine, which can damp vibration and reduce noise. It is easy to install and can extend the system life of exhaust silencers.

YBR-6001 Series Parameters

D: single-layerS: Double-layer


1. metal hose To absorb effectively the vibration, noise, thermal expansion from pipeline system;

2. To resolve minor deviation because of piping connection and eliminate the pipeline residual stress;

3. Good flexibility, resistant to high temperature, resistant to corrosion, anti-fatigue.



For the chemical industry, metallurgy, electricity, shipbuilding, construction and other industries. 

Application temperature-50~ 300.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What do you mean by pipe fittings 3/4?
Supplement:1 inches =25.4 mm, =8 British points, 1/2 is four points (4 British points), DN diameter 15mm, 3/4 is six points (6 points), DN20mm.
Q:The pipe connections have different diameters. Reducing the diameter, what else?,
Six links, or even moreAccording to material classification, same material, different material
Q:Specification for thread of gas couplings
1, the trachea quick change joints, referred to as pneumatic joints.2, pneumatic connectors have foreign brands and domestic brands.
Q:How about the water pipe fittings and millimeters?20mm is 425mm is 6Why
This is the confusion caused by the confusion of the three conceptsA,4 points, is commonly known as, should be 1/2 inches,.4/8 is 4 copies6 points, 3/4 inches,.6/8 is 6 copies
Q:How should thread thread be broken in the joint?
Either change or repair!Maintenance depends on the circumstances, processing capacity is convenient, if not, then some programs are sometimes out of the question! Here are a few options for you to choose from:1, in the middle of the broken wire hole, the wire breaking out with broken wire puller or other fixtures.2, in the broken wire head to open a groove or welding nut go up, screw out the broken wire.3, the broken wire will be drilled directly.4, the electric spark will break the wire destroyed.
Q:Is the thread at the two ends of the card sleeve the same?
Sleeve type pipe joint sealing pipe joint is applicable to oil, water, gas and other non corrosive or corrosive medium, with plastic pipe specifications are flexible, and pipeline connection, has the characteristics of reliable connection, good sealing performance, so it is widely used in oil refining, chemical industry, light industry, textile, defense, metallurgy, aviation, shipbuilding and other systems; also suitable for hydraulic transmission of various mechanical engineering, machine tools and other equipment pipeline.
Q:What is the liquid used in the fire hose joint?
Most of the interfaces used for the groove connection are diluted detergent or soapy water
Q:What are the differences between hydraulic couplings and fittings and elbows?
Connector: when the pipe joint and the equipment are connected, the connection mode does not match or needs to be changed, and the task is finished by the connector body. One end of the joint body is connected with the pipe joint, and one end is connected with the equipment.
Q:Hot melt pipe joint leakage how to do?
2, dry leakage parts, with Wang Yu (waterproof cement) to buy. Less water, very thick situation, large surface paste in the water leakage position. This method is also used to remedy cast iron pipes.
Q:What are the sealing ways of pipe joints? Thank you
PTFE raw tape. Sealant。 If it is steel and copper inside and outside the thread, as long as the tightening, what sealing material can be used.
Our products are of advanced design, rational structure, stable performance, and flexible and high anti-fatigue properties. With our quality assurance system, we improve comprehensive test means and attain the ISO9001 quality system certification and pressure pipe component production license.

1. Manufacturer Overview

Location Jiangsu, China (Mainland)
Year Established 2004
Annual Output Value
Main Markets North America
South America
Eastern Europe
Southeast Asia
Mid East
Eastern Asia
Western Europe
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage 41% - 50%
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size: 5,000-10,000 square meters
No. of Production Lines 5
Contract Manufacturing OEM Service Offered Buyer Label Offered
Product Price Range